Perencanaan Saluran Drainase Jalan Lingkar Utara Subang Kuni Saadati; Eilif Kurnia Deda Djamres; Januari Yanto
Journal Information Technology Engineering and Science (JITES) Vol 5 No 1 (2025): JITES
Publisher : Universitas Tangerang Raya

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Drainage is a crucial aspect of road construction, as without drainage, runoff from the road surface will remain stagnant for a long time, leading to rapid damage to the surface. Knowledge of road drainage systems will significantly increase the road's lifespan. Considering the importance of road drainage, a calculation of the road drainage system for the North Ring Road in Subang Regency is required. The flood discharge used for the road drainage system design is calculated using the rational equation. The two main components of this method are the time of concentration and the intensity of rainfall. Therefore, in this calculation, the planned flood discharge for the drainage channel is calculated using the rational equation. The channel is designed to have sufficient dimensions to accommodate the planned discharge from the hydrological calculations, with a certain base slope to ensure smooth water flow without causing sedimentation or erosion. This results in a typical road drainage image that illustrates the shape and main components of the planned channel system to efficiently drain surface water from the road to the final drainage channel.
EVALUASI METODE PELAKSANAAN DAN PENGENDALIAN MUTU PONDASI PILE CAP PADA PROYEK PEMBANGUNAN GEDUNG APG TOWER DI BSD CITY Audyna Nadya Ade Putri; Raka Surya Pradana; Kuni Saadati
Journal Information Technology Engineering and Science (JITES) Vol 6 No 1 (2026): JITES
Publisher : Universitas Tangerang Raya

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Substructure work is an important part of multi-storey building construction becauseit transfers loads from the superstructure to the ground through the foundation system.This article aims to describe the pile cap construction work at the APG Tower projectin BSD City, focusing on construction stages, equipment, quality control, and siteproblems. A descriptive method was applied through field observation, workdocumentation, shop drawing review, and information gathering from relevant sitepersonnel. The observations showed that pile cap construction involved sitepreparation, excavation, bored pile head breaking, working-floor preparation,formwork and reinforcement installation, pre-pouring inspection, slump testing,concrete placement, compaction, and curing. The documented concrete test dated 18September 2026 recorded concrete grade FC 35 and a slump value of 13.5 cm. Waterponding was also observed in excavation area BP 127 associated with PC.1A. Thecondition was addressed through dewatering until the excavation area became dry.These findings indicate that pile cap construction requires a planned work sequence,quality inspections, and continuous monitoring of excavation conditions. However,comprehensive verification of technical compliance requires examination of