cover
Contact Name
-
Contact Email
-
Phone
-
Journal Mail Official
-
Editorial Address
-
Location
Kota semarang,
Jawa tengah
INDONESIA
Department of Naval Architecture
Published by Universitas Diponegoro
ISSN : -     EISSN : -     DOI : -
Core Subject : Engineering,
Jurnal Jurusan Teknik Perkapalan yang berisi artikel karya ilmiah mahasiswa program Sarjana Teknik Perkapalan universitas Diponegoro
Arjuna Subject : -
Articles 12 Documents
Search results for , issue "Vol 1, No 2 (2013): April" : 12 Documents clear
ANALISIS OPTIMASI KEBUTUHAN DAYA LISTRIK PADA KAPAL PENUMPANG RO-RO KM. EGON DENGAN METODE DYNAMIC PROGRAMMING Alexius Bayu Setyoko; Eko Sasmito Hadi; Untung Budiarto
Jurnal Teknik Perkapalan Vol 1, No 2 (2013): April
Publisher : Diponegoro University

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

KM. Egon is a passenger ship which is of the same type of Ro-Ro owned by PT. Pelayaran Nasional Indonesia (PELNI). This ship has two diesel generators and shaft generators. To produce enough power needed by the load, the four generators in KM. Egon should be able to operate efficiently. However, the arrangement of the load was less efficient so the use of fuel was wasteful. In this study, the researcher did several steps. First, calculating the capacity of the equipments was by counting the load factor value of the equipments. Second, finding out the number of the load in every operational condition of the ship, at port, maneuver, and shipping out. Third, finding out the load factor of the generator of the variation of the generator which was used with used the simulation of the dynamic programming method in order to get load which used the fuel efficiently. The calculation result of the number of the load in every condition for in port was 219.84 kW, then maneuver was 1014.37 kW, and shipping out was 419.55 kW. The dynamic programming method which was applied for KM. Egon ship in the simulation from Semarang to Kumai then  went back to Semarang. The efficient fuel consumption was in port or anchoring 41.43 liter/hour. It used diesel generator 1 or diesel generator 2. Then maneuver and shipping out was 27.90 liter/hour by operating one diesel generator and one shaft generator. Therefore, the total use of  fuel of auxiliary engine  in the simulation was 2622.42 liter.
RANCANG BANGUN SISTEM REFRIGERATED SEA WATER (RSW) UNTUK KAPAL NELAYAN TRADISIONAL Heru Firmansyah; Untung Budiarto; Kiryanto Kiryanto
Jurnal Teknik Perkapalan Vol 1, No 2 (2013): April
Publisher : Diponegoro University

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Pada saat ini sistem pendingin telah banyak digunakan dibidang perkapalan, baik pada kapal niaga maupun kapal perikanan. Namun hal ini tidak ditemukan pada kapal nelayan tradisional jenis Cukrik, yang belum memiliki sistem pendingin khusus untuk menangani masalah penurunan kualitas hasil tangkapannya. Untuk mengatasi masalah tersebut perlu dilakukan pembuatan Refrigerated Sea Water (RSW) yang aplikatif untuk kapal nelayan tradisional. Tahapan dari penelitian ini yaitu menghitung beban pendingin yang merupakan dasar untuk menentukan komponen-komponen RSW seperti daya kompresor, kondensor dan evaporator. Selanjutnya hasil perakitan sistem RSW ini dilakukan pengujian di laboratorium. Dari perancangan ini didapatkan sebuah prototipe sistem RSW yang sederhana untuk kapal nelayan tradisional jenis Cukrik dengan kapasitas palka sebesar 0,095 m3. Pada saat dilakukan pengujian temperatur palka tanpa menggunakan air dibutuhkan waktu 1 jam untuk menghasilkan temperatur 0 0C, sedangkan pengujian dengan menggunakan air laut dibutuhkan waktu 7 jam untuk menghasilkan temperatur 5 0C. Sebelum diaplikasikan di kapal perlu dilakukan analisa stabilitas menggunakan software, berdasarkan analisa tersebut didapatkan perubahan stabilitas pada titik GZ berkurang 0,012 m sedangkan untuk titik GM berkurang 0,016 m

Page 2 of 2 | Total Record : 12