ANALISIS PENGARUH TINGKAT KOMPONEN DALAM NEGERI TERHADAP KEEKONOMIAN PLTN Sriyana Sriyana; Sahala Maruli Lumbanraja; Priyanto Mudo Joyosukarto; Imam Bastori; Yuliastuti Yuliastuti; Bambang Suprawoto; Refrison Refrison
Jurnal Pengembangan Energi Nuklir Vol 12, No 2 (2010): Desember 2010
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2010.12.2.1455

Abstract

ABSTRAKANALISIS PENGARUH TINGKAT KOMPONEN DALAM NEGERI TERHADAP KEEKONOMIAN PLTN. Telah dilakukan studi pengaruh tingkat komponen dalam negeri terhadap keenomian PLTN. Lingkup penelitian ini meliputi telaah teknologi sistem PLTN (Optimized Power Reactor, OPR-1000), kemampuan industri nasional untuk berpartisipasi dalam pembangunan PLTN dan analisis pengaruh keekonomiannya. Analisis ekonomi dilakukan untuk pembangunan 2 unit PLTN OPR-1000. Dari hasil studi dapat disimpulkan bahwa: (1) TKDN untuk pembangunan PLTN Indonesia yang pertama adalah sebesar 35,24% untuk kasus pesimis dan 43,86% untuk kasus optimis. (2) Pemenuhan angka TKDN tersebut perlu didukung pemerintah berupa kebijakan industri, terutama yang terkait dengan proses alih teknologi. (3) Besarnya biaya pembangkitan yang dapat dihemat per tahun pada penerapan TKDN pesimis berkisar antara US$ 14,55 juta - US$ 14,57 juta dan pada TKDN optimis berkisar antara US$ 22,23 juta - US$ 22,26 juta. (4) Penerapan TKDN memberikan dampak penurunan biaya pembangkitan listrik berkisar antara 1,75% - 1,76% untuk kasus pesimis dan 2,67% - 2,68% untuk kasus optimis.Kata kunci: komponen dalam negeri, keekonomian, PLTN, alih teknologi ABSTRACTANALYSIS ON THE EFFECT OF LOCAL CONTENT TO THE ECONOMIC ASPECT OF NPP. Study analysis on the effect of local content to the economic aspect of NPP has already been conducted. This scope of study covers: NPP technology system analysis (OPR-1000), national industry capability to participate in NPP construction and effect analysis toward the economic. Economic analysis is conducted for 2 units NPP OPR-1000. This study concludes that: (1) The level of local content for the first 2 units NPP in Indonesia about 35,34% (pessimistic case) and 43,38% (optimistic case). (2) To reach the local content government support is needed, i.e. policy of industry, particularly the police related to technology transfer. (3) The total generation cost that could be saved per year in pessimistic case is around US$ 14.55 million - US$ 14.57 million and in optimistic case it is around US$ 22.23 million – US$ 22.26 million. (4) The local content implementation will provide decreasing of generation cost about 1.75% up to 1.76% in pessimistic case, and around 2.67% up to 2.68% in optimistic case.Keywords: local content, economic, NPP, technology transfer
STUDI POTENSI INDUSTRI JASA KONSTRUKSI UNTUK MENDUKUNG PEMBANGUNAN PEMBANGKIT LISTRIK TENAGA NUKLIR PERTAMA DI INDONESIA Dharu Dewi; Sriyana Sriyana
Jurnal Pengembangan Energi Nuklir Vol 10, No 1 (2008): Juni 2008
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2008.10.1.1414

Abstract

ABSTRAKSTUDI POTENSI INDUSTRI JASA KONSTRUKSI UNTUK MENDUKUNG PEMBANGUNAN PEMBANGKIT LISTRIK TENAGA NUKLIR PERTAMA DI INDONESIA. Studi dilakukan untuk mengidentifikasi potensi industri jasa konstruksi yang mampu berpartisipasi dalam pembangunan PLTN di Indonesia. Potensi Industri jasa konstruksi, diidentifikasi melalui evaluasi potensi beberapa industri jasa konstruksi multinasional. Metode penelitian dilakukan dengan cara survei yakni kuesioner, kunjungan teknis dan penelusuran studi literatur. Teknik pengumpulan data dilakukan dengan cara “purpossive sampling”. Data diperoleh dari data primer dan data sekunder. Hasil studi menunjukkan bahwa potensi industri jasa konstruksi untuk mendukung program PLTN masih harus ditingkatkan kinerjanya melalui pemilihan SDM yang kompeten, peralatan yang handal, sistem manajemen proyek yang efektif dan efisien, sehingga diharapkan mampu berpartisipasi aktif dalam proyek konstruksi PLTN di Indonesia. Manfaat dari hasil penelitian ini diharapkan dapat menjadi bahan masukan berharga bagi industri jasa konstruksi untuk dapat berperan aktif dalam proyek konstruksi PLTN di Indonesia.Kata kunci: industri konstruksi, PLTNABSTRACTA STUDY OF THE POTENCY OF CONSTRUCTION SERVICE INDUSTRIES TO SUPPORT THE FIRST NUCLEAR POWER PLANT CONSTRUCTION IN INDONESIA. The study was conducted to identify the potency of construction service industries to participate in nuclear power plant program in Indonesia. The potency is identified by evaluation results of national industries potency in some multinational construction service industries. The research methodology chosen was the survey method by sending questionaires, visits to National industries, interview, and literature study. The data collection technique was sampling purpossive. Data can be obtained from both primary and secondary data. The study results showed that the performance of construction service industries to support the NPP program must be increased through the selection of competent human resources, reliable equipments and an effective and efficient project management system, so that they can be expected to play necessary role in the nuclear power plant construction in Indonesia.Keywords: construction industries, nuclear power plants
KOMPARASI ASPEK EKONOMI TEKNIK SC (STEEL PLATE REINFORCED CONCRETE) DAN RC (REINFORCED CONCRETE) PADA KONSTRUKSI DINDING PENGUNGKUNG REAKTOR Yuliastuti Yuliastuti; Sriyana Sriyana
Jurnal Pengembangan Energi Nuklir Vol 10, No 1 (2008): Juni 2008
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2008.10.1.1419

Abstract

ABSTRAKKOMPARASI ASPEK EKONOMI TEKNIK SC (STEEL PLATE REINFORCED CONCRETE) DAN RC (REINFORCED CONCRETE) PADA KONSTRUKSI DINDING PENGUNGKUNG REAKTOR. Biaya konstruksi pembangkit listrik tenaga nuklir (PLTN) dapat membengkak bila terjadi penundaan waktu konstruksi, penundaan perijinan, desain ulang untuk memenuhi persyaratan, dan kesulitan pada manajemen konstruksi, yang bermuara pada waktu konstruksi yang lebih panjang. Berdasarkan studi yang dilakukan oleh Departemen Energi Amerika Serikat pada tahun 2004, terdapat 13 teknologi konstruksi maju yang memiliki potensi untuk mengurangi waktu konstruksi PLTN. Salah satu teknologi konstruksi tersebut adalah teknik beton bertulang dengan kerangka baja (steel-plate reinforced concrete, SC) yang diterapkan pada konstruksi dinding pengungkung reaktor. Dibanding teknik beton bertulang konvensional (conventional reinforced concrete, RC) yang dibangun di lokasi dan memerlukan waktu yang lebih lama untuk membongkar rangka-tuangan (formwork), teknik SC menawarkan cara yang lebih efisien untuk melakukan pengecoran beton menggunakan rangka-tuang permanen yang terbuat dari baja. Tujuan dari studi ini adalah menghitung waktu dan membandingkan konstruksi dan biaya ekonomi antara teknik RC dan teknik SC. Hasil studi menunjukkan bahwa teknik SC dapat mengurangi waktu konstruksi sekitar 60% dan menurunkan biaya konstruksi sebesar 29,7% dibanding teknik RC.Kata kunci: teknik beton bertulang dengan kerangka baja, pengungkung reaktor, teknologi konstruksi maju. ABSTRACTECONOMIC ASPECT COMPARISON BETWEEN STEEL PLATE REINFORCED CONCRETE AND REINFORCED CONCRETE TECHNIQUE IN REACTOR CONTAINMENT WALL CONSTRUCTION. Construction costs of nuclear power plant were high due to the construction delays, regulatory delays, redesign requirement, and difficulties in construction management. Based on US DOE (United States Department of Energy) study in 2004, there were thirteen advanced construction technologies which were potential to reduce the construction time of nuclear power plant. Among these technologies was the application of steel-plate reinforced concrete (SC) on reactor containment construction. The conventional reinforced concrete (RC) technique were built in place and require more time to remove formwork since the external form is temporary. Meanwhile, the SC technique offered a more efficient way to placing concrete by using a permanent external form made of steel. The objective of this study was to calculate construction duration and economic comparison between RC and SC technique. The result of this study showed that SC technique could reduce the construction time by 60% and 29,7% cost reduced compare to the RC technique.Keywords: steel-plate reinforced concrete, reactor containment, advanced construction technologies.
STUDI UNJUK KERJA SISTEM PROTEKSI PADA PEMBANGKIT LISTRIK TENAGA NUKLIR TIPE APR 1400 Nafi Feridian; Sriyana Sriyana
Jurnal Pengembangan Energi Nuklir Vol 10, No 2 (2008): Desember 2008
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2008.10.2.1424

Abstract

ABSTRAKSTUDI UNJUK KERJA SISTEM PROTEKSI PADA PEMBANGKIT LISTRIK TENAGA NUKLIR TIPE APR 1400. Telah dilakukan studi sistem proteksi pembangkit (PPS) pada Pembangkit Listrik Tenaga Nuklir (PLTN) tipe Advanced Power Reactor (APR) 1400 yang merupakan salah satu sistem yang menjaga agar operasi PLTN APR 1400 tetap aman dan terkendali. Aspek pengendalian operasi PLTN merupakan aspek yang penting dalam menjamin beroperasinya PLTN dengan aman dan selamat. Untuk itu lingkup studi ini dibatasi pada unjuk kerja sistem PPS. Tujuan dilakukannya studi ini adalah untuk mengetahui kinerja PPS pada PLTN. Metodologi yang digunakan pada studi ini adalah studi literatur, pengumpulan data, serta melakukan review dan analisis. Studi ini menyimpulkan bahwa ada beberapa parameter pengukuran yang memicu sistem PPS untuk melakukan trip (pemadaman) reaktor, yaitu antara lain: tekanan pada komponen pressurizer terlalu tinggi atau terlalu rendah, volume air pada komponen pembangkit uap terlalu tinggi atau terlalu rendah, tekanan pada pengungkung reaktor terlalu tinggi, aliran pendingin reaktor yang rendah. Namun begitu trip juga bisa dilakukan secara manual. Beberapa parameter tersebut diukur oleh beberapa sensor yang disusun secara paralel dan ditetapkan dengan nilai nominal tertentu sesuai dengan standar PLTN tipe APR 1400.Kata kunci: Sistem Proteksi Pembangkit, APR 1400, sensor, penggerak batang kendali ABSTRACTNUCLEAR POWER PROTECTION SYSTEMS PERFORMANCE STUDY FOR APR 1400. A study on plant protection system (PPS) of advanced power reactor (APR) 1400 which is one of the system to maintain nuclear power plant (NPP) operation safe and controllable has been conducted. The controllability aspect of NPP operation is an important aspect to assure the NPP operation safe and reliable. Accordingly, the study is limited in the performance of PPS. The method used in the study includes literature study, data collection, as well as review and analysis. The purpose of this study is to recognize that PPS performance can assure the NPP operation safely and controllable. The study concludes that there are several measurement parameters that actuate PPS systems to trip the reactor such as high pressurizer pressure, low pressurizer pressure, high containment building pressure and also manual trip. These parameters are measured by parallel sensor with parallel arrangement set on set point suitable with APR 1400 safety standard.Keywords: Plant Protection System (PPS), APR 1400, sensor, control element drive mechanism
PERAN MOX SEBAGAI BAHAN BAKAR NUKLIR DI MASA DEPAN Sriyana Sriyana; Suparman Suparman
Jurnal Pengembangan Energi Nuklir Vol 1, No 3 (1999): September 1999
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.1999.1.3.2003

Abstract

ABSTRAK PERAN MOX SEBAGAI BAHAN BAKAR NUKLIR DI MASA DEPAN. Berdasarkan studi estimasi pasokan bahan bakar nuklir, diperkirakan bahwa mulai tahun 2000 akan terjadi kesenjangan antara produksi dan permintaan uranium di dunia. Kekurangan ini akan berpengaruh terhadap pasokan bahan bakar nuklir untuk PLTN dan terhadap harga bahan bakar nuklir. Hal ini akan memberi peluang pada bahan-bakar MOX (Mixed OXide) untuk lebih banyak berperan. Kecenderungan ini terlihat dengan kenaikan pemanfaatan bahan bakar MOX sebagai substitusi bahan bakar uranium untuk reaktor air ringan (Light Water Reactor, LWR).   ABSTRACT THE ROLE OF MOX FOR NUCLEAR FUEL IN THE FUTURE. Based on nuclear fuel supply estimation study, it's predicted that starting in the year 2000 there will be a worldwide lack of uranium supply. The lack of supply will influence the nuclear fuel supply for Nuclear Power Plants and nuclear fuel costs. This will give opportunity to Mixed Oxide (MOX) fuel to have more important role. The trend is seen by the increasing usage of MOX as the substitute nuclear fuel in the Light Water Reactor (LWR).
STRATEGI ALIH TEKNOLOGI PLTN : BELAJAR DARI PENGALAMAN KOREA Sriyana Sriyana; Nurlaila Nurlaila
Jurnal Pengembangan Energi Nuklir Vol 5, No 2 (2003): Desember 2003
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2003.5.2.1924

Abstract

ABSTRAK STRATEGI ALIH TEKNOLOGI PLTN : BELAJAR DARI PENGALAMAN KOREA. Teknologi adalah salah satu elemen sosial ekonomi yang memainkan peranan penting dalam proses modemisasi. Ketika gagasan modernitas mengalir ke masyarakat, teknologi menjadi prasyarat fundamental demi terwujudnya sistem sosial ekonomi yang modem di masyarakat tersebut. Oleh karena itu, berbagai upaya modemisasi masyarakat mengikutsertakan program alih teknologi dalam agenda utamanya. Tujuan studi ini adalah memilih proses alih teknologi yang baik dan sesuai untuk dapat meraih kemampuan teknologi PLTN secara mandiri. Studi proses alih teknologi ini dilakukan dengan penelusuran literatur yang ada, yakni belajar dari pengalaman Korea yang telah berhasii mengembangkan teknologi pembangkit listrik tenaga nuklir dengan kemampuan sendiri. Sedangkan lingkup penelitian ini adalah mendiskripsikan proses alih teknologi yang baik dan sesuai untuk dapat meraih kemampuan teknologi PLTN secara mandiri. Studi ini menyimpulkan bahwa program alih teknologi harus dimulai sejak masa persiapan pembangunan PLTN, masa Pra-pembangunan PLTN, masa Pembangunan PLTN maupun pada masa pengoperasian PLTN. Untuk meraih kemampuan teknologi PLTN yang mandiri periu dilakukan program jangka panjang dan perlu dibangun unit-unit PLTN yang cukup untuk sebuah alih teknologi. Peran dan komitmen pemerintah juga harus kuat untuk mendorong terjadinya alih teknologi. Institusi-institusi yang terlibat harus jelas dan bertanggung jawab sesuai kompetensinya masing-masing. Industri nasional sebagai eksekutor alih teknologi perlu diberikan peluang yang lebih besar dalam proses alih teknologi ini.   ABSTRACT STRATEGY OF NUCLEAR POWER TECHNOLOGY: LEARN FROM KOREA EXPERIENCE. Technology is one of the economic and social elements which play an important role in modernization process. When modernity ideas come into society, technology will become fundamental prerequisite for the shake of its form of modem economic social system of the society. Therefore, various effort modernize society involve program of transfer technology in main agenda. Purpose of this study is to choose a process of technology transfer and according to be able to reach for technological ability of nuclear power self-reliance. This research is conducted by study of existing literature, namely learn from experience of Korea which have succeeded to develop nuclear energy technology with self-reliance. While this research scope is to describe the process of technology transfer and according to be able to reach for technological ability of nuclear energy self-reliance. This study conclude that program of technology transfer have to start since nuclear power development pre-project period, project construction of NPP period and also in operation period. To reach for technological ability of self-reliance require to be done by long-term program and require to be build by several units which last for a transfer of technology. Government Commitment to have important role also have to be strong to push the happening of technology transfer. Institutions in concerned should have to be clear and hold responsible according to its interest. National industries as executor of technology transfer require to be given by larger ones opportunity in course of transfer this technology.
DAMPAK PEMBANGUNAN PLTN-DESALINASI TERHADAP EKONOMI NASIONAL DAN JAWA TIMUR Ratya Anindita; Sriyana Sriyana; Mochamad Nasrullah
Jurnal Pengembangan Energi Nuklir Vol 8, No 1 (2006): Juni 2006
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2006.8.1.1964

Abstract

ABSTRAK DAMPAK PEMBANGUNAN PLTN - DESALINASI TERHADAP EKONOMI NASIONAL DAN JAWA TIMUR. Tujuan dari studi ini adalah menentukan dampak ekonomi dari dibangunnya PLTN - Desalinasi 2 x 100 Mwe tipe SMART yang dikopel dengan instalasi desalinasi sebesar 4 x 10.000 m3/hari. Studi ini dimulai dari pra-pembangunan sampai dengan selesainya pembangunan PLTN - Desalinasi tersebut. Waktu cakupan studi ini adalah 2008 hingga 2017, dan pembangunan dilakukan di Pulau Madura, Jawa Timur. Perkiraan tabel l-O tahun 2008 sampai dengan tahun 2017 telah dibuat dengan proyeksi l-O dinamis. Dampak ekonomi diestimasi dengan multiplier efek (efek pengganda) yang rrieliputi dampak langsung maupun dampak tak langsung, demikian juga yang menyebabkan dampak (induced effect). Belanja pengeluaran dari proyek pembangunan PLTN - Desalinasi SMART ke kontraktor domestik diperkirakan berjumlah sekitar US$ 88,2 juta atau sekitar 25,6% dari semua belanja pengeluaran. Dampak total dari proyek tersebut terhadap ekonomi nasional sebesar Rp. 6.329.347 juta, Rp. 8.439.130 juta dan Rp. 12.658.695 juta untuk masing-masing skenario nilai US dollar terhadap rupiah sebesar Rp. 7.500/US$, Rp. 10.000/US$, dan Rp. 15.000/US$, masing-masing mewakili skenario pertumbuhan dinamis. Dampak langsung kumulatif selama pra-konstruksi sampai periode konstruksi telah dihitung sebesar US$ 101,8 juta, sektor nomor48 (perlengkapan listrik), 52 (bangunan) dan 62 (jasa perusahaan). Hal ini akan memberikan dampak yang cukup banyak secara nasional maupun regional Jawa Timur untuk sektor-sektor lain.   ABSTRACT IMPACT OF NUCLEAR POWER AND DESALINATION PLANT CONSTRUCTION TOWARD NATIONAL AND EAST JAWA ECONOMIC. The objective of this study is to determine the economic impacts of the construction of the nuclear power plant 2 x 100 MW(e) SMART type with desalination 4 x 10.000 m3 which would conduct in years.2008 to 2017 in Madura Island, East Java. The predicted IO tables of 2008-2017 have been created by the application of dynamic IO projection. The economic impact was estimated through multiplier effect which covers direct impact and indirect impact as well as the induced effect. The expenditures of SMART nuclear power and desalination plant to the domestic contractors is estimated to amount to 88.2 million US$ or 25.6 % of the whole expenditures. The total impact of the project to the national economy would be Rp. 6.329.347 million, Rp.8.439.130 million, and Rp. 12.658.695 million for each scenario of the exchange rate as high as Rp.7500/US$,Rp.10000/US$,Rp.15000/US$, respectively for the scenario of dynamic growth. The total impact of the project to the provincial economy of East Java would be as much as Rp. 3.253.498 million, Rp. 4.337.997 million, and Rp. 6.506.995 million for each scenario of the exchange rate as high as Rp.7500/US$, Rp.10000/US$, Rp.15000/US$, respectively under the former scenario. Cumulative direct impact since pre-construction to construction period had been calculated as much as US$ 101,8 million for sectors number 48, 52, and 62. This have brought much impact on other sectors in national or provincial levels of economy. Keywords: Economic impact, nuclear power plant construction, input-output.
FAKTOR KAPASITAS PEMBANGKIT LISTRIK TENAGA NUKLIR: SEBUAH PENILAIAN TERHADAP KONTRAKTOR PEMBANGUNNYA Sriyana Sriyana
Jurnal Pengembangan Energi Nuklir Vol 4, No 1 (2002): Juni 2002
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2002.4.1.2040

Abstract

ABSTRAK FAKTOR KAPASITAS PEMBANGKIT LISTRIK TENAGA NUKLIR: SEBUAH PENILAIAN TERHADAP KONTRAKTOR PEMBANGUNNYA. Pengkajian dan pengevaluasian suatu sistem pembangkit tenaga listrik memegang peranan yang sangat penting baik dalam pengoperasian sistem yang sudah terpasang maupun dalam perencanaan sistem pada masa datang, yang kesemuanya itu ditujukan untuk dapat menyediakan energi listrik kepada pelanggan secara berkesinambungan, berkualitas, serta berdaya saing ekonomi yang tinggi. Permasalahan utama yang biasa dihadapi oleh pembeli instalasi pembangkit listrik adalah bagaimana bisa memilih pembangkit yang berunjuk kerja baik sehingga dari aspek ekonomi, pemilik pembangkit tidak dirugikan oleh karena salah dalam memilih, yakni karena buruknya unjuk kerja dari pembangkit yang dibangun. Unjuk kerja dari suatu pembangkit listrik dapat diukur dengan parameter teknis tertentu. Salah satu parameter yang dapat menunjukkan ukuran unjuk kerja pembangkit adalah faktor kapasitas. Tulisan ini menyajikan bagaimana unjuk kerja kontraktor pembangun pembangkit listrik ditinjau dari faktor kapasitas pembangkitnya. Jenis PLTN yang dipelajari dibatasi, yakni hanya untuk jenis PWR {Pressurized Water Reactor, reaktor air ringan bertekanan) dan PHWR {Pressurized Heavy Water Reactor, reaktor air berat bertekanan). Metodologi yang digunakan dalam studi ini adalah studi literatur. Studi ini melibatkan 231 unit reaktor pembangkit listrik dengan jenis PWR dan PHWR. Jumlah reaktor ini telah mengakumulasi umur operasi sebesar 3.498 reaktor tahun dan dibangun oleh 10 kontraktor besar. Dari hasil studi ini dapat disebutkan bahwa untuk klasifikasi daya 400 - 800 MWe KWU merupakan kontraktor yang memiliki unjuk kerja PLTN paling baik, yakni sebesar 79,97%, disusul oleh SKODA (79,70%), AEE (76,56%), MHI (74,08%), AECL (71,79%), Westinghouse (71,64%), CE (71,37%) dan DAE (48,54%). Untuk klasifikasi daya 801 - 1000 MWe MHI merupakan kontraktor yang memiliki unjuk kerja PLTN paling baik, yakni sebesar 83,42%, disusul oleh KWU (79.41%), Westinghouse (73,74%), AECL (71,87%), Framatome (71,03%), CE (67,80%), B&W (67,77%) dan AEE (42,81%), sedangkan untuk klasifikasi daya lebih besar dari 1000 MWe MHI merupakan kontraktor yang memiliki unjuk kerja PLTN paling baik, yakni sebesar 82,17%, disusul oleh KWU (79,72%), CE (74,85%), Westinghouse (67,93%), dan Framatome (66,47%). ABSTRACT CAPACITY FACTOR OF NUCLEAR POWER PLANT: AN EVALUATION OF THE CONTRACTOR. Assessment and evaluation of a power plant play an important role in either when the plants have been operating or in the electrical system planning. This all should be directed to fulfill the energy demand with better quality, sustainability and high economic competitiveness. The main problem that is usually faced by the utility is how to select the better performing plant in order to give more benefit. Performance of power plant could be measured by technical parameter, such as capacity factor. This paper describes how contractors are compared by means of the capacity factor of plants which they have constracted. The scope of this study are limited by the type of reactor, namely PWR {Pressurized Water Reactor) and PHWR {Pressurized Heavy Water Reactor). Literature study is used. The study covers 231 units which has accumulated 3,498 reactor years of nuclear power plant operation and also covers 10 main contractors in the world. The result are: for 400 - 800 MWe class. KWU is the best contractor with capacity factor of 79.97%, and follow by SKODA (79.70%), AEE (76.56%), MHI (74.08%). AECL (71.79%), Westinghouse (71.64%), CE (71.37%) and DAE (48.54%). For 801 - 1000 MWe class, MHI is the best contractor with the capacity factor of 83.42%, and follow by KWU (79.41%), Westinghouse (73.74%), AECL (71.87%), Framatome (71.03%), CE (67.80%), B&W (67.77%) and AEE (42.81%). For more than 1000 MWe class, where there are only 5 contractors, MHI is again the best contactor with the capacity factor of 82.17%, and follow by KWU (79.72%), CE (74.85%), Westinghouse (67.93%), and Framatome (66.47%).
SIMPRO SUATU PROGRAM SISTEM NILAI PEROLEHAN Sriyana Sriyana; Adiwardojo Adiwardojo
Jurnal Pengembangan Energi Nuklir Vol 2, No 2 (2000): Juni 2000
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2000.2.2.2013

Abstract

ABSTRAK SIMPRO SUATU PROGRAM SISTEM NILAI PEROLEHAN. Telah dibuat program yang dapat dipergunakan oleh middle-top management ataupun pengelola proyek/kegiatan, untuk mengontrol proyek/kegiatannya agar berjalan seperti yang direncanakan. Program ini dinamai dengan SIMPRO Versi 1.0. Penekanan dari program ini adalah pada metode sistem nilai perolehan yang dapat digunakan untuk pengelolaan suatu proyek/kegiatan secara efektif dan efisien. Program ini dibuat dengan bahasa pemrograman Delphi 3.0 didukung oleh Personal Computer dengan microprosessor Intel Pentium 200, 32 MB RAM. Laporan yang disampaikan dari hasil penggunaan program ini hanya terdiri dari 2 (dua) lembar namun mencakup secara komprehensif dari status proyek/kegiatan yang dikontrol. Laporan lembar pertama berupa grafik dan lembar kedua berupa narasi dari status proyek/kegiatan yang dikontrol.   ABSTRACT SIMPRO AS A SOFTWARE FOR EARNED VALUE SYSTEM. A modul software has been made for middle-top management to control the project or activities. It means that the software can be used to control the project or activities and directed to the goal as planned. This software has named by SIMPRO Version 1.0 and stressed in earned value system method to manage projects or activities efficiently and effectively. This software has been made with Delphi 3.0, PC Intel Pentium 200, 32 MB RAM. information resulted is a graphic and also a description about projects or comprehensive activities status.
PERANAN INDUSTRI JASA KONSULTAN NASIONAL UNTUK MENDUKUNG PROGRAM PLTN PERTAMA DI INDONESIA Dharu Dewi; Sahala Maruli Lumbanraja; Sriyana Sriyana
Jurnal Pengembangan Energi Nuklir Vol 9, No 2 (2007): Desember 2007
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2007.9.2.1960

Abstract

ABSTRAK PERANAN INDUSTRI JASA KONSULTAN NASIONAL UNTUK MENDUKUNG PROGRAM PLTN PERTAMA DI INDONESIA. Telah dilakukan studi mengenai peranan industri jasa konsultan nasional untuk ikut terlibat di dalam program Pembangkit Listrik Tenaga Nuklir (PLTN) Pertama di Indonesia. Kegiatan program PLTN akan berhasil apabila dalam pelaksanaannya diawali dengan perencanaan yang baik. Untuk mendapatkan hasil yang optimal, peluang dan peran industri jasa konsultan nasional perlu dikembangkan sehingga porsi lokalisasi program PLTN menjadi lebih besar. Pemanfaatan jasa konsultan nasional diharapkan dapat menjadi second opinion yang sangat berperan penting di dalam mensosialisasikan program PLTN. Pemerintah maupun calon pemilik proyek (Owner) PLTN hendaknya menganalisis, merencanakan dan melaksanakan secara matang program kegiatan PLTN dengan melibatkan jasa konsuitan nasional mulai dari identifikasi konsultan nasional yang ada, mempertimbangkan proses pengadaan jasa konsultan nasional, merumuskan ruang lingkup kerja konsultan, mengadakan seleksi jasa konsultan nasional, mengevaluasi sampai dengan pemonitoran dan pengawasan sehingga diharapkan dengan penggunaan konsultan nasional akan diperoleh manfaat hasil proyek yang lebih efektif, efisien, ekonomis, tepat sasaran dan tepat mutu. Studi ini mengkaji bentuk dan jenis konsultan nasional, berbagai kajian paket pekerjaan yang dapat dilaksanakan oleh konsultan nasional, metode pemilihan konsultan nasional, tantangan/kendala konsultan nasional, serta peningkatan peranan konsultan nasional untuk ikut andil dalam mendukung program persiapan dan pembangunan PLTN di Indonesia. Adapun metode penelitian yang digunakan adalah dengan penelusuran studi literatur, konsultansi teknis dengan nara sumber dan penelusuran website/internet. Kata kunci: billing rate, jasa konsultansi, Pembangkit Listrik Tenaga Nuklir, tenaga ahli.   ABSTRACT THE ROLE OF NATIONAL CONSULTANT SERVICES INDUSTRIES TO SUPPORT THE FIRST NUCLEAR POWER PLANT PROGRAMME IN INDONESIA. A Study has been done which concerning the role of Indonesian National Consultant Services Industries to support the First Nuclear Power Plant (NPP) Programme in Indonesia. NPP Programme activities will be success if the studies should be started with good planning. To obtain the optimal results, the opportunity and the role of national consultants should be considered to the localization of NPP Programme to be bigger. Utilitizing of national consultants services can be expected to become second opinion which is to play important role in socialization of NPP Programme. The Government and NPP Project Owner’s candidate should analysis, plan and implement the Nuclear Power Plant Programme activities, started from identification of the available national consultants, considering the national consultants procurement process, definition of scope of works of national consultants activities, carryng out the selection of national consultants, evaluation, monitoring and supervision so that the utilizing of national consultants will give benefit more effective, efficient, economic, appropiate objectives and good quality. This study to assess the structure and type of national consultants, works package which can be done by national consultants, selection methods of national consultants, constraint of national consultants and enhancing of the role of national consultants to involve and support in the nuclear power plant programme in Indonesia. The research methods are literature study, consultation with resource person and exploring of website/internet. Keywords: billing rate, consultant services, expert, Nuclear Power Plant.