cover
Contact Name
-
Contact Email
-
Phone
-
Journal Mail Official
-
Editorial Address
-
Location
Kota malang,
Jawa timur
INDONESIA
Journal of Engineering and Management in Industrial System
Published by Universitas Brawijaya
ISSN : 23383925     EISSN : 24776025     DOI : -
Core Subject : Engineering,
Journal of Engineering and Management in Industrial System is a peer reviewed journal. The journal publishes original papers at the forefront of industrial and system engineering research, covering theoretical modeling, inventory, logistics, optimizations methods, artificial intelligence, bioscience industry and their applications, etc.
Arjuna Subject : -
Articles 6 Documents
Search results for , issue "Vol. 6 No. 1 (2018)" : 6 Documents clear
BUSSINESS PROCESS REENGINEERING APPROACH FOR QUALITY REPORTING PROCESS (Case Study at PT D. Perdana, Pasuruan) Oktavianty, Oke
JEMIS (Journal of Engineering & Management in Industrial System) Vol. 6 No. 1 (2018)
Publisher : Industrial Engineering Department, Faculty of Engineering, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.jemis.2018.006.01.1

Abstract

Business Process Reengineering (BPR) is an effective and popular approach to deal with global competitiveness. It can be applied by companies to improve the effectiveness and efficiency of existing business processes. Developing a continual improvement and abandon the conventional ways will increase the work efficiency. The process can be transformed to create a more efficient process with value-added and get more benefit to the company in the future. In this study, the evaluation of quality reporting process was conducted by BPR approach. The re-design and reconstruction of the process with information technology implementation give a significant improvement in the work efficiency, both efficiency value, step number, and time efficiency.
QUALITY MEASUREMENT CUSTOMER SATISFACTION INDEX (CSI) METHOD AND IMPORTANCE-PERFORMANCE ANALYSIS (IPA) DIAGRAM PT. ASDP INDONESIA FERRY (PERSERO) Merak – Banten Gunawan, Akbar; Iqbal, Iqbal
JEMIS (Journal of Engineering & Management in Industrial System) Vol. 6 No. 1 (2018)
Publisher : Industrial Engineering Department, Faculty of Engineering, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.jemis.2018.006.01.2

Abstract

Service quality is a very important aspect to be considered to retain consumers. PT. ASDP INDONESIA FERRY (PERSERO) Merak Banten its duties as providers and services in the field of crossings. Measurement of customer satisfaction by using the method of the Customer Satisfaction Index (CSI) and Importance-Performance Analysis (IPA) diagram, Customer Satisfaction Index (CSI) value is 80,68%. which is the priority of improvement to improve customer satisfaction of PT ASDP INDONESIA that is in dimension of attributes intangible dimension is about toilet facility, this attribute need to be repaired because in its implementation there are still complaints from passengers and attributes that are contained in the dimensions responsiveness is regarding the speed and responsiveness in serving the passengers, responsiveness of the officer in providing information in providing the arrival and departure time , and the attributes contained in the assurance dimension is about the security level of the port area
PLANNING AND CONTROLLING INVENTORY OF COAL USING MODEL PROBABILISTIC Q BACKORDER WITH CONSIDER OF STORAGE CAPACITY Ekawati, Ratna
JEMIS (Journal of Engineering & Management in Industrial System) Vol. 6 No. 1 (2018)
Publisher : Industrial Engineering Department, Faculty of Engineering, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.jemis.2018.006.01.3

Abstract

Inventory of fuel is very important in the production process, because the fuel is one factor that ensures smooth production process. PT. XYZ is a company engaged in provision power and steam with the coal. On determining amount of the current inventory of coal in PT XYZ still fluctuating from storage capacity, so it is necessary to study the planning and controlling inventory of coal with consider of storage capacity. This study aims to optimize the amount of the coal fuel, determine reorder point, determine safety stock and determine total cost of inventory using inventory probabilistik Q model backorder storage capacity constrain. Data processing results obtained optimal order for each the coal is as much as 11.000 tons, Reorder point is as much as 607,346 tons, safety stock is as much as 1,292 tons and total cost of inventory is as much as Rp. 16.052.531.575 using inventory probabilistik Q model backorder storage capacity constrain. 
INTEGRATED RISK MANAGEMENT MODEL RELATED TO OCCUPATIONAL SAFETY IN MULTI-STOREY BUILDINGS Handayani, Dwi Iryaning
JEMIS (Journal of Engineering & Management in Industrial System) Vol. 6 No. 1 (2018)
Publisher : Industrial Engineering Department, Faculty of Engineering, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.jemis.2018.006.01.4

Abstract

The goal of this research is to apply risk management model related to the Occupational Health and Safety (OHS) by integrating Causal Effects Diagram (CED), Analytic Network Process (ANP) and Interpretive Structural Modeling (ISM). The research method consists of three (3) stages. Stage 1) Using CED method to know the correlation between the risks and their causes. Stage 2) Making an assessment by using Analytic Network Process (ANP) with Software Matlab, stage 3) Interpretive Structural Modeling (ISM) is used to get the model of connectivity in mitigation of occupational accident. From ANP method, it is clear that the dominant potential risk in structural phase is 44% and the highest cause of accident by human factor is 77%, and it is due to the unsafe behavior. ISM method is used to know the mitigation in reducing the occupational accident risks, namely improvement of Occupational Health and Safety (OHS) management, Each Scaffolding establishment must be inspected by a certified expert, the working methods must obey the Indonesian National Standard (SNI), The risk control should be done in relation to potential cause of occupational accident which can minimize the risk on construction work (zero accident).
PROJECT SCHEDULING ANALYSIS USING PRECEDENCE DIAGRAM METHOD (PDM) Novitasari, Andani Devi; Sandora, Rina; Lestari, Rahandini Lukita
JEMIS (Journal of Engineering & Management in Industrial System) Vol. 6 No. 1 (2018)
Publisher : Industrial Engineering Department, Faculty of Engineering, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.jemis.2018.006.01.5

Abstract

Many obstacles that affect the completion of the project late, like: weather, late general plan approval, late material arrival, less skills and others. The Precedence Diagram Method is the method used to create network planning especially project scheduling. This research will examine how to plan the proper project scheduling of Pressure Vessel project of PT Wika Technip which is done by PT. Barata Indonesia by using PDM.The results obtained from the cost calculation at 252 days of project life have total project cost of Rp.6.131.093.885,00 and at project age 243 days total project cost is Rp.6.236.994.056,00. In this case it is known that there is an increase in total cost of Rp.105.900.171,00 and the time difference of 9 days when the acceleration is done on the project duration from 252 days to 243 days.
PERFORMANCE ASSESSMENT AND EVALUATION OFCURVING MACHINE OPERATOR AT PT.XYZ USING ANALYTICAL HIERARCHY PROCESS(AHP) AND RATING SCALE rusdi, muhammad
JEMIS (Journal of Engineering & Management in Industrial System) Vol. 6 No. 1 (2018)
Publisher : Industrial Engineering Department, Faculty of Engineering, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.jemis.2018.006.01.6

Abstract

PT. XYZ is a company engaged in manufacturing the defense and security products for military and commercial, which consists of 20% of military products and 80% of commercial products. This study aims to determine the performance assessment of the curving machineoperators in PT.XYZ. Previously, the system of operator's performance assessment has an incomplete criterion that is less likely to reflect actual operator performance and the absence of reference data for annual bonus sharing. To get an accurate operator performance, then conducted an assessment based on the Spencer competency owned by each operator. The dimensions of this assessment are based on objective and subjective judgments. Research data were collected by observation and filling out the questionnaire.Then, data were analyzed using Expert Choice software. The method of Analytic Hierarchy Process (AHP) was chosen in accordance with the research problems and objectives. After obtaining the final result of weight of Analytic Hierarchy Process (AHP), the next performance assessment was done by integration with Rating Scale method. The results show that there is a difference in the measurement of performance evaluation of the prior and new method, this is due to additionalcriteria taken into the new assessment, including absenteeism (presence), quantity of work, work quality, work safety, teamwork, and so forth.

Page 1 of 1 | Total Record : 6