Claim Missing Document
Check
Articles

Found 1 Documents
Search

Analisis Beban Kerja untuk Menentukan Jumlah Tenaga Kerja Optimal Dalam Upaya Meningkatkan Produktivitas Ramdhan Syafri Syamsudin; Erni Puspanantasari Putri
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 9 No. 2 (2026): April
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v9i2.58866

Abstract

UD. Gajah Delta is a manufacturing company whose main products are rantang and bakso steamers. Based on the current situation in the field, UD Gajah Delta has difficulty meeting market demand. Gajah Delta berjuang untuk memenuhi permintaan pasar. This is thought to be due to an imbalance in workload between workstations, as well as suboptimal planning of the number of employees. The aim of this study is to determine the optimal number of employees to meet customer demand. Based on the workload measurement using the Full Time Equivalent (FTE) method, two workstations were found to be normal: the cutting station (1.24) and the finishing station (1.22). However, the workstations for lid production (2.68) and sieve production (4.25) were categorised as overload. Meanwhile, the handle production station had an FTE value of 5.77 and the pot body production station had an FTE value of 8.98. Therefore, it is necessary to increase the number of employees at the stations for making handles and making the body of the steamer.