Road Damage Analysis Using the AHP (Analytical Hierarchy Process) Method as the Basis for Road Handling Programs on Provincial Roads in Pacitan Regency Fuad Jauhar Zuhri; Andi Patriadi; Sajiyo Sajiyo
TRANSPUBLIKA INTERNATIONAL RESEARCH IN EXACT SCIENCES Vol. 4 No. 1 (2025): JANUARY
Publisher : Transpublika Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55047/tires.v4i1.1579

Abstract

Land transportation infrastructure, such as roads and bridges, plays a crucial role as a link between regions that supports the economic, social, and cultural growth of a region. With limited budget in road management in Pacitan Regency, priority determination is needed to ensure that road management is carried out more efficiently and on target. This study aims to calculate the weight of the criteria using the Analytical Hierarchy Process (AHP) method based on expert opinions and to determine the priority order of road management in Pacitan Regency by utilizing the Provincial/Regency Road Management System (PKRMS) application, the AHP method, and a combination of the two methods. The method used in this study involves AHP with six criteria, namely road conditions, traffic volume, road connectivity, regional development, connecting economic and agricultural areas, and connecting public service facilities. This study focuses on five road sections in Pacitan Regency. The results of the study show that based on the AHP method, the road connectivity criterion gets the highest weight of (35%), followed by connecting public service facilities (22%), road conditions (14%), connecting economic and agricultural areas (13%), regional development (12%), and traffic volume (4%).
Analysis of Project Time Using the Earned Value Method Concept on the Situbondo District Bagor Bridge Replacement Project Yonandika Pandu Putranto; Andi Patriadi; Sajiyo Sajiyo
INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM Vol. 4 No. 1 (2025): FEBRUARY
Publisher : Transpublika Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55047/ijateis.v4i1.1575

Abstract

This research aims to analyze the time and cost efficiency of the Bagor Bridge Replacement Project in Situbondo Regency using the Earned Value Method. The research employs a qualitative descriptive approach, where data is collected through literature studies, field observations, and analysis of project documents such as plan drawings and weekly reports. Data analysis techniques include calculating several indicators, including Cost Performance Index (CPI), Schedule Performance Index (SPI), and Variance at Completion (VAC). The results showed that in weeks one to nine, the project ran according to the planned schedule, but there was a delay between weeks ten to nineteen. In the twentieth to twenty-fourth week, the project made progress again. The effectiveness of project time and cost control was obtained with a score value of 1.603, which indicates that project control is very effective. Based on these results, it is recommended that the implementing contractor compile detailed daily reports to monitor cost overruns and anticipate existing risks. The use of Earned Value method can be combined with other methods to maximize project control. In addition, logistics, equipment, and resource management should be considered to prevent unwanted problems.
Analysis of Pavement Damage Types on Provincial Roads in the Madura Region Adi Kurniawan; Andi Patriadi; Sajiyo Sajiyo
INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM Vol. 4 No. 1 (2025): FEBRUARY
Publisher : Transpublika Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55047/ijateis.v4i1.1576

Abstract

Roads play a crucial role in fostering economic development and facilitating transportation within communities. However, in the Madura region, issues such as cracks, potholes, and raveling are frequently observed, posing challenges to road quality and safety. This study aims to investigate the prevalent types of road defects in this area in order to inform better infrastructure planning and management. To achieve this objective, the research focused on provincial roads in the Madura region, utilizing a combination of field surveys and questionnaires with road users in Pamekasan. The findings of the study highlighted cracks, potholes, and grain detachment as the most commonly observed forms of road damage in the region. These results are essential for guiding decision-making processes related to road maintenance and repair, ultimately enhancing the efficiency and quality of road infrastructure. The insights gained from this study offer valuable guidance for policymakers and stakeholders involved in road infrastructure development. Recommendations arising from the research include prioritizing the management of road damage, ensuring adequate budget allocation for repairs, and implementing regular maintenance practices to prevent deterioration.
Road Damage Analysis Using the Analytical Hierarchy Process Method Based on Provincial/District Road Management System as the Basis for Road Handling Program Fuad Jauhar Zuhri; Andi Patriadi; Sajiyo Sajiyo
INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM Vol. 4 No. 1 (2025): FEBRUARY
Publisher : Transpublika Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55047/ijateis.v4i1.1578

Abstract

This study aims to determine the priority order of road handling in Pacitan Regency using the Analytical Hierarchy Process (AHP) method in combination with the Provincial/District Road Management System (PRMS) application. This research involved provincial roads in Pacitan District, with primary data collection through field surveys and AHP questionnaires distributed to experts. The results of the analysis show that combining the PRMS and AHP methods provides a more accurate and objective prioritization order, with the final result identifying the road sections that need the most urgent handling. prioritization of road handling based on AHP and PRMS methods. Based on the criteria weighting results, the Wareng - Mukus section has the highest priority with a weight of 0.24, followed by the Arjosari - Purwantoro section with a weight of 0.23, and the Bts. Ponorogo Regency - Bts. Pacitan City with a weight of 0.21. In the PRMS analysis, road handling priorities based on TPI (Infrastructure Priority Level) also show similar results, with the Wareng - Mukus section as the highest priority (TPI 33.1), followed by the Bts. Ponorogo Regency - Bts. Pacitan City (TPI 12.2), and the Arjosari - Purwantoro section (TPI 11.2). This research is expected to provide useful recommendations for road management and planning in Pacitan District.
Feasibility Analysis of the Construction of the North Surabaya Hospital from the Financial Aspect Lestyanto Wahyu; Andi Patriadi; Sajiyo Sajiyo
JOURNAL OF HUMANITIES, SOCIAL SCIENCES AND BUSINESS Vol. 4 No. 2 (2025): FEBRUARY
Publisher : Transpublika Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55047/jhssb.v4i2.1580

Abstract

The purpose of this research is to analyze the investment feasibility of North Surabaya Hospital, Bulak District, Surabaya City with the parameters of Net Present Value, Internal Rate of Return, Benefit Cost Ratio (BCR) and Payback Period. This research focuses on the North Surabaya Hospital which was built by the Surabaya City Government Health Office with a budget allocation for the 2026 fiscal year. The research instruments used are interview guidelines and observation sheets, with data collection procedures through interviews with related parties in hospital construction, site observation, and documentation which includes primary and secondary data. Based on the investment analysis of North Surabaya Hospital and sensitivity evaluation of operational costs and potential income, the conclusions obtained are: Alternative 1 is feasible because it produces an NPV value of Rp. 211,014,227,005, IRR of 9.85%, BCR of 1.23 and PP of 7.69 years. Alternative 2 is not feasible because it generates NPV of IDR 28,416,192,984, IRR of 6.57%, BCR of 1.14 and PP of 8.34 years. Alternative 3 is not feasible because it generates NPV of IDR 66,444,241,124, IRR of 7.30%, BCR of 1.16 and PP of 8.20 years. Alternative 4 is feasible because it generates NPV of Rp. 166,294,504,181, IRR of 9.26%, BCR of 1.20 and PP of 7.70 years.