cover
Contact Name
Nur Hasanah
Contact Email
nur.hasanah@batan.go.id
Phone
+6221-5204243
Journal Mail Official
jpen@batan.go.id
Editorial Address
Kawasan Kantor Pusat Badan Tenaga Nuklir Nasional Jl. Kuningan Barat, Mampang Prapatan, Jakarta 12710 Kotak Pos 4390 Jakarta 12043
Location
Kota adm. jakarta selatan,
Dki jakarta
INDONESIA
Jurnal Pengembangan Energi Nuklir
ISSN : 14109816     EISSN : 25029479     DOI : https://doi.org/10.17146/jpen
Jurnal Pengembangan Energi Nuklir publishes scientific papers on the results of studies and research on nuclear energy development with the scope of energy and electricity planning, nuclear energy technology, energy economics, management of nuclear power plants, national industries that support nuclear power plants, aspects of the nuclear power plant site and environment, and topics others that support the development of nuclear energy.
Articles 4 Documents
Search results for , issue "Vol 2, No 4 (2000): Desember 2000" : 4 Documents clear
PROYEKSI NERACA ENERGI INDONESIA HINGGA TAHUN 2027 (DENGAN OPSI NUKLIR) Edwaren Liun
Jurnal Pengembangan Energi Nuklir Vol 2, No 4 (2000): Desember 2000
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2000.2.4.2021

Abstract

ABSTRAK PROYEKSI NERACA ENERGI INDONESIA HINGGA TAHUN 2027 (DENGAN OPSI NUKLIR). Akibat keterbatasan sumberdaya energi Indonesia, terutama cadangan minyak bumi, sementara belum optimalnya program konservasi dan diversifikasi bahan bakar minyak, dan belum optimalnya pemanfaatan sumber energi barn (new energy), maka dalam waktu dekat Indonesia diperkirakan akan menjadi net-importer of oil. Sektor ekspor merupakan sektor demand terbesar selama 30 tahun ke depan dengan pertumbuhan hanya 2,2% per tahun, namun mengambil porsi 42% energi nasionai selama waktu tersebut, terdiri dari berturut-turut dari yang terbesar adalah gas, batubara dan crude oil. Permintaan energi untuk semua sektor demand akan terus meningkat sesuai dengan perkembangan makroekonomi khususnya GDP dan pertumbuhan jumlah penduduk, namun juga dipengaruhi oleh ketersediaan dan keterbatasan sumberdayanya. Sektor industri diprediksi akan mengalami kenaikkan demand tertinggi sebesar rata-rata 10,6% diikuti tranportasi rata-rata 10,4% per tahun. Opsi nuklir yang mengacu pada hasil optimasi sistem kelistrikan dengan studi WASP yang mengintroduksi nuklir pada tahun 2009, jika direalisasikan hanya akan menyumbang 5,5% dari total kebutuhan energi nasionai. Secara keseluruhan permintaan energi naik rata-rata sebesar 7,13% per tahun selama periode studi tersebut. Metodologi yang digunakan adalah dengan perhitungan kebutuhan energi berdasarkan proyeksi ekonomi hingga 30 tahun mendatang serta penerapan berbagai parameter atas dayadukung sumberdaya energi yang tersedia.   ABSTRACT INDONESIAN ENERGY BALANCE PROJECTION UNTIL 2027 (WITH NUCLEAR OPTION). Due to limited energy reserve in Indonesia, specifically crude oil resources, while conservation and diversification program are not optimum yet, and utilization of new energy not yet optimum also, in the near future Indonesia will become a net oil importer country. Export sector is the biggest demand for the next 30 years by 2.2% growth rate per year, evenly take 42% of the national energy during the period that consist of gas, coal and oil. Energy demand for all sectors will continually increase according to macro-economy development mainly GDP and population growth, and affected by availability and limitation of the resources. Industrial sector is predicted will be the highest demand by 10.6% average growth, followed by transportation of 10,4% average growth per year. Nuclear option referring to the optimum solution result of the electricity expansion planning using WASP model appearing nuclear on 2009, if realized, will contributes just 5.5 percent of total national energy demand. Total energy demand will increase by 7.13% a year during the study period. Applied methodology is energy demand calculations based on macro­economic projection beyond the next 30 years and application of several parameters on capability of the available energy resources.
KETERSEDIAAN TENAGA KERJA DI DAERAH TAPAK UJUNG LEMAHABANG Sri Hariani Sjarief
Jurnal Pengembangan Energi Nuklir Vol 2, No 4 (2000): Desember 2000
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2000.2.4.2022

Abstract

ABSTRAK KETERSEDIAAN TENAGA KERJA DI DAERAH TAPAK UJUNG LEMAHABANG. Sebagaimana diketahui pada setiap pembangunan suatu proyek akan membutuhkan dan memanfaatkan tenaga kerja. Tenaga ini dapat diambil dari dalam atau luar daerah di mana proyek itu akan dibangun. Penggunaan tenaga keija setempat akan meningkatkan pendapatan dan kesejahteraan penduduk di samping mengurangi dampak sosial yang mungkin teijadi. Sejalan dengan rencana pembangunan PLTN di Ujung Lemahabang, maka penelitian kependudukan dan sosio-ekonomi dari desa-desa sekitar lokasi (Balong, Tubanan, Kaliaman, Kancilan, Dermolo dan Bumiharjo) sangat diperlukan guna mengetahui perkembangan kependudukan dalam menyongsong teknologi maju yang akan diterapkan di sekitar daerah mereka, terutama dalam bidang pendidikan dan ketenaga-keijaan. Selama lima tahun sejak pengamatan terakhir yang dilakukan oleh Newjec, temyata penduduk sekitar Ujung Lemahabang mengalami peningkatan walau jumlahnya sangat kecil, yaitu 0,5% per tahun. Dari jumlah penduduk yang ada, 55,9% adalah dari angkatan kerja. Ditinjau dari pendidikan dan mata pencaharian masyarakat setempat juga mengalami perubahan, meskipun sebagian penduduk masih berpendidikan SD (38,7%) namun tamatan SLTP dan SLTA meningkat jumlahnya. Mata pencaharian utama setelah bertani adalah bekeija sebagai buruh industri. Dengan masuknya listrik ke desa-desa terpencil dan adanya perbaikan infrastruktur jalan masuk ke desa akan memacu perekonomian, informasi dan pendidikan penduduk setempat Peningkatan jumlah iulusan SLTA dan Perguruan Tinggi pada saat ini (4%), diharapkan dapat mengisi kebutuhan sebagian tenaga keija menengah yang tidak berkaitan dengan keselamatan reaktor pada saat PLTN dibangun. Untuk mencapai kondisi tersebut periu pula digiatkan pemasyarakatan tentang teknologi nuklir yang menyentuh kepentingan masyarakat setempat baik dari bidang teknologinya maupun dari bidang sosio-ekonomi dan keselamatan lingkungan serta peraturan ketenaga-kerjaan yang akan mendukung partisipasi mereka daiam proyek ini.   ABSTRACT THE AVAILABILITY OF LABOR FORCES AT UJUNG LEMAHABANG'S SITE. It is known that labor force is needed and will be required in every project construction. This labor force could be taken from outside or inside the location where the project is being constructed. The employment of local manpower will raise the community's income and prosperity, besides decreasing the probable social impact. According to the planning of Nuclear Power Plant Project construction in the Ujung Lemahabang, thence a socio-economic observation of villages surounding the location (Balong, Tubanan, Kaliaman, Kancilan, Dermolo and Bumiharjo) has been done to understand the demographic development so far in commencing the application of advance technology. This socio-economic observation will be emphasized on the education and labor force aspects. In five years period since the past Newjec observation, the population surrounding Ujung Lemahabang is obviously increasing though in a small percentage (0,5% per year). The existent population consists of 55,9% of the work forces. From the occupation and education point of view, there are alterations. The graduate of Junior (SLTP) and Senior (SLTA) high school have been increased in number, in spite of elementary school graduate being still in the highest percentage. Instead of farming as the main job, people in this location work as labors in industries which are increasing in numbers. The improvement of road infrastructure and electricity so far to the isolated villages will speed up the economic, information and education development for people around the location. By the number of people graduated from Senior High School and University (4%) at the moment, it is expected that the requirement of middle labor forces could be taken from the local people when the NPP is ready to be build, especially for the activities which are not related to the reactor safety. To reach such condition, it is important to activate the Nuclear Technology Public Acceptance for the sake of people living around the location either from the field of technology itself or from the socio-economic and environmental safety. In other side the manpower regulation is still needed to support their participation in this project.
PERKEMBANGAN TEKNOLOGI PWR DI JEPANG Ahmad Syaukat
Jurnal Pengembangan Energi Nuklir Vol 2, No 4 (2000): Desember 2000
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2000.2.4.2023

Abstract

ABSTRAK PERKEMBANGAN TEKNOLOGI PWR DI JEPANG. Energi nuklir di Jepang merupakan sumber listrik yang stabil dan ekonomis. Dengan kontribusi lebih dari sepertiga daya listrik di Jepang dan akan terns meningkat di masa mendatang, PLTN memiliki peran yang penting dan strategis daiam mendukung pembangunan di Jepang. Semenjak awai pembangunan dan pengembangan program energi nuklir nasionai, perusahaan listrik di Jepang telah mengadopsi PLTN berpendingin air dari Amerika Serikat. Semua peserta bisnis nuklir termasuk industri dan pemerintah telah berusaha untuk meningkatkan faktor keselamatan, keandalan, dan ekonomi PLTN melalui program pengembangan dan standardisasi PLTN. PWR yang dibangun sekarang oleh Mitsubishi adalah PWR generasi ketiga yang memiliki ciri keandalan dan operasi yang sesuai dengan tuntutan operator dan lingkungan. Dengan telah disusunnya rancangan maju APWR oleh Jepang maka negara tersebut mencapai tahapan integrasi teknologi PWR dalam tranformasi teknologi PLTN yang telah diusahakannya seiama sekitar seperempat abad.   ABSTRACT THE DEVELOPMENT OF PWR TECHNOLOGY IN JAPAN. Nuclear energy in Japan is a stable and economical electric source. With a contribution of more than one third of the electric source in Japan, and more in the future, Nuclear Power Plant’s will have an important and strategic role in Japan’s industrial development. At the beginning of the national nuclear energy program, the Japanese electrical utilities have adopted the water moderated nuclear power plants from the USA All elements of the Japanese nuclear business, including industry and governments agencies made efforts to improve the safety, reliability and economic of NPPs through the improvement and standardization program of NPPs. The PWRs being constructed by Mitsubishi belong to the third generation PWRs which has reliability and operation characteristics suitable for the operator and environmental demand. Having achieved the advanced APWR design, Japan enters the technology integration phase of the NPPs technology transformation, which has been being implemented in nearly one fourth of a century.
POLA ANGIN LAUT DAN ANGIN DARAT DI DAERAH UJUNG LEMAHABANG, SEMENANJUNG MURIA Kurnia Anzhar; Yarianto Sugeng Budi Susilo
Jurnal Pengembangan Energi Nuklir Vol 2, No 4 (2000): Desember 2000
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2000.2.4.2024

Abstract

ABSTRAK POLA ANGIN LAUT DAN ANGIN DARAT DI DAERAH UJUNG LEMAH ABANG SEMENANJUNG MURIA. Lokasi tapak terpilih untuk fasilitas nuklir di Semenanjung Muria tedetak di daerah pantai. Pada lokasi pantai, pola angin dipengaruhi oleh pola lokal khususnya angin laut dan angin darat. Angin laut dan angin darat ini akan mempengaruhi pola penyebaran efiuen yang terlepas dari suatu fasilitas nuklir. Penelitian dilakukan dengan melakukan perhitungan komputasi berdasarkan data sekunder (Newjec, 1996) yaitu dengan menghitung kejadian angin laut dan angin darat. Arah angin dibagi dalam 8 sektor. Berdasarkan identifikasi diperoleh hasil bahwa di daerah Semenanjung Muria, kejadian angin lokal yang sangat berpengaruh adalah angin iaut yang terjadi pada musim kemarau. Pada bulan Juli s/d Desember antara pukul 08.00 - 16.00 WIB penyebaran polutan akan lebih dominan ke arah daratan.   ABSTRACT SEA AND LAND BREEZE PATERN AT UJUNG LEMAHABANG, MURIA PENINSULA. The candidate site for nuclear facilities at Muria Peninsula is located on-shore. At this location, the wind pattern were affected by a local wind pattern especially sea and land breeze. These breezes will affect the dispersion pattern of effluent from the nuclear facilities. The calculation of sea and land breeze occurrence is conducted based on secondary data (Newjec, 1996). Wind directions are divided into 8 sectors. The result of this identification is at Ujung Lemahabang site, sea breeze is dominant in the dry seasons. During July up to December at day-time (08:00 -16:00 WIB), pollutant dispersion is dominant to the land direction.

Page 1 of 1 | Total Record : 4


Filter by Year

2000 2000


Filter By Issues
All Issue Vol 23, No 2 (2021): Desember 2021 Vol 23, No 1 (2021): Juni 2021 Vol 22, No 2 (2020): Desember 2020 Vol 22, No 1 (2020): Juni 2020 Vol 21, No 2 (2019): Desember 2019 Vol 21, No 1 (2019): Juni 2019 Vol 20, No 2 (2018): Desember 2018 Vol 20, No 1 (2018): Juni 2018 Vol 19, No 2 (2017): Desember 2017 Vol 19, No 1 (2017): Juni 2017 Vol 18, No 2 (2016): Desember 2016 Vol 18, No 1 (2016): Juni 2016 Vol 17, No 2 (2015): Desember 2015 Vol 17, No 1 (2015): Juni 2015 Vol 16, No 2 (2014): Desember 2014 Vol 16, No 1 (2014): Juni 2014 Vol 15, No 2 (2013): Desember 2013 Vol 15, No 1 (2013): Juni 2013 Vol 14, No 2 (2012): Desember 2012 Vol 14, No 1 (2012): Juni 2012 Vol 13, No 2 (2011): Desember 2011 Vol 13, No 1 (2011): Juni 2011 Vol 12, No 2 (2010): Desember 2010 Vol 12, No 1 (2010): Juni 2010 Vol 11, No 2 (2009): Desember 2009 Vol 11, No 1 (2009): Juni 2009 Vol 10, No 2 (2008): Desember 2008 Vol 10, No 1 (2008): Juni 2008 Vol 9, No 2 (2007): Desember 2007 Vol 9, No 1 (2007): Juni 2007 Vol 8, No 2 (2006): Desember 2006 Vol 8, No 1 (2006): Juni 2006 Vol 7, No 2 (2005): Desember 2005 Vol 7, No 1 (2005): Juni 2005 Vol 6, No 2 (2004): Desember 2004 Vol 6, No 1 (2004): Juni 2004 Vol 5, No 2 (2003): Desember 2003 Vol 5, No 1 (2003): Juni 2003 Vol 4, No 2 (2002): Desember 2002 Vol 4, No 1 (2002): Juni 2002 Vol 3, No 2 (2001): Desember 2001 Vol 2, No 4 (2000): Desember 2000 Vol 2, No 3 (2000): September 2000 Vol 2, No 2 (2000): Juni 2000 Vol 2, No 1 (2000): Maret 2000 Vol 1, No 4 (1999): Desember 1999 Vol 1, No 3 (1999): September 1999 Vol 1, No 1 (1999): Maret 1999 More Issue