A CASE STUDY ON THE TECHNICAL FEASIBILITY OF FABRICATING A 700-BAR PRESSURE VESSEL USING THE DESIGN-BY-ANALYSIS (DBA) APPROACH AT PT PLN (PERSERO) Yanurarzaqa Ghiffari; Zulfikar Manggau; Muhamad Habibi
Bulletin of Engineering Science, Technology and Industry Vol. 4 No. 3 (2026): September
Publisher : PT. Radja Intercontinental Publishing

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Green-hydrogen deployment requires storage vessels capable of sustaining very high pressure while maintaining structural integrity and manufacturability. This study evaluates the technical feasibility of manufacturing a Type II hydrogen pressure vessel at PT PLN (Persero) PUSHARLIS using a Design-by-Analysis approach supported by finite element analysis. The study integrates engineering standards, material screening, workshop observations, design calculations, ANSYS simulation, manufacturing review, and hydrostatic-test planning. The proposed vessel uses an AISI 4130 steel liner with a 49 mm wall and a 14 mm composite hoop-wrapping layer under a 70 MPa (700 bar) internal pressure. Simulation produced a maximum von Mises stress of 381.75 MPa, below the 1,186 MPa yield strength adopted for the liner, with a minimum safety factor of approximately 3.05. The hydrostatic-test scheme uses 910 barg, equivalent to 1.3 times the design pressure. Local ASTM A36 can support prototype manufacturing-process development, but its lower strength makes it unsuitable for long-term high-pressure hydrogen storage. The results indicate a feasible domestic manufacturing pathway provided that high-pressure code qualification, material compatibility, testing capability, and quality assurance are strengthened.
Financial Analysis of 10MW Reserve Margin Bergerak (RMB) Provision in Island Power Systems Using LCT Platform Joko Nur Astanto; Zulfikar Manggau
SAINTEKS : Jurnal Sain dan Teknik Vol. 8 No. 02 (2026): September
Publisher : Universitas Insan Cendekia Mandiri

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37577/sainteks.v8i02.1142

Abstract

This study offers a thorough financial and risk analysis of a Reserve Margin Bergerak power plant system installed on Landing Craft Tank (LCT) platforms, aimed at improving energy security in Indonesia's remote and archipelagic areas. The total capital expenditure (CAPEX), which is IDR 77.74 billion including taxes, mainly covers engine generators and associated electrical infrastructure. The project's economic viability is assessed using Net Present Value (NPV) and Internal Rate of Return (IRR) under a fixed tariff structure, with a minimum IRR threshold of 8.24%. Sensitivity tests show that the project's success is highly affected by changes in CAPEX but less influenced by operational expenditure (OPEX) variations. A 10% increase in CAPEX drops the IRR to the viability limit, while a 30% cost reduction greatly improves returns. Changes in operational costs have little effect on IRR but slightly boost NPV. Following ISO 31000:2018 standards, risk analysis highlights critical operational risks including design mismatches, tariff inefficiencies, and low LCT utilisation all of which can be addressed through targeted technical reviews, tariff reforms, and deployment strategies. These results emphasise the importance of controlling investment costs and implementing structured risk management to ensure the long-term viability and financial appeal of mobile energy projects.
STUDY OF THE LOGISTICS CHARACTERISTICS OF SEA TRANSPORTATION FOR THE MOBILIZATION OF SOLAR POWER PLTS+BESS EQUIPMENT IN THE BAWEAN ISLANDS REGION Danang Nugroho Setyawan; Zulfikar Manggau
SOSIOEDUKASI Vol 15 No 4 (2026): SOSIOEDUKASI : JURNAL ILMIAH ILMU PENDIDIKAN DAN SOSIAL
Publisher : Fakultas Keguruan Dan Ilmu Pendidikan Universaitas PGRI Banyuwangi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36526/sosioedukasi.v15i4.9599

Abstract

The development of solar photovoltaic power plants (PLTS) integrated with Battery Energy Storage Systems (BESS) in archipelagic regions faces logistical challenges due to maritime transport dependence and limited port and inland road infrastructure. This study analyzes maritime transportation logistics for mobilizing and demobilizing equipment for a 3 MW and 6 MW PLTS+BESS project on Bawean Island, East Java. A descriptive-quantitative case study was conducted using primary data from road access surveys and vehicle maneuver simulations (swept path analysis), supported by secondary project assessment data. Results indicate two cargo categories: breakbulk cargo for heavy and oversized equipment, including battery systems, transformers, and mounting systems, and containerized cargo for solar modules, inverters, and cables. Two unloading alternatives were assessed: Bawean Port and a temporary jetty. Bawean Port provides lower estimated costs of IDR 61.1 billion, approximately 35% below the temporary jetty, while total mobilization requires approximately 73 working days. The findings support cost-effective and technically feasible logistics planning for renewable energy projects in remote archipelagic regions