cover
Contact Name
Ilham Nur Jabbar
Contact Email
jstl.fstl@gmail.com
Phone
-
Journal Mail Official
avec_sita@yahoo.com
Editorial Address
Jl. IPN no. 2 Cipinang Besar Selatan, Jakarta Timur, Provinsi DKI Jakarta
Location
Kota adm. jakarta timur,
Dki jakarta
INDONESIA
Jurnal Sistem Transportasi & Logistik
ISSN : -     EISSN : 28077105     DOI : https://doi.org/10.54324/jstl
Core Subject : Engineering,
Jurnal Sistem Transportasi & Logistik is a scientific periodical published by the Faculty of Transportation Systems and Logistics, Institute of Transportation and Logistics (ITL) Trisakti. It serves as an academic responsibility and a realization of the “Tri Dharma” of higher education. The journal focuses on the following areas: Transportation Policy and Logistics Systems; Planning and Development of Transportation and Logistics Systems; and Planning and Operation of Transportation and Logistics Systems.
Articles 6 Documents
Search results for , issue "Vol. 1 No. 2 (2021): Desember" : 6 Documents clear
Analisis Peramalan Permintaan dan Perencanaan Bahan Baku untuk Pengemasan Minyak Goreng Puspita, Sesaria Mardhiani Rachma; Tatiana, Yana; Jonathan, Jonathan; Parlindungan, Purbanuara; Rahfi, Muhamad Sauqi; Aradena, Athallah Aqil Ghani Halim
Jurnal Sistem Transportasi & Logistik Vol. 1 No. 2 (2021): Desember
Publisher : Institut Transportasi dan Logistik Trisakti

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54324/jstl.v1i2.781

Abstract

One of the manufacturing companies engaged in agribusiness, one of which is processing cooking oil, often occurs damage to goods due to excess stock of goods and increases expenses for storage costs. Before carrying out the production process, the company must forecast demand to find out how much the estimated raw material needs will be used as inventory control so that there is no excess or shortage of stock that will harm the company. The purpose of this study is to predict the amount of cooking oil demand in the next 12 periods, plan the lot size of raw materials with the lowest cost and determine the right time to order raw material supplies. The method used in forecasting is Autoregressive Integrated Moving Average (ARIMA) and lot size planning with Materials Requirements Planning (MRP) FOQ and POQ techniques. ARIMA forecasting results with a MAPE value of 33% and the lowest cost technique chosen by POQ
Perbaikan Kinerja Dwelling Time Di Terminal Peti Kemas KOJA di Pelabuhan Tanjung Priok Ellenlies, Ellenlies; Siahaan, Langas Denny; Ayutia, Yolla; Andarini, Amelia; Kasenda, Muhammad Hiero Rio; Parhusip, Veronica
Jurnal Sistem Transportasi & Logistik Vol. 1 No. 2 (2021): Desember
Publisher : Institut Transportasi dan Logistik Trisakti

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54324/jstl.v1i2.1034

Abstract

The terminal is the main and most important element for serving, loading and unloading of goods. The services provided are in the form of loading and unloading activities, arranging and storing goods in the transit warehouse or at the stacking yard, receiving goods to be shipped or sent and handing over the goods to the consignee after being unloaded from the ship. The waiting time or time scale required for a container from the time it is unloaded or lifted from the ship's hold (unloading) until the container leaves the port is known as the dwelling time process. The process of determining the length of dwelling time at the port is Preclearance, Custom Clearance, and Post Clearance. Dwelling time service performance research was conducted at Koja Container Terminal with descriptive quantitative methods, with a total sample of 75 service users. Data collection was carried out by distributing questionnaires with a Likert scale model that had been tested. Then the data collected was analyzed using the Importance Performance Analysis (IPA) and Customer Satisfaction Index (CSI) methods. The results of the study show that the value of the service user satisfaction index is75.29%, the level of conformity of dwelling time service performance has not met the expectations of service users, and the main priority for improving dwelling time service performance is 10 attributes that is included in quadrant A and 12 attributes have to be maintained in quadrant B.
Analisis Prioritas Pengembangan Moda Transportasi Umum Di DKI Jakarta Suryobuwono, Abdullah Ade; Raga, Paulus; Nugroho, Aditya; Tampubolon, Irvan Adam; Basalamah, Zahira Aura Rahma; Irenita, Novembriani
Jurnal Sistem Transportasi & Logistik Vol. 1 No. 2 (2021): Desember
Publisher : Institut Transportasi dan Logistik Trisakti

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54324/jstl.v1i2.1037

Abstract

Transportation is the main actor that is needed in the mobility activities of the people of DKI Jakarta in meeting the needs of the community. People's behavior in making a trip is something that cannot be avoided, one of which is avoiding city congestion. Transportation facilities and infrastructure, such as Transjakarta Buses and Commuter Lines for both within and between cities, need to be developed to reduce traffic accidents. The purpose of this research is to find out whether transportation services can be used properly in a fast time and at the right price and with optimal service, to know a good strategy to avoid negative impacts on the use of public transportation and to know the optimal performance in policies whose purpose is to protect public transportation. and provide a sense of security to users of public transportation. In this study, the analytical hierarchy process (AHP) method was used. The results of this study indicate that the order of priority for the development of public transportation modes in DKI Jakarta is Mass Rapid Transit (MRT), Light Rail Transit (LRT), Commuter Line (CL) and Transjakarta or Bus Rapid Transit (BRT) based on the criteria of cost, travel time, comfort, security, ease of access and medical.
Penerapan Metode Six Sigma untuk Menurunkan Terjadinya Keterlambatan Informasi Kedatangan Barang (NOA) dalam Kegiatan Impor Firmansyah, Iqbal; Poncotoyo, Wahyu; Maulana, Andy; Zain, Abdul Razaq; Ferdiansyah, Anton; Lestari, Sinta Ayu
Jurnal Sistem Transportasi & Logistik Vol. 1 No. 2 (2021): Desember
Publisher : Institut Transportasi dan Logistik Trisakti

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54324/jstl.v1i2.1044

Abstract

The purpose of this study was to find out and obtain an in-depth description and understanding of the problems that cause delays in the arrival of imported goods (NoA) via air cargo, as a company engaged in cargo and warehouse rental PT Jasa Angkasa Semesta provides the best service in carrying out import activities. , as well as loading and unloading activities, document preparation, and communication between shippers. The research method in writing this thesis is to take certain objects to be analyzed and understood by focusing on a problem. By using the Six Sigma method, it is hoped that it will be possible to make improvements and improvements as well as continuous improvements to the problems studied.
Efektivitas dan Efisiensi e-Procurement Pengadaan Barang Konstruksi Chamsudi, Danie Hayam Mada; Setyarto, Aries; Rahardjo, Sri; Sectio, Devin Igel; Bijaksana, Gena; Faturachman, Muhammad Rafli
Jurnal Sistem Transportasi & Logistik Vol. 1 No. 2 (2021): Desember
Publisher : Institut Transportasi dan Logistik Trisakti

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54324/jstl.v1i2.1054

Abstract

Purpose of this study is to analyze the effectiveness and efficiency of PT Metal Bakrie Industries after implementing E-Procurement to its whole procurement activities. To achieve the right and targeted research objectives, the authors formulate a problem regarding whether there are differences in effectiveness and efficiency before and after using E-Procurement at PT Metal Bakrie Industries with effectiveness and efficiency as the independent variable and E-Procurement as the dependent variable. The total population of PT Bakrie Metal Industries staff itself is 38, but only 30 people are taken as samples in this study. The software used by researchers in processing this data is SPSS version 25. This study uses a quantitative approach with data analysis techniques including instrument testing (validity and reliability) and paired t test. Based on the results of this study, after implementing E-Procurement, effectiveness and efficiency were considered better than before implementing E-Procurement. In addition, based on the paired t test, it is said that there is a difference between effectiveness and efficiency before and after using E-Procurement.
Kajian Evaluasi Kinerja Jalan Ciawi-Bogor Sebelum Pengembangan PT. ABC Fadhil, Dimas Nu’man; Suryobuwono, Abdullah Ade; Kristiadi, Aldo; Rahmat, Rahmat; Marpaung, Edward; Sakti, Reza Fauzi Jaya
Jurnal Sistem Transportasi & Logistik Vol. 1 No. 2 (2021): Desember
Publisher : Institut Transportasi dan Logistik Trisakti

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54324/jstl.v1i2.1081

Abstract

Developing factory area require construction activities which impacting traffic surround the area. Before the construction process is carried out, a traffic impact analysis (andalalin) is needed to determine the impact from the development process to operation. The method used in this study process is micro traffic simulation based on the 1997 MKJI method, from the results of the traffic survey the 1997 MKJI calculations were carried out, the total capacity of the Ciawi-Bogor road was 3,146 pcu/hour with the highest traffic volume of 2954 so that the degree of saturation reached 0.93.

Page 1 of 1 | Total Record : 6