Perencanaan Dermaga dan Dinding Penahan Tanah serta Pembuatan Website Wisata di Desa Bahu Palawa Mega Citra Noraisyah; Andikha Prayoga; Maria Olivia Septiana; Putri Pradiastiwi; Ahmad Sila Nurwanda; Okta Pria Dinata; Yehezkiel Noverino; Rudi Waluyo
Diteksi : Jurnal Pengabdian Kepada Masyarakat Vol. 4 No. 1 (2026): Diteksi, Vol. 4, No. 1, Mei 2026
Publisher : Fakultas Teknik Universitas Palangka Raya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36873/diteksi.v4i1.24472

Abstract

The Building and Impact Engineering Program (TMB) at Palangka Raya University in 2025 is a form of community service based on civil engineering knowledge. The implementation of this activity took place in Bahu Palawa Village in Kahayan Tengah District, Pulang Pisau Regency, Central Kalimantan Province, with a focus on planning a wooden pier, retaining wall, as well as creating a village tourism website. The main objective of this activity is to support the development of tourism potential and village culture in a sustainable manner through improving infrastructure and digitizing tourist information. In its implementation, students carry out field surveys using simple measuring tools such as roll meters and cameras For the initial geometric measurements and verification of the existing pier conditions, interviews were conducted with village officials, and technical documents were prepared, including the Detail Engineering Design (DED) and the Cost Estimate Plan (Rencana Anggaran Biaya/RAB). In addition, a tourism website was developed to serve as the village’s official digital promotion platform, featuring the village profile, tourism potential, gallery, and an accessible location map for both the public and visitors. The final results indicate that this project successfully produced infrastructure planning and digital media that are ready for implementation, with a total estimated budget of approximately IDR IDR 4,966,843,000.00 (four billion nine hundred sixty-six million eight hundred forty-three thousand rupiah).
Faktor-faktor Penyebab Keterlambatan Proyek Konstruksi Gedung di Kota Palangka Raya Berdasarkan Persepsi Stakeholder Mega Citra Noraisyah; Wita Kristiana
Jurnal Basement : Jurnal Teknik Sipil Vol. 4 No. 2 (2026): Jurnal Basement : Jurnal Teknik Sipil
Publisher : Program Studi Teknik Sipil Fakultas Teknik Universitas Palangka Raya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36873/basement.v4i2.25319

Abstract

The construction sector plays an important role in supporting national economic growth and regional development, including in Palangka Raya. However, in practice, construction projects still frequently experience delays that lead to cost overruns, reduced work quality, and inefficiencies in project scheduling. This study aims to identify the factors causing delays in building construction projects in Palangka Raya City based on stakeholder perceptions. The method used is a literature study with a qualitative descriptive approach through secondary data analysis sourced from scientific journals, books, regulations, and relevant previous research. The results show that there are 8 main factors and 40 indicators contributing to construction project delays, namely labor, materials, equipment, design and planning, site conditions, managerial aspects, financial issues, and unforeseen events. The most dominant factors commonly found include labor shortages, delayed material delivery, design changes by owners, weak on-site supervision, unpredictable weather conditions, and limited material availability in the market. This study is expected to serve as a reference for related parties in improving project planning, supervision, and control so that project implementation can be more effective, efficient, and meet quality standards and timelines