Claim Missing Document
Check
Articles

Found 2 Documents
Search

Analysis of the Solar-Powered Street Lighting System in Petumbukan Village, Galang District, Deli Serdang Fery Karyanta Bangun; Haris Gunawan; , Dino Erivianto
Bahasa Indonesia Vol 18 No 5 (2026): Instal : Jurnal Komputer
Publisher : Cattleya Darmaya Fortuna

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54209/jurnalinstall.v18i5.520

Abstract

Street lighting (PJU) is a crucial infrastructure supporting social and economic activities, especially at night. Pertumbukan Village is one area that has tried implementing solar-powered street lighting as a public lighting solution. Therefore, this study was conducted to determine the street lighting system and its performance at night. This study used a descriptive-analytical approach with a case study approach and quantitative methods. The descriptive-analytical method was chosen because its primary objective was to describe the actual condition of the street lighting system. Based on the research results, the solar-powered street lighting in Petumbukan Village demonstrated quite good performance and could be operated properly. During sunny weather, all street lighting units functioned optimally with an average lighting time of 11 hours per night. The lamp's energy consumption of 660 Wh per day is much lower than the energy generated by solar panels, which is 3,600 Wh per day, so the system has a very adequate energy reserve. Although the lighting time is reduced during cloudy or rainy conditions (4–6.5 hours), the system still functions. This indicates that street lighting performance is significantly affected by weather. However, the overall system remains efficient and suitable as a solar-powered street lighting solution in rural areas. However, because system performance is significantly affected by weather, it is recommended to perform regular maintenance on the solar panels, such as cleaning the surface of the panels from dust and dirt, to maintain energy absorption efficiency. Furthermore, the energy-saving mode settings during the rainy season or during cloudy weather need to be properly adjusted to maintain optimal lighting duration.
Analisis Dampak Penetrasi Pembangkit Energi Terbarukan terhadap Profil Tegangan dan Kualitas Daya Jaringan Distribusi Siti Anisah; Zuraidah Tharo; Fery Karyanta Bangun
JET (Journal of Electrical Technology) Vol 11, No 3 (2026): Edisi Oktober
Publisher : Universitas Islam Sumatera Utara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30743/jet.v11i3.14312

Abstract

Penelitian ini bertujuan menganalisis dampak penetrasi pembangkit energi terbarukan terhadap profil tegangan dan kualitas daya jaringan distribusi. Penelitian menggunakan pendekatan kuantitatif empiris pada sistem interkoneksi berkapasitas 50 kWp yang terhubung pada jaringan 380/220 V dengan frekuensi nominal 50 Hz. Data terdiri atas tujuh titik pengamatan pada pukul 06.00–18.00 WIB yang meliputi daya injeksi, tegangan fase-netral, frekuensi, THDv, THDi, dan flicker. Tegangan meningkat dari 221 V pada daya 5 kW menjadi 229 V pada daya 48 kW, dengan rata-rata 224,86 V. Frekuensi rata-rata sebesar 49,997 Hz, THDv rata-rata 2,56%, THDi rata-rata 6,51%, dan flicker maksimum 0,42. Perhitungan ulang seluruh tujuh pasangan data menghasilkan koefisien korelasi Pearson r = 0.981 dan R² = 0.963. Model regresi linear adalah V = 220.731 + 0.162P, dengan V dalam volt dan P dalam kW. Hasil menunjukkan hubungan positif yang sangat kuat antara daya injeksi dan kenaikan tegangan pada titik interkoneksi. Parameter kualitas daya yang diamati tidak menunjukkan kondisi ekstrem selama periode pengukuran. Penelitian difokuskan pada parameter yang tersedia dan tidak memasukkan SAIDI, SAIFI, CAIDI maupun evaluasi BESS sebagai hasil empiris