Claim Missing Document
Check
Articles

Found 1 Documents
Search

Analisis Keseimbangan Lintasan Produksi untuk Meminimimalkan Waktu Tunggu Proses Produksi pada PT. XYZ Alim Mulya Wibowo; Erni Puspanantasari Putri
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 9 No. 2 (2026): April
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v9i2.58630

Abstract

This study aims to analyze the production line balance to minimize bottlenecks and waiting times in the cardboard packaging production process at PT. XYZ. The initial production line, consisting of 5 workstations, exhibited low efficiency, with a line efficiency of 40.84%, a balance delay of 59.16%, and a smoothness index of 13.189. The approach used to address this workload imbalance issue is the Ranked Positional Weight (RPW) method. The analysis results recommend a structural change by consolidating work elements into 3 integrated workstations. This proposed improvement yields a significant increase in line performance, with line efficiency rising to 68.06%, balance delay decreasing to 31.94%, and the smoothness index improving to 7.135. In conclusion, the RPW method has proven effective in balancing the production line and improving production efficiency.