cover
Contact Name
Nur Hasanah
Contact Email
nur.hasanah@batan.go.id
Phone
+6221-5204243
Journal Mail Official
jpen@batan.go.id
Editorial Address
Kawasan Kantor Pusat Badan Tenaga Nuklir Nasional Jl. Kuningan Barat, Mampang Prapatan, Jakarta 12710 Kotak Pos 4390 Jakarta 12043
Location
Kota adm. jakarta selatan,
Dki jakarta
INDONESIA
Jurnal Pengembangan Energi Nuklir
ISSN : 14109816     EISSN : 25029479     DOI : https://doi.org/10.17146/jpen
Jurnal Pengembangan Energi Nuklir publishes scientific papers on the results of studies and research on nuclear energy development with the scope of energy and electricity planning, nuclear energy technology, energy economics, management of nuclear power plants, national industries that support nuclear power plants, aspects of the nuclear power plant site and environment, and topics others that support the development of nuclear energy.
Articles 4 Documents
Search results for , issue "Vol 2, No 2 (2000): Juni 2000" : 4 Documents clear
METEOROLOGICAL MONITORING, DISPERSION OF RADIOACTIVE EFFLUENT INTO THE ATMOSPHERE AND POPULATION RISK ANALYSIS Yarianto Sugeng Budi Susilo; Heni Susiati; Kurnia Anzhar
Jurnal Pengembangan Energi Nuklir Vol 2, No 2 (2000): Juni 2000
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2000.2.2.2016

Abstract

ABSTRAK PEMANTAUAN METEOROLOGI, DISPERSI EFLUEN RADIOAKTIF MELALUI ATMOSFER DAN ANALISIS RISIKO TERHADAP PENDUDUK. Meteorologi adalah salah satu faktor penting dalam tahapan pemilihan tapak fasilitas nuklir. Untuk memprediksi pola penyebaran radioaktif di udara dalam jangka panjang dan operasi normal dapat digunakan metode TIC (Time Integrated Concentration). Perhitungan dosis inhalasi 1-131 dapat digunakan model sederhana yang direkomendasikan Clark. Data yang digunakan dalam simulasi adalah data meteorologi sekunder hasil pemantauan Newjec dari bulan Agustus 1994 sampai dengan Juli 1995. Perhitungan dosis ekivalen efektif dilakukan dengan asumsi untuk PWR 900 dengan Q0=3.7.1011 Bq/tahun. Nilai TIC/Q tertinggi adalah 52.92 s2m-3 yang terjadi pada arah NNW dan radius 200 meter dari titik lepasan. Nilai TIC/Q mula-mula naik dan mencapai puncak pada jarak 200 meter kemudian turun secara asimptotis untuk semua sektor. Nilai tertinggi dosis ekivalen efektif terjadi pada sektor NNW jarak 200 m, yaitu 1.74e-03 mSv/tahun.   ABSTRACT METEOROLOGICAL MONITORING, DISPERSION OF RADIOACTIVE EFFLUENT INTO THE ATMOSPHERE AND POPULATION RISK ANALYSIS. Meteorology is one of the factors which shall be considered at survey stage for site selection of nuclear facility. Prediction of radionuclide concentration at atmosphere for long-term and normal release can be conducted by Time Integrated Concentration method. Calculation of inhalation dose of 1-131 can be applied by simple model that was recommended by Clark. The data needed for simulation are meteorology secondary data as a result of meteorological monitoring for one year duration started from August 1994 up to July 1995. Calculation of effective dose equivalent is established by assuming PWR 900 type with Qo=3.7.1011 Bq/year. The highest TIC/Q value of 52.92 s2m-3 occurred at NNW sector and 200 meter radius from release point. TIC/Q increases with radii for all sectors and reach its peak value at about 200-300 meter from release point. TIC/Q then go down and curves will reach some asymptotes.The highest of effective dose equivalent is happened at NNW sector 200 m distance of 1.74e-03 mSv/year.
SIMPRO SUATU PROGRAM SISTEM NILAI PEROLEHAN Sriyana Sriyana; Adiwardojo Adiwardojo
Jurnal Pengembangan Energi Nuklir Vol 2, No 2 (2000): Juni 2000
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2000.2.2.2013

Abstract

ABSTRAK SIMPRO SUATU PROGRAM SISTEM NILAI PEROLEHAN. Telah dibuat program yang dapat dipergunakan oleh middle-top management ataupun pengelola proyek/kegiatan, untuk mengontrol proyek/kegiatannya agar berjalan seperti yang direncanakan. Program ini dinamai dengan SIMPRO Versi 1.0. Penekanan dari program ini adalah pada metode sistem nilai perolehan yang dapat digunakan untuk pengelolaan suatu proyek/kegiatan secara efektif dan efisien. Program ini dibuat dengan bahasa pemrograman Delphi 3.0 didukung oleh Personal Computer dengan microprosessor Intel Pentium 200, 32 MB RAM. Laporan yang disampaikan dari hasil penggunaan program ini hanya terdiri dari 2 (dua) lembar namun mencakup secara komprehensif dari status proyek/kegiatan yang dikontrol. Laporan lembar pertama berupa grafik dan lembar kedua berupa narasi dari status proyek/kegiatan yang dikontrol.   ABSTRACT SIMPRO AS A SOFTWARE FOR EARNED VALUE SYSTEM. A modul software has been made for middle-top management to control the project or activities. It means that the software can be used to control the project or activities and directed to the goal as planned. This software has named by SIMPRO Version 1.0 and stressed in earned value system method to manage projects or activities efficiently and effectively. This software has been made with Delphi 3.0, PC Intel Pentium 200, 32 MB RAM. information resulted is a graphic and also a description about projects or comprehensive activities status.
ANALISIS KINERJA OPERASI PEMBANGKIT LISTRIK TENAGA NUKLIR TIPE LWR DI JEPANG Priyanto Mudo Joyosukarto; Nurlaila Nurlaila
Jurnal Pengembangan Energi Nuklir Vol 2, No 2 (2000): Juni 2000
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2000.2.2.2014

Abstract

ABSTRAK ANALISIS KINERJA OPERASI PEMBANGKIT LISTRIK TENAGA NUKLIR TIPE LWR DI JEPANG. Suatu analisis telah dilakukan terhadap data kinerja operasi Pembangkit Listrik Tenaga Nuklir (PLTN) LWR di Jepang selama kurun waktu beberapa tahun terakhir. Analisis tersebut dimaksudkan untuk memperoleh gambaran keunggulan kinerja operasi PLTN LWR di Jepang, khususnya dibanding PLTN sejenis di berbagai negara maju, sekaligus mengambil manfaat dari pengalaman Jepang di dalam memanfaatkan energi nuklir sebagai sumber energi listrik yang aman, andal, kompetitif, dan ramah lingkungan. Analisis dilakukan terhadap tiga aspek operasi PLTN yaitu teknis, ekonomi, dan lingkungan, yang mencakup beberapa parameter kinerja operasi, antara lain: faktor kapasitas, tingkat pemadaman paksa, jumlah insiden dan kegagalan, biaya produksi listrik, serta produksi limbah radioaktif padat, dan emisi gas C02. Selanjutnya dilakukan perbandingan faktor kapasitas dan scram rate PLTN yang beroperasi di berbagai negara maju. Pencapaian faktor kapasitas di atas 75% dan scram rate di bawah 0,6 per reaktor-tahun, menunjukkan keunggulan PLTN LWR Jepang dibanding PLTN serupa di beberapa negara maju termasuk PLTN HWR di Kanada yang menerapkan “on-load refuelling". PLTN juga telah membuktikan sebagai pembangkit listrik termurah (9 Yen/kWh), dan telah pula berperan penting di dalam upaya pengurangan emisi gas rumah kaca, khususnya C02. Kinerja yang tinggi ini dipandang sebagai bukti empiris teruji dari teknologi PLTN LWR Jepang yang merupakan hasil implementasi yang konsisten dari "Program Perbaikan dan Standardisasi LWR" yang dimulai tahun 1975. Hasil analisis ini dapat menjadi masukan berguna bagi pemerintah Indonesia atau berbagai pihak terkait yang berperan melakukan penilaian terhadap berbagai teknologi PLTN yang saat ini tersedia di pasar global sebagai persiapan introduksi PLTN di Indonesia.   ABSTRACT ANALYSIS ON THE OPERATION PERFORMANCE OF THE JAPANESE LWR TYPE NUCLEAR POWER PLANTS. An analysis has been conducted on the operation performance of the Japanese LWR-type Nuclear Power Plants (NPPs) during the last several years. This analysis is intended to draw the general profile of the excellency of the Japanese LWR-type NPPs especially in comparison with the plants being operated in another advanced countries, as well as to take advantage from the Japanese experiences in utilizing nuclear energy as a safe, reliable, competitive, and environmentally benign electricity energy sources. Analysis is started from three operation aspects, i.e. technical, economic, and environment, which covers the following performance parameters, i.e. capacity factor, scram rate, incident/failure, generation cost, as well as solid radioactive waste and C02 gas production. Additionally, this performance is compared with the NPPs being operated in other advanced countries in term of capacity factor and scram rate. The achievement of capacity factor more than 75% and scram rate less than 0.6 per reactor-year shows that Japanese LWR NPP performance surpasses those from the other advanced countries, even the Canadian PHWR CANDU which incorporates on-load refueling. Nuclear energy yields the cheapest electricity generation cost (9 Yen/kWh), besides contributing significant role in the reduction of C02. This performance achievement is recognized as the proven empirical evidence for the excellency of Japanese NPP technology which has been resulted from the consistent implementation of the “LWR Improvement & Standardization Program” started in 1975. The result of this analysis might become a valuable input to the Government of Indonesia and to the other related parties which might get involved in selecting the NPP technology currently available in the global market prior to the NPPs introduction in Indonesia.
ANALISIS SEISMISITAS UNTUK SEMENANJUNG MURIA Masyhur Irsyam; Agus Himawan; Berny A. Subki; Hadi Suntoko
Jurnal Pengembangan Energi Nuklir Vol 2, No 2 (2000): Juni 2000
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2000.2.2.2015

Abstract

ABSTRAK ANALISIS SEISMISITAS UNTUK SEMENANJUNG MURIA. Semenanjung Muria mempunyai potensi untuk menjadi kawasan penting di masa mendatang. Makalah ini menyajikan studi kegempaan untuk daerah Semenanjung Muria mulai dari kondisi geologi, analisis risiko gempa, pembuatan digitasi sintetis serta perambatan gelombang gempa dari batuan dasar ke permukaan. Sumber-sumber gempa, dimana dianggap memberikan kontribusi yang signifikan dalam analisis risiko gempa, mencakup seluruh sumber gempa sampai kedalaman fokus 200 km pada daerah dengan radius 500 km dari Semenanjung Muria. Mekanisme gempa yang terjadi di daerah ini pada umumnya dapat dibedakan atas patahan-patahan di Laut Jawa dan gempa-gempa subduksi di sebeiah seiatan Puiau Jawa. Anaiisis risiko gempa diiakukan berdasarkan teori probabilitas total untuk berbagai periode ulang gempa. Untuk dapat menggambarkan mekanisme gempa yang terjadi sehingga memberikan hasil anaiisis yang sesuai, digunakan dua fungsi atenuasi, yaitu : (i) fungsi atenuasi yang dikembangkan oleh Boore et al. (1997) dan (ii) fungsi atenuasi yang diusulkan oleh Youngs et al. (1997). Input motion yang digunakan untuk perambatan gelombang diperoleh dengan membuat digitasi percepatan sintetik di batuan dasar. Pembuatan digitasi sintetik dilakukan dengan menggunakan teorema gerakan acak. Analisis perambatan gelombang geser dari batuan ke permukaan dilakukan untuk mengetahui respons deposit tanah permukaan akibat motion di batuan dasar. Dari analisis ini diperoleh percepatan maksimum dan spektrum respons elastik di permukaan yang dapat digunakan sebagai input untuk penentuan beban gempa pada bangunan dan untuk anaiisis dinamik.   ABSTRACT SEISMICITY ANALYSIS OF MURIA PENINSULA. Muria Peninsula has a potential value to be an important region in the future. This paper describes seismicity study of the Peninsula starting from its geology, seismic risk analysis, synthetic digitization, and finally seismic attenuation study from base rock to the ground. Seismic sources, which contribute significant values within such analysis cover every single seismic source up to 200-km depth, in 500-km radius of Muria Peninsula. Seismic mechanism which occupy this region in general can be divided into, Java sea faults system and subduction triggered faults of southern Java. Seismic risk analysis was done based on total probability theory under varieties condition for recurrence interval. In order to elucidate real seismic mechanism, two attenuation functions was used : (i) attenuation function developed by Boore et ai. (1997), and (ii) attenuation function developed by Youngs et al. (1997). Motion input was utilized in wave attenuation in order to digitize synthetic velocity in the base rock. To establish synthetic digitization, random mechanism theory was used respectively. Shear wave attenuation analysis from base rock to the upper ground is conducted to understand the response of ground soil layers triggered by such motions. From this analysis maximum acceleration and elastic response was solved, which can be used as input to define structure seismic loads and dynamic analysis.

Page 1 of 1 | Total Record : 4


Filter by Year

2000 2000


Filter By Issues
All Issue Vol 23, No 2 (2021): Desember 2021 Vol 23, No 1 (2021): Juni 2021 Vol 22, No 2 (2020): Desember 2020 Vol 22, No 1 (2020): Juni 2020 Vol 21, No 2 (2019): Desember 2019 Vol 21, No 1 (2019): Juni 2019 Vol 20, No 2 (2018): Desember 2018 Vol 20, No 1 (2018): Juni 2018 Vol 19, No 2 (2017): Desember 2017 Vol 19, No 1 (2017): Juni 2017 Vol 18, No 2 (2016): Desember 2016 Vol 18, No 1 (2016): Juni 2016 Vol 17, No 2 (2015): Desember 2015 Vol 17, No 1 (2015): Juni 2015 Vol 16, No 2 (2014): Desember 2014 Vol 16, No 1 (2014): Juni 2014 Vol 15, No 2 (2013): Desember 2013 Vol 15, No 1 (2013): Juni 2013 Vol 14, No 2 (2012): Desember 2012 Vol 14, No 1 (2012): Juni 2012 Vol 13, No 2 (2011): Desember 2011 Vol 13, No 1 (2011): Juni 2011 Vol 12, No 2 (2010): Desember 2010 Vol 12, No 1 (2010): Juni 2010 Vol 11, No 2 (2009): Desember 2009 Vol 11, No 1 (2009): Juni 2009 Vol 10, No 2 (2008): Desember 2008 Vol 10, No 1 (2008): Juni 2008 Vol 9, No 2 (2007): Desember 2007 Vol 9, No 1 (2007): Juni 2007 Vol 8, No 2 (2006): Desember 2006 Vol 8, No 1 (2006): Juni 2006 Vol 7, No 2 (2005): Desember 2005 Vol 7, No 1 (2005): Juni 2005 Vol 6, No 2 (2004): Desember 2004 Vol 6, No 1 (2004): Juni 2004 Vol 5, No 2 (2003): Desember 2003 Vol 5, No 1 (2003): Juni 2003 Vol 4, No 2 (2002): Desember 2002 Vol 4, No 1 (2002): Juni 2002 Vol 3, No 2 (2001): Desember 2001 Vol 2, No 4 (2000): Desember 2000 Vol 2, No 3 (2000): September 2000 Vol 2, No 2 (2000): Juni 2000 Vol 2, No 1 (2000): Maret 2000 Vol 1, No 4 (1999): Desember 1999 Vol 1, No 3 (1999): September 1999 Vol 1, No 1 (1999): Maret 1999 More Issue