ANALISIS PENGARUH BEBAN KENDARAAN TERHADAP SISA UMUR RENCANA JALAN PADA RUAS JALAN SOENANDAR PRIYO SUDARMO, KABUPATEN SIDOARJO Aldy Syahputra; Ibnu Sholichin; Aulia Dewi Fatikasari
Racic : Rab Construction Research Vol. 11 No. 1 (2026): JUNI
Publisher : LPPM Universitas Abdurrab

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36341/racic.v11i1.6472

Abstract

Soenandar Priyo Sudarmo Road, located in Sidoarjo Regency, East Java, is surrounded by various industrial facilities and storage warehouses, leading to significant stress on the pavement due to heavy vehicle traffic. This condition increases the risk of pavement deterioration. Therefore, this study aims to evaluate the impact of overloaded vehicles on the remaining service life of the pavement along Soenandar Priyo Sudarmo Road. The study utilizes both secondary data—such as Average Daily Traffic (ADT) and vehicle loads—and primary data obtained through field traffic surveys. The AASHTO 1993 method is employed to analyze the effect of vehicular loads on pavement life. Two scenarios are assessed: first, assuming all vehicles comply with standard axle loads; and second, analyzing the condition with overloaded freight vehicles based on actual overload data. Calculations include ESAL, W18, truck factor, and remaining pavement life. The analysis results indicate that the cumulative standard load (ΣW18) ranges from 372,983.25 to 16,839,371.72, while the overloaded condition ranges from 731,161.54 to 31,982,312.35. The remaining life percentage under overloaded traffic is reduced by 31%, resulting in a decreased service life of 3.1 years. Consequently, the pavement is projected to reach the end of its design life by November 2028.
Analysis of The Influence of Vehicle Overloading on The Remaining Life of The Road Plan Shafira Amalia Putri; Ibnu Sholichin; Aulia Dewi Fatikasari
Composite: Journal of Civil Engineering Vol. 3 No. 2 (2024): Desember 2024
Publisher : University of Merdeka Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26905/cjce.v3i2.13274

Abstract

The Sidoarjo East Ring Road is one of the roads in Sidoarjo. Along it are industrial warehouses, which are the main route for heavy vehicles such as trucks carrying large commercial goods. The presence of trucks carrying large commercial goods passing through the Sidoarjo East Ring Road affects the condition of the planned road pavement. Therefore, this research needs to be carried out to find out how much influence overloading has on reducing the design life of the road. This research uses AASHTO 1993 guidelines. There are two types of data: secondary data in the form of average daily traffic and vehicle load data crossing the Sidoarjo East Ring Road and primary data in the form of average daily traffic. From the data obtained, the ESAL value, W18 value, truck factor value, and remaining life of the road plan can be calculated. Based on the data analysis that has been carried out, the standard ΣW18 values are 471678.71 to 3467360.95, and the ΣW18 overload in 2021 is 626066.63 to 4625156.45. If the truck factor value is >1, the Sidoarjo East Ring Road section is experiencing overload due to heavy vehicles. The percentage value of remaining life due to LHR and overload is 7.392%, and in overload conditions, there is a reduction in the planned life of the road by 0.8 years from the planned life of 5 years, where the planned life of the road will end in 2025, the second month since the road opened in 2021.