cover
Contact Name
Nur Hasanah
Contact Email
nur.hasanah@batan.go.id
Phone
+6221-5204243
Journal Mail Official
jpen@batan.go.id
Editorial Address
Kawasan Kantor Pusat Badan Tenaga Nuklir Nasional Jl. Kuningan Barat, Mampang Prapatan, Jakarta 12710 Kotak Pos 4390 Jakarta 12043
Location
Kota adm. jakarta selatan,
Dki jakarta
INDONESIA
Jurnal Pengembangan Energi Nuklir
ISSN : 14109816     EISSN : 25029479     DOI : https://doi.org/10.17146/jpen
Jurnal Pengembangan Energi Nuklir publishes scientific papers on the results of studies and research on nuclear energy development with the scope of energy and electricity planning, nuclear energy technology, energy economics, management of nuclear power plants, national industries that support nuclear power plants, aspects of the nuclear power plant site and environment, and topics others that support the development of nuclear energy.
Articles 10 Documents
Search results for , issue "Vol 12, No 1 (2010): Juni 2010" : 10 Documents clear
Hal Muka JPEN 2010 Volume 12 Nomor 1 Juni Hal Muka
Jurnal Pengembangan Energi Nuklir Vol 12, No 1 (2010): Juni 2010
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2010.12.1.3433

Abstract

PRODUKSI HIDROGEN PROSES STEAM REFORMING DIMETHYL ETHER (DME) DENGAN REAKTOR NUKLIR TEMPERATUR RENDAH Djati Hoesen Salimy
Jurnal Pengembangan Energi Nuklir Vol 12, No 1 (2010): Juni 2010
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2010.12.1.1442

Abstract

ABSTRAKPRODUKSI HIDROGEN PROSES STEAM REFORMING DIMETHYL ETHER (DME) DENGAN REAKTOR NUKLIR TEMPERATUR RENDAH. Telah dilakukan pengkajian proses steam reforming dimethyl ether (DME) untuk produksi hidrogen dengan memanfaatan reaktor nuklir temperatur rendah sebagai sumber energi panas. Berbeda dengan proses setam reforming gas alam yang beroperasi pada temperatur tinggi (800-1000oC), proses steam reforming DME beroperasi pada temperatur rendah (300oC). Hal ini menguntungkan karena tidak memerlukan material unit operasi temperatur tinggi yang secara ekonomi jauh lebih mahal. Dari sisi aplikasi reaktor nuklir, juga menguntungkan karena hampir semua jenis reaktor daya bisa dimanfaatkan sumber energi panasnya untuk menjalankan proses, termasuk reaktor daya komersial yang saat ini beroperasi. Di samping itu, karena sebagai bahan baku DME tidak mengandung unsur belerang, unit operasi pabrik bisa lebih kompak karena tidak membutuhkan unit desulfurisasi. Kopel nuklir dengan proses dioperasikan secara kogenerasi menghasilkan hidrogen dan listrik. Kopel reaktor nuklir temperatur rendah LWR dengan proses steam reforming DME dengan konfigurasi upsteam turbine menunjukkan potensi peningkatan efisiensi termal dari sekitar 33% menjadi 53%, yaitu efisiensi produksi hidrogen (30%) dan efisiensi produksi listrik (23%). Sedangkan kopel proses dengan reaktor nuklir temperatur menengah FBR dengan konfigurasi downstream turbine menunjukkan potensi peningkatan efisiensi termal dari sekitar 33% menjadi 75%, yaitu efisiensi produksi hidrogen (49%) dan efisiensi produksi listrik (26%).Kata kunci: steam reforming DME, efisiensi termal, unit desulfurisasi, LWR, FBR ABSTRACTDIMETHYL ETHER (DME) STEAM REFORMING PROCESS FOR HYDROGEN PRODUCTION BY UTILIZATION OF LOW TEMPERATURE NUCLEAR REACTOR. The assessment of DME steam reforming process for hydrogen production by utilizing of low temperatur nuclear reactor has been carried out. Difference with natural gas steam reforming that operates at high temperatur (800-1000oC), the process operates at low temperature (300oC). This condition give the advantage since this process is not require high temperature materials for the plant, that economically more expensive. From the point of nuclear reactor application, all temperature range of nuclear reactors can be applied to supplied their heat for the process, include of commercially nuclear reactor in operation now. While, DME as raw material is free from sulfur content, so the operation unit of plant can be more compact, because the plant is not require the unit of desulfurization. The couple of the process with nuclear reactor is operate in cogeneration mode to produce electricity and hydrogen. The couple of low temperature nuclear reactor (LWR) with the process, with the configuration of upstream from turbin shows the potential of increasing efficiency from about 33% to 53% (30% efficiency of hydrogen production, and 23% electricity). While couple of the process with medium temperatur nuclear reactor of FBR shows the potential of increasing efficiency from about 33% to 75% (49% efficiency of hydrogen production, and 26% electricity).Keywords: DME steam reforming, thermal efficiency, desulfurization unit, LWR, FBR
PEMODELAN TRANSPORT SEDIMEN DI PERAIRAN PESISIR SEMENANJUNG MURIA, JEPARA Heni Susiati; Wahyu Pandoe; Yarianto Sugeng Budi Susilo; Eko Kusratmoko; Aris Poniman
Jurnal Pengembangan Energi Nuklir Vol 12, No 1 (2010): Juni 2010
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2010.12.1.1447

Abstract

ABSTRAKPEMODELAN TRANSPORT SEDIMEN DI PERAIRAN PESISIR SEMENANJUNG MURIA, JEPARA. Penelitian pergerakan transport sedimen di perairan Semenanjung Muria telah dilakukan. Dalam studi ini digunakan model matematika yang terdiri dari model hidrodinamika dan model transport sedimen. Input data yang digunakan dalam model adalah pasang surut, angin muson, dan debit sungai. Hasil simulasi pemodelan transport sedimen menunjukkan bahwa penyebab utama dari variasi pola distribusi sedimen tersuspensi di perairan Semenanjung Muria adalah pasang surut dan variasi musim.Kata kunci: pemodelan, transpot sedimen, hidrodinamika ABSTRACTMODELLING OF SEDIMENT TRANSPORT AT MURIA PENINSULA COASTAL, JEPARA. Modelling of transport sediment modelling at Muria Peninsula have been done. In this study we had been used mathematical model that consist of hydrodynamics and sediment transport . Data input for modelling has been used tidal, moonson wind, and river debit. Simulation result of sedimen transport modelling showed that tides pattern and seasonal variations are the main causes of variations in the suspended sediment distribution in Muria Peninsula.Keywords: modelling, sediment transport, hydrodynamics
MANAGEMENT OF RADIOACTIVE WASTE FROM OPERATION OF NUCLEAR POWER PLANT -PERSPECTIVE FOR INDONESIAN PROGRAM- Djarot Sulistio Wisnubroto
Jurnal Pengembangan Energi Nuklir Vol 12, No 1 (2010): Juni 2010
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2010.12.1.1443

Abstract

ABSTRACTMANAGEMENT OF RADIOACTIVE WASTE FROM OPERATION OF NUCLEAR POWER PLANT -PERSPECTIVE FOR INDONESIAN PROGRAM-. Nuclear power is the only energy industry which takes full responsibility for all its wastes, and costs this into the product. Nuclear power is characterized by the very large amount of energy available from a very small amount of fuel. The amount of waste is also relatively small. It is predicted in the near future of Indonesia NPP program, about approximately 200m3 of low and intermediate level waste and 6,76m3 of spent fuel is taken each year from the core of a l000 MWe Nuclear Power Plant. There is a new option for the spent fuel management i.e. repatriation of the spent fuel to the supplier country through Global Energy Partnership (GNEP) or Developing Global Nuclear Infrastructure (DGNI) programs. Disposal methods for radioactive wastes vary in many countries. The two main options currently employed or planned by countries are, near surface disposal facilities (for short lived and low level waste); and geologic repositories (for long lived and high level waste).Keywords: radioactive waste, management, nuclear power plant, prediction, disposal ABSTRAKPENGELOLAAN LIMBAH RADIOAKTIF DARI OPERASI PEMBANGKIT LISTRIK TENAGA NUKLIR -PERSPEKTIF UNTUK PROGRAM INDONESIA. Tenaga nuklir merupakan satu-satunya industri energi yang bertanggungjawab penuh seluruh limbah yang dihasilkannya., termasuk memperhitungkan biaya limbah dalam produksi listrik. Tenaga nuklir dicirikan dengan energi yang sangat besar berasal dari kuantitas bahan bakar yang sangat kecil. Limbah yang dihasilkannya kuantitasnya juga kecil. Diprediksikan dari operasi tiap 1000MWe PLTN di Indonesia yang akan dibangun dalam waktu dekat, akan dihasilkan 200m3 limbah aktivitas rendah dan sedang serta 6,76m3 bahan bakar bekas. Ada opsi lain untuk pengelolaan bahan bakar bekas, yaitu repatriasi ke negara asal melalui program Global Energy Partnership (GNEP) atau Developing Global Nuclear Infrastructure (DGNI). Pembuangan limbah radioaktif bervariasi di berbagai negara. Dua opsi utama adalah pembuangan limbah dekat permukaan (aktivitas rendah dan sedang), dan pembuangan di lapisan geologi (limbah umur panjang dan aktivitas tinggi).Kata kunci: limbah radioaktif, pengelolaan, pembangkit listrik tenaga nuklir, prediksi, disposal
PANTAI UTARA KABUPATEN BATANG SEBAGAI ALTERNATIF CALON TAPAK PLTN Imam Hamzah; I Gde Sukadana
Jurnal Pengembangan Energi Nuklir Vol 12, No 1 (2010): Juni 2010
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2010.12.1.1448

Abstract

ABSTRAKPANTAI UTARA KABUPATEN BATANG SEBAGAI ALTERNATIF CALON TAPAK PLTN. Telah dilakukan analisis mengenai beberapa aspek yang disyaratkan oleh Badan Tenaga Atom Internasional yang meliputi aspek antara lain: pensesaran permukaan (surface faulting), kegempaan (seismicity), material bawah permukaan (Suitability of subsurface materials), kegunungapian, banjir pantai dan banjir sungai, berdasarkan data sekunder dan analisis literatur. Tujuan analisis adalah untuk mendapatkan alternatif calon lokasi tapak interes di Pulau Jawa untuk pengembangan PLTN di Indonesia pada masa yang akan datang. Hasil analisis menunjukkan bahwa di lokasi yang ditinjau (Pantai Utara Kabupaten Batang) tidak terdapat indikasi sesar kapabel yang dapat membahayakan lokasi calon tapak dan kegempaan termasuk rendah. Pantai Utara Kabupaten Batang tersusun oleh batuan sedimen klastik formasi Damar yang diduga memiliki daya dukung baik, sehingga cukup baik untuk calon lokasi tapak PLTN. Aspek kegunungapian di wilayah tinjauan dipertimbangkan sebagai salah satu aspek keselamatan terpenting dalam analisis kelayakan tapak. Sebaran batuan gunungapi Jembangan mempunyai jarak terjauh 33,24 km, dan tidak mencapai pantai utara. Elevasi sebagian pantai utara Batang > 5m sehingga bebas dari bahaya banjir. Daerah yang baik untuk dikembangkan dan ditindaklanjuti sebagai alternatif calon tapak PLTN meliputi pantai kecamatan Batang (> 500 ha) dan pantai Kecamatan Subah-Gringsing (> 3500 ha).Kata kunci: tapak, PLTN, keselamatan, Kabupaten Batang ABSTRACTNORTH COAST OF BATANG REGENCY AS AN ALTERNATIVE OF NPP’S CANDIDATE SITE. It has been analysis that several aspects as required by International Atomic Energy Agency covering among other: surface faulting, seismicity, suitability of subsurface materials, volcanology, coastal flooding and river flooding, based on secondary data and literature analysis. The analysis is aimed in order to have an alternative of candidate site in Java Island for future Indonesia NPP development. The results of analysis indicate that North Coast of Batang Region did not have capable fault indication which is endanger potential location of candidate site and the seismicity of north coast is with in low category. The North Coast of Batang Region is composed by sediment clastic rock of Damar formation that have a good support capability, hence the North Coast of Batang Region has been considered as a good candidate NPP site. Volcanology aspect in Batang Region is considered as one of the most safety aspect. The farthest distance of Jembangan’s volcano product distribution is 33.24 km and it was not reach the north coast. Elevations of some places in Batang north coasts are > 5m that mean are free from flooding hazard potential. The interest areas to be developed as an alternative NPP location cover coast of Batang’s district (> 500 ha) and coast of Subah-Gringsing’s district (> 3500 ha).Keyword: site, NPP, safety, Batang Regency
HARGA DAN TARIF LISTRIK PLTN DI DUNIA Mochamad Nasrullah; Sriyana Sriyana
Jurnal Pengembangan Energi Nuklir Vol 12, No 1 (2010): Juni 2010
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2010.12.1.1444

Abstract

ABSTRAKHARGA DAN TARIF LISTRIK PLTN DI DUNIA. Pembangunan PLTN masih menjadi isu kontroversi. Kalangan industri nuklir dan pihak-pihak yang pro nuklir berusaha menyajikan perhitungan biaya listrik PLTN yang optimistik. Sementara kalangan industri pembangkitan dan pihak-pihak yang anti nuklir menyajikan perhitungan biaya listrik PLTN pesimistik. Untuk itu penelitian biaya pembangkit listrik berbahan bakar nuklir perlu disajikan secara ilmiah apa adanya agar kontroversi dapat dikurangi. Penelitian menggunakan data capital cost untuk EPC (Engineering Procorument Construction) PLTN berasal dari benua Asia, Amerika dan Eropa, biaya operasional dan perawatan menggunakan data pengalaman PLN, dan biaya bahan bakar nuklir menggunakan data tahun 2008 dengan skenario harga tertinggi, terendah dan rata-rata. Metodologi yang digunakan adalah membandingkan biaya pembangkit listrik dengan menggunakan program LEGECOST yang dikeluarkan oleh IAEA (International Atomic Energy Agency), sedangkan perhitungan harga tarif listrik menggunakan program yang dibuat oleh PLN Litbang. Dengan menggunakan discount rate 10%, hasil perhitungan menunjukkan bahwa harga keekonomian PLTN termurah kurang dari 3,7 cents US$/kWh (China) dan harga tarif listrik termurah rata-rata 5,5 cents US$/kWh (Korea Selatan). Sedangkan di negara-negara Eropa, sedikit lebih mahal dari harga tarif listrik PLTN di Asia. Biaya pembangkitan dan harga tarif listrik PLTN di Amerika Serikat kurang kompetitif karena biaya investasinya relatif mahal. Perbedaan biaya pembangkitan dan harga tarif listrik di masing-masing negara disebabkan perbedaan gaji dan upah tenaga kerja, pengaruh kenaikan bahan material, struktur spesifikasi konstruksi yang dibuat, peraturan yang terkait dengan PLTN dan masalah lingkungan.Kata kunci: biaya pembangkitan listrik, harga tarif listrik, PLTN ABSTRACTNPP ELECTRICAL PRICE AND TARIFF IN THE WORLD. Construction of a Nuclear Power Plant (NPP) is always become a controversial issue. Nuclear utility and other party which support the NPP present a calculation of NPP electricity cost too optimistic. However for utility and other party that contra to nuclear present a calculation of NPP electricity cost too pessimistic. This study present to reduce the controversy of nuclear cost. In this study, capital cost (Engineering Procurement Construction, EPC) was taken from Asian, America and Europe, operating and maintenance cost uses experience data of PLN, and nuclear fuel cost uses data year of 2008 with high price, low price and average price scenario. The methodological tools used to compare electricity generation cost was LEGECOST, a program developed by IAEA (International Atomic Energy Agency), while for electricity tarif- price calculation using a program developed by PLN research and development centert. With the discount rate 10%, the resulst shows that the cheapest electricity generation cost of NPP is less than 40 mills/kWh, and average electricity tariff was 55 mills/kWh. In the Europe countries the electricity tariff more expensive than NPP in Asia. However generating cost and electricity tariff of NPP in United Stated of America (USA) less competitive because investment cost more expensive. Generating cost and electricity tariff was different at each country depend on salary, labor wage, materials price, construction specification, regulation related to NPP and environment aspect.Keyword: electricity generating cost, electricity tariff, Nuclear Power Plant
SUMBER POTENSIAL BAHAYA EKSTERNAL AKIBAT KEGIATAN MANUSIA PADA SURVEI TAPAK PLTN June Mellawati; Yarianto Sugeng Budi Susilo; Hadi Suntoko
Jurnal Pengembangan Energi Nuklir Vol 12, No 1 (2010): Juni 2010
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2010.12.1.1445

Abstract

ABSTRAKSUMBER POTENSIAL BAHAYA EKSTERNAL AKIBAT KEGIATAN MANUSIA PADA SURVEI TAPAK PLTN. Dalam Safety Series No. 50-SG-S9 IAEA Guides diterangkan bahwa ”kejadian akibat kegiatan manusia” merupakan salah satu aspek penting dalam analisis regional pada kegiatan survei tapak PLTN. IAEA menerbitkan Safety Guide No. NS-G-3.1 tentang pedoman evaluasi tapak PLTN terkait potensi bahayanya. Tujuannya adalah untuk mengidentifikasi berbagai jenis kegiatan manusia yang menimbulkan kejadian eksternal dan kriteria Screening Distance Value (SDV) pada kegiatan survei dan evaluasi tapak PLTN. Pada kajian ini dibahas beberapa kegiatan yang menurut IAEA mempunyai potensi menimbulkan tumbukan, ledakan, lepasnya bahan beracun/toksik, awan racun dan kebakaran yang dapat mengancam keselamatan PLTN. Metode yang digunakan adalah kajian pustaka termasuk pengalaman terbaik dari beberapa negara yang mengoperasikan PLTN. Hasil menunjukkan bahwa keberadaan bandara, pelabuhan, instalasi militer, industri kimia dan kilang minyak merupakan kegiatan manusia yang perlu diperhatikan karena dapat menjadi pemicu kejadian eksternal dan mengancam keselamatan PLTN.Kata kunci: bahaya eksternal, tapak PLTN, SDV ABSTRACTPOTENCIAL SOURCES OF EXTERNAL HAZARDS BY HUMAN INDUCED EVENTS ON NPP SITE SURVEY. In Safety Series No.50-SG-S9 IAEA Guides described that man induced events is one of the important aspect on regional analysis of NPP site survey activities. Referring to he potential hazard, IAEA have published a guidance of Safety Guide IAEA NS-G-31 of External Human Induced Events. The objective of the assessment is to identify external man induced events and determine Screening Distance Value (SDV) criteria related to site survey and site evaluation activity. In this assessment, some human activities that have potential to generate missile impact, blasting, toxic material release, toxic cloud and firethat threat of NPP safety will be discussed. The method applied in the study is literature study including best practice of several countries that have been operating NPP. The results howed that airport and harbor existing, military installation, chemical industry and oil refinery are human activity that need attention because that can initiate the external events and threat NPP safety.Keywords: external hazard, NPP site, SDV
Hal Belakang JPEN 2008 Volume 10 Nomor 2 Desember Hal Belakang
Jurnal Pengembangan Energi Nuklir Vol 12, No 1 (2010): Juni 2010
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2010.12.1.3442

Abstract

Hal Belakang JPEN 2010 Volume 12 Nomor 1 Juni Hal Belakang
Jurnal Pengembangan Energi Nuklir Vol 12, No 1 (2010): Juni 2010
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2010.12.1.3428

Abstract

PEMBUATAN PETA DIGITAL TOPOGRAFI PULAU PANJANG, BANTEN, MENGGUNAKAN ArcGIS 9.2 dan SURFER 8 Ari Nugroho; Yarianto Sugeng Budi Susilo
Jurnal Pengembangan Energi Nuklir Vol 12, No 1 (2010): Juni 2010
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2010.12.1.1446

Abstract

ABSTRAKPEMBUATAN PETA DIGITAL TOPOGRAFI PULAU PANJANG, BANTEN, MENGGUNAKAN ArcGIS 9.2 DAN SURFER 8. Dalam mendukung kegiatan pengkajian kelayakan tapak Pembangkit Listrik Tenaga Nuklir (PLTN), telah dilakukan pembuatan peta topografi berbasiskan Sistem Informasi Geografis (SIG). Pembuatan peta ini merupakan penyusunan dan pengolahan data primer spasial hasil kegiatan survei topografi Pulau Panjang pada bulan Februari 2009. Alat yang digunakan adalah seperangkat personal computer yang dilengkapi dengan perangkat lunak ArcGIS versi 9.2 dari Environmental System Research Institute (ESRI) dan Surfer versi 8. ArcGIS 9.2 digunakan untuk mengolah dan menyusun data hasil dari pengukuran extra-terestrial dengan alat Global Positioning System (GPS) dan metode Real Time Kinematic (RTK), sedangkan Surfer versi 8 digunakan untuk pembentukan kontur hasil pengukuran terestrial data elevasi orthometrik. Hasil yang diperoleh adalah peta topografi Pulau Panjang dalam bentuk digital yang terintegrasi, mudah dicopy, informatif, dan editable.Kata kunci : Sistem Informasi Geografis, ESRI, Surfer 8 ABSTRACTDIGITIZING TOPOGRAPHYA MAP OF PULAU PANJANG BANTEN, USING ArcGIS 9.2 AND SURFER 8. In supporting the site safety and feasibility assessment of the Nuclear Power Plant (NPP), has been created the topographical map based on Geographic Information System (GIS). This map was created from the primary spatial data compilation resulting from the topographical survey of Pulo Panjang Island in February 2009. A personal computer installed with ArcGIS version 9.2 from Environmental System Research Institute (ESRI) and Surfer version 8 was used to support the activity. ArcGIS 9.2 was used to compile and process an extra-terestrial spatial data from Global Positioning System (GPS) Real Time Kinematic (RTK) while surfer 8 was used to create a contour from orthometric elevation data. The result of this activity is a topographical map of Pulo Panjang in digital data which integrated, duplicable, informative, and editable.Keywords: Geographic Information System, ESRI, Surfer 8

Page 1 of 1 | Total Record : 10


Filter by Year

2010 2010


Filter By Issues
All Issue Vol 23, No 2 (2021): Desember 2021 Vol 23, No 1 (2021): Juni 2021 Vol 22, No 2 (2020): Desember 2020 Vol 22, No 1 (2020): Juni 2020 Vol 21, No 2 (2019): Desember 2019 Vol 21, No 1 (2019): Juni 2019 Vol 20, No 2 (2018): Desember 2018 Vol 20, No 1 (2018): Juni 2018 Vol 19, No 2 (2017): Desember 2017 Vol 19, No 1 (2017): Juni 2017 Vol 18, No 2 (2016): Desember 2016 Vol 18, No 1 (2016): Juni 2016 Vol 17, No 2 (2015): Desember 2015 Vol 17, No 1 (2015): Juni 2015 Vol 16, No 2 (2014): Desember 2014 Vol 16, No 1 (2014): Juni 2014 Vol 15, No 2 (2013): Desember 2013 Vol 15, No 1 (2013): Juni 2013 Vol 14, No 2 (2012): Desember 2012 Vol 14, No 1 (2012): Juni 2012 Vol 13, No 2 (2011): Desember 2011 Vol 13, No 1 (2011): Juni 2011 Vol 12, No 2 (2010): Desember 2010 Vol 12, No 1 (2010): Juni 2010 Vol 11, No 2 (2009): Desember 2009 Vol 11, No 1 (2009): Juni 2009 Vol 10, No 2 (2008): Desember 2008 Vol 10, No 1 (2008): Juni 2008 Vol 9, No 2 (2007): Desember 2007 Vol 9, No 1 (2007): Juni 2007 Vol 8, No 2 (2006): Desember 2006 Vol 8, No 1 (2006): Juni 2006 Vol 7, No 2 (2005): Desember 2005 Vol 7, No 1 (2005): Juni 2005 Vol 6, No 2 (2004): Desember 2004 Vol 6, No 1 (2004): Juni 2004 Vol 5, No 2 (2003): Desember 2003 Vol 5, No 1 (2003): Juni 2003 Vol 4, No 2 (2002): Desember 2002 Vol 4, No 1 (2002): Juni 2002 Vol 3, No 2 (2001): Desember 2001 Vol 2, No 4 (2000): Desember 2000 Vol 2, No 3 (2000): September 2000 Vol 2, No 2 (2000): Juni 2000 Vol 2, No 1 (2000): Maret 2000 Vol 1, No 4 (1999): Desember 1999 Vol 1, No 3 (1999): September 1999 Vol 1, No 1 (1999): Maret 1999 More Issue