Analisis Peran Pejabat Pembuat Komitmen (PPK) dalam Penanganan Keterlambatan Proyek Pembangunan Gedung Plaza Aspirasi Ade Irfansyah; Satyanto Krido Saptomo; Moh. Yanuar Jarwadi Purwanto
Jurnal Sosial Teknologi Vol. 6 No. 1 (2026): Jurnal Sosial dan Teknologi
Publisher : CV. Green Publisher Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59188/jurnalsostech.v6i1.32620

Abstract

The construction of the Plaza Aspirasi Building experienced significant delays due to the contractor's weak technical and managerial readiness, land issues that led to a 43-day work stoppage, and the contractor's unpreparedness to fulfill the implementation plan. This condition caused the progress deviation to continue to increase until the project entered the critical contract category. This study aims to analyze the role of the Commitment Making Officer (PPK) in handling delays. Project delays occurred due to two factors: excuseable delays such as land claims by residents and non-excuseable delays in the form of the contractor's inability to manage the work project. The results of the study indicate that the PPK has carried out its contract control function systematically through issuing warnings, temporary suspensions, evaluation meetings, implementing tiered SCM, cross-agency coordination, and providing opportunities for work completion. Overall, the impact of delays on the project is not only seen in time deviations, but also spreads to the internal costs of service providers, work quality, and the effectiveness of contract management.
Engineering-Based Waterfront Redevelopment of Cipondoh Lake in 2022: An Adaptive Construction Approach for Urban Water Bodies Luki Haidir Ali; Satyanto Krido Saptomo; Moh. Yanuar Jarwadi Purwanto
Jurnal Indonesia Sosial Sains Vol. 7 No. 1 (2026): Jurnal Indonesia Sosial Sains
Publisher : CV. Publikasi Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59141/jiss.v7i1.2181

Abstract

The 2022 redevelopment of Situ Cipondoh represents an engineering-based waterfront intervention aimed at improving public space quality, socio-economic functions, and environmental conditions within an urban water body. This study documents and analyzes the technical implementation of adaptive construction methods in shallow-water environments, contributing to the body of knowledge on sustainable waterfront infrastructure development in densely populated urban areas. The project focused on the arrangement of key waterfront areas, construction of a flying-deck jogging track, development of a floating market for vendor relocation, and light water normalization. This paper applies a descriptive-analytical approach using construction documentation from 2022, supported by field observations, technical specifications analysis, and post-construction evaluation to assess the effectiveness of the engineering solutions implemented. The results show that the application of a flying-deck structure supported by mini piles installed from a pontoon constitutes an adaptive engineering solution suitable for aquatic environments with soft soil conditions and limited terrestrial access. Vendor relocation to the floating market improved spatial order while maintaining local economic activities and providing formal trading infrastructure compliant with hygiene and safety standards. Overall, the redevelopment enhanced public comfort, visual quality, tourism activity, and regional asset protection while demonstrating replicable engineering approaches for similar urban waterfront contexts.