Production Quantity Estimation Method in Continuous Line Flow and Discontinuous Line Flow Systems with Barchart Simulation Mhod Razif Idris; Andri Hermawan
Jurnal Improsci Vol 3 No 3 (2025): Vol 3 No 3 December 2025
Publisher : Ann Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.62885/improsci.v3i3.1035

Abstract

Background. Production quantity forecasting is a crucial element in the planning and control of manufacturing systems, as it directly affects operational efficiency and capacity utilization. Production systems are generally classified into continuous and discontinuous line flow, which differ in process flow characteristics and levels of variability. Aims. This study aims to examine production quantity forecasting methods for both systems using a Barchart simulation approach as a visualization and process time analysis tool. Methods. The research method used is a systematic literature review and conceptual modeling based on production time, cycle time, setup time, and waiting time. Conclusion. The results of the study indicate that Barchart simulation is effective in representing the stability of production flow in continuous line flow systems and identifying process variability and irregularity in discontinuous line flow systems. Implementation. Thus, the Barchart simulation can be used as a simple yet informative tool to support production quantity forecasting based on manufacturing system characteristics.
Lean Construction: Enhancing Efficiency And Quality In The Construction Industry Mhod Razif Idris; Andri Hermawan
Jurnal Improsci Vol 3 No 2 (2025): Vol 3 No 2 October 2025
Publisher : Ann Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.62885/improsci.v3i2.1051

Abstract

Background. Lean Management and Lean Construction have been widely recognized as effective approaches to improving efficiency, reducing waste, and enhancing organizational performance. However, the readiness of construction organizations—particularly State-Owned Enterprises (SOEs)—to implement Lean Management remains insufficiently explored, especially in developing countries. Aims. This study aims to assess the factors influencing Lean Management implementation and to evaluate the readiness level of Indonesian construction SOEs using a quantitative approach. The research adopts Lean Management as its theoretical foundation and applies the Lean Construction Maturity Model (LCMM) as the primary measurement framework to capture organizational readiness comprehensively. Methods. Data were collected through a structured questionnaire distributed to management-level respondents across six Indonesian state-owned construction companies, involving division heads, section managers, staff, and project managers, with a total sample of approximately 250 respondents. The analysis employs linear regression within a structural model to examine the relationships among key readiness factors, including leadership, culture and behavior, competence, continuous improvement support, processes and tools, organizational change, work environment, business results, and learning and competency development. Result. The findings are expected to provide empirical insights into the interdependencies among these factors and to identify critical readiness gaps that may hinder effective Lean Management implementation. Conclusion. This study contributes theoretically by extending the application of LCMM to Lean Management readiness assessment and practically by offering a structured diagnostic framework for SOEs seeking to enhance Lean adoption in the construction sector.