cover
Contact Name
Henriette D. Titaley
Contact Email
henriette.titaley@polnam.ac.id
Phone
+6282188099397
Journal Mail Official
henriette.titaley@polnam.ac.id
Editorial Address
Jl. Ir. M. Putuhena, Wailela-Rumah Tiga, Kota Ambon Provinsi Maluku
Location
Kota ambon,
Maluku
INDONESIA
Jurnal Agregate
ISSN : -     EISSN : 29645158     DOI : https://doi.org/10.31959/ja.v2i1
Core Subject : Engineering,
Jurnal Agregate adalah Jurnal yang memberikan informasi ilmiah tentang perkembangan ilmu pengetahuan dan teknologi bidang Struktur, Bahan Bangunan Dan Kegempaan, Teknik Sumber Daya Air, Transportasi, Management Konstruksi, Geoteknikal, Teknik Pantai Dan Tsunami.
Articles 14 Documents
Search results for , issue "Vol. 3 No. 2 (2024): September" : 14 Documents clear
ANALISA KONDISI KERUSAKAN LAPISAN PERMUKAAN JALAN DESA SAKA – WAILULU SERAM UTARA BARAT KABUPATEN MALUKU TENGAH Purwanto, Hadi; Soumokil, Musper David; Sihasale, Stephanie Jenifer
Journal Agregate Vol. 3 No. 2 (2024): September
Publisher : Jurusan Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/ja.v3i2.2272

Abstract

Highways are one of the supporting facilities for an area that can accelerate economic growth and development in that area. The highway in Saka - Wailulu Village is located on Jalan Taniwel - Saleman, one of the national roads in Maluku Province, Central Maluku Regency, North West Seram District. This research aims to determine the condition and type of road damage and determine the PCI value. The PCI method is a method that can assess the type of road pavement damage and the severity of the road. The results of the analysis of road conditions in Saka - Wailulu Village, Taniwel - Saleman Section using the PCI method showed an average PCI value of 72,375 with a verry good rating with 8 types of damage occurring, namely alligator cracking, potholes, block cracking, whaethering or raveling, patching and utility cut patching, joint reflection cracking, shoving and depression.
PASAK KAYU SEBAGAI BAHAN ALTERNATIF ALAT SAMBUNG PADA KONSTRUKSI KAYU Gunawan, Firman; Roberth, Herry Henry; Picauly, Fredy
Journal Agregate Vol. 3 No. 2 (2024): September
Publisher : Jurusan Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/ja.v3i2.2314

Abstract

Pegs are a connecting tool in wood construction that is used as the main material to connect wooden beams with one another wooden beam so that they can be strengthened and united. One of the woods that will be made pegs is merbau wood which is found in Maluku. The research method used is an experimental method carried out through an experiment to obtain information on an object of research. This research was conducted at the Laboratory of the Department of Civil Engineering of Ambon State Polytechnic. The number of specimens used is 9 pieces with a peg diameter of 15 mm and variations in pedestal widths of 20 mm, 30 mm and 40 mm totaling 3 pieces each. Of the three variations of test specimens, there is an average maximum load on each test specimen, namely for a 20 mm pedestal of 15000 N, test specimen 2, a 30 mm pedestal of 16500 N and test specimen 3, a 40 mm pedestal of 17166.67 N and the average shear strength produced is, 42.46 Mpa at a pedestal thickness of 20 mm, 46.71 Mpa for wood thickness of 30 mm,  and 48.59 Mpa for 40 mm wood thickness.
ANALISIS KINERJA STRUKTUR GEDUNG BERTINGKAT DENGAN MENGGUNAKAN METODE STATIC NON-LINEAR (STUDI KASUS : GEDUNG DPRD KABUPATEN MALUKU TENGAH) Pattiwael, Krisselto; Frans, Pieter Lourens; Hutubessy, Vector R. R.
Journal Agregate Vol. 3 No. 2 (2024): September
Publisher : Jurusan Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/ja.v3i2.2115

Abstract

Central Maluku Regency is an area prone to earthquakes because it is included in one of the 5th earthquake zone areas in Indonesia, so it is very necessary to analyze the performance of structures against earthquakes. The purpose of this research is to produce the displacement value between floors in the upper structure of the Central Maluku Regency DPRD Building and obtain the performance of the upper structure of the Central Maluku Regency DPRD Building with non-linear static analysis with the help of the SAP2000 v.22 program. This research shows several conclusions.  The displacement value between plants due to the largest X-direction earthquake load is 21.19 mm, and the largest Y-direction displacement is 20.73 mm. Evaluation of structural performance The results of the X-direction review capacity curve show that the building is included in the IO condition, while the Y-direction review provides an overview of the behavior of the structure experiencing elastic, in-elastic conditions and then experiencing collapse shown by the curve with a decrease. In the Y direction, the building is included in the IO condition. The design concept of a strong column weak beam is fulfilled, this is because, in the structural elements of the building, the beam experiences plastic conditions earlier than the column.
PENGGUNAAN PASAK PELEPAH SAGU SEBAGAI ALTERNATIF ALAT SAMBUNG PADA KONSTRUKSI KAYU Sawaluddin, Risky; Picauly, Fredy; Tuanakotta, Abraham
Journal Agregate Vol. 3 No. 2 (2024): September
Publisher : Jurusan Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/ja.v3i2.2166

Abstract

Stakes have long been known as a joint tool in wooden construction made using wood that has high shear and bending resistance, because hardwood is starting to be scarce, so this test is carried out to find other alternative materials as a substitute for wooden pegs that have high resistance, knowing how much shear strength is obtained in sago frond pegs, and the influence of pegs with variations in wood thickness on the size of the shear strength. The research method used is experimental, which is an experimental method in which an experiment is carried out to obtain information about something being experimented. This research was carried out in the Laboratory of the Department of Civil Engineering, Ambon State Polytechnic, using sago fronds as a sample in the test. The data collection technique used is experimental on test objects. The results of the shear strength test obtained on the sago frond peg at the base width of 20 mm were obtained that the average shear strength was 40,103 MPa, the width of the 30 mm base was 44,821 MPa and the width of the 40 mm base was 47,652 MPa, so it can be concluded that the shear strength is affected by the size of the support, the larger the base the greater the shear force received.
PERENCANAAN DINDING PENAHAN TANAH PADA AREA LONGSOR DI JALAN SYARANAMUAL DESA POKA KOTA AMBON Rahantoknam, Wirda; Kumbangsila, Ruben; Betaubun, Renny James
Journal Agregate Vol. 3 No. 2 (2024): September
Publisher : Jurusan Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/ja.v3i2.2217

Abstract

Syaranamual street is situated in Poka Village, Ambon . It is one of the provincial roads affected by landslides due to its location near a fairly high slope/cliff, precisely at Batu Koneng  Fruit Market, Poka Village. The landslide disaster that occurred was due to the influence of bad weather in the form of high-intensity rain accompanied by strong winds that hit Ambon city, so a solution was needed in the form of planning the construction of a retaining wall. The research aims to plan the dimensions of the retaining wall and analyze and determine the safety factor for the stability of the retaining wall in the landslide area on Jl. Syaranamual, Poka Village, Ambon . The method used in this study is by using theory and also empirical formulas according to Rankine about active earth pressure and passive earth pressure on retaining walls and the Terzaghi method regarding soil bearing capacity. The study results show that the planned retaining wall is a gravity retaining wall with height (H) = 4 m, bottom width (B) = 2.4 m, top width (T) = 0.3 m, and Df = 0.5 m. The safety factor obtained from the calculation results is that the wall is stable against the shear force with a value of 2.2 > 1.5 (Safe), the wall is stable against the overturning force with a value of 2.03 > 1.5 (Safe), and the safety factor for the stability of the retaining wall obtained is 3 (Safe).
ANALISIS FAKTOR KETERLAMBATAN PADA PROYEK PEMBANGUNAN GEDUNG RUANG KELAS BARU MADRASAH 5 MALUKU TENGAH Umarella, Risma; Leuhery, Lenora; Abdin, Maslan
Journal Agregate Vol. 3 No. 2 (2024): September
Publisher : Jurusan Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/ja.v3i2.2221

Abstract

The construction project for the Central Maluku 5 Madrasah New Classroom Building project was carried out by CV Nadilla with a contract value of Rp. 2,891,000,000 and the duration of work is 119 calendar days in accordance with the contents of the work contract. The Central Maluku 5 Madrasah New Classroom Building Construction project experienced a delay in the 1st (first) week, with a cumulative plan of 0.15% but in reality it was 0.00%. then in the 14th week with a cumulative plan of 20.54% but in reality it was obtained 17.50%. and the 15th week with a cumulative plan of 44.26% but in reality it was obtained 42.03%. The research method uses data collection techniques and questionnaires with the types of data used are primary data and secondary data. Methods of data analysis using validity test, reliability test, factor analysis test, and F test and T test using toolsStatistical Program for Social Scine (SPSS) version 29 where in this method data will be obtained from the results of the questionnaire which will then be analyzed with the SPSS version 29 tool. The magnitude of the influence of the factors causing the delay in the Construction Project for the New Classroom Building for Madrasah 5 Central Maluku is due to the Labor factor (X1), Material (X2), Environmental (X3), and Managerial (X4), have an effect on the Delay variable (Y), because the significant value obtained is 0.000 which is smaller than 0.05 and the calculated F value obtained is 103.072 which is greater than the F table value of 2.74. The components of the factors causing the delay in the construction project of the New Classroom Building for Madrasah 5 Central Maluku were caused by the Labor factor (X1) with a valueStandardized Coefficients Beta of 0.369, Material (X2) with valueStandardized Coefficients Beta of 0.271, Environment (X3) with a valueStandardized Coefficients Beta of 0.222, and Managerial factor (X4) with valueStandardized Coefficients Beta of 0.196.
ANALISIS EARNED VALUE TERHADAP BIAYA DAN WAKTU PADA PROYEK PEMBANGUNAN RUANG KELAS BARU MADRASAH TSNAWIYAH NEGERI 6 MALUKU TENGAH Walalayo, Elis; Saleh , La Mohamat; Gaspersz , Willem
Journal Agregate Vol. 3 No. 2 (2024): September
Publisher : Jurusan Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/ja.v3i2.2245

Abstract

In project implementation, project completion often occurs that is not under planning both in terms of time, cost, and quality, as well as over budget, so to overcome this, good project management is needed in the form of time, cost, and quality control. on the New Classroom Construction Project for Madrasah Tsnawiyah Negeri 6 Central Maluku located in Liang Village, Kec. Salahutu, Kab. Central Maluku which has a budget of Rp. 2,998,745,000.00 with a planned implementation time of 126 calendar days from June to October 2022 but the realization of the project was late and was completed in 168 calendar days. To overcome this problem, the author uses the earned value method. The Earned Value method is a control method used to control project costs and time in an integrated manner. From the results of the last analysis in the 24th week, the work cost index (CPI) < 1, which means that the actual costs (ACWP) incurred were greater than the planned work costs (BCWP) so that the project experienced a cost deviation with a presentation of 0.92%. or 266,915,349.35 from the project budget, while for (SPI) the time performance index in the 18th week is <1, which means the project performance is slower than the planned schedule so that the project experiences a time deviation of 168 working days with an additional 42 working days from the scheduled implementation 126 working days so that the project was completed in the 24th week.
ANALISA KONDISI KERUSAKAN LAPISAN PERMUKAAN JALAN DESA SAKA – WAILULU SERAM UTARA BARAT KABUPATEN MALUKU TENGAH Purwanto, Hadi; Soumokil, Musper David; Sihasale, Stephanie Jenifer
Journal Agregate Vol. 3 No. 2 (2024): September
Publisher : Jurusan Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/ja.v3i2.2272

Abstract

Highways are one of the supporting facilities for an area that can accelerate economic growth and development in that area. The highway in Saka - Wailulu Village is located on Jalan Taniwel - Saleman, one of the national roads in Maluku Province, Central Maluku Regency, North West Seram District. This research aims to determine the condition and type of road damage and determine the PCI value. The PCI method is a method that can assess the type of road pavement damage and the severity of the road. The results of the analysis of road conditions in Saka - Wailulu Village, Taniwel - Saleman Section using the PCI method showed an average PCI value of 72,375 with a verry good rating with 8 types of damage occurring, namely alligator cracking, potholes, block cracking, whaethering or raveling, patching and utility cut patching, joint reflection cracking, shoving and depression.
MANAJEMEN PEMELIHARAAN DAN PERAWATAN GEDUNG PADA RUMAH SAKIT PRATAMA KECAMATAN LEIHITU KABUPATEN MALUKU TENGAH Ole, Septiana; Lenora Leuhery; La Mohamat Saleh
Journal Agregate Vol. 3 No. 2 (2024): September
Publisher : Jurusan Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/ja.v3i2.2281

Abstract

Research to analyze Building Maintenance and Maintenance Management at Pratama Hospital, Leihitu District, Central Maluku Regency, before the damage to buildings and fittings is heavier and disrupts services to the community, it is necessary to have good maintenance so that the planned technical life can be achieved. where there are 5 components, namely Structural, Architectural, Electrical, Mechanical and Outdoor Layout. The study was conducted by distributing questionnaires, the data analysis technique used was SPSS 26 software. Data analysis starts with validity tests and reliability tests with statistical descriptive analysis methods. This research was conducted to determine the assessment of building users and the implementation of building maintenance and maintenance. From the results of the analysis conducted on building user ratings, descriptive analysis showed that of the 30 respondents and 3 categories with the highest frequency. Based on structural variables, 15 people rated "good enough" architectural variables, 21 people rated "good enough", electrical variables 20 people rated "good enough, mechanical variables 21 people rated "good enough", outdoor spatial variables 20 people rated "good enough", and housekeeping variables 21 people rated "good enough". It is known that the results of the implementation of building maintenance and maintenance based on the category with the highest percentage, namely the "good enough" category, including 50% structural variables.
PASAK KAYU SEBAGAI BAHAN ALTERNATIF ALAT SAMBUNG PADA KONSTRUKSI KAYU Gunawan, Firman; Roberth, Herry Henry; Picauly, Fredy
Journal Agregate Vol. 3 No. 2 (2024): September
Publisher : Jurusan Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/ja.v3i2.2314

Abstract

Pegs are a connecting tool in wood construction that is used as the main material to connect wooden beams with one another wooden beam so that they can be strengthened and united. One of the woods that will be made pegs is merbau wood which is found in Maluku. The research method used is an experimental method carried out through an experiment to obtain information on an object of research. This research was conducted at the Laboratory of the Department of Civil Engineering of Ambon State Polytechnic. The number of specimens used is 9 pieces with a peg diameter of 15 mm and variations in pedestal widths of 20 mm, 30 mm and 40 mm totaling 3 pieces each. Of the three variations of test specimens, there is an average maximum load on each test specimen, namely for a 20 mm pedestal of 15000 N, test specimen 2, a 30 mm pedestal of 16500 N and test specimen 3, a 40 mm pedestal of 17166.67 N and the average shear strength produced is, 42.46 Mpa at a pedestal thickness of 20 mm, 46.71 Mpa for wood thickness of 30 mm,  and 48.59 Mpa for 40 mm wood thickness.

Page 1 of 2 | Total Record : 14