Dwiarta Agustina Lubis
Universitas Indonesia

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Maturity Level of Client in the Implementation of Construction Safety Management System Dwiarta Agustina Lubis; Rossy Armyn Machfudiyanto
Journal Research of Social Science, Economics, and Management Vol. 5 No. 11 (2026): Journal Research of Social Science, Economics, and Management
Publisher : Publikasi Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59141/jrssem.v5i11.1552

Abstract

The implementation of the Construction Safety Management System (SMKK) generally focuses on contractors because accidents often occur during construction work. However, construction safety is a shared responsibility among all parties involved in construction projects. This study aims to identify the safety maturity level of clients in the implementation of SMKK and to develop strategies to improve client safety maturity so that SMKK implementation can be enhanced. The measurement of client safety maturity used criteria based on the audit form attached to Permen PUPR No. 10 of 2021 concerning SMKK, which was validated by experts through two rounds of the Delphi method. Respondent samples were selected based on specific criteria using purposive sampling to obtain respondents who served as Budget User Representatives, Commitment-Making Officials, and Procurement Working Groups in the procurement of construction goods and services. Expert validation was used to assess the suitability of conditions and formulate strategies. The results of the study showed that the maturity level of clients was between reactive and compliant. Internal audits and management reviews by clients in the implementation of SMKK were generally conducted only when accidents occurred. To improve SMKK implementation, clients need to establish clear procedures as references for conducting audits and management reviews.