Claim Missing Document
Check
Articles

Found 1 Documents
Search

Pengukuran Waktu Baku Proses Rehanging dengan Metode Time Study pada Industri Unggas Novia Hadias Safitri; Hardiana Widyastuti; Suhendi Irawan
Jurnal PASTI (Penelitian dan Aplikasi Sistem dan Teknik Industri) Vol. 20 No. 2 (2026): Jurnal PASTI
Publisher : Universitas Mercu Buana

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22441/pasti.2026.v20i2.002

Abstract

The rehanging process is one of the stages in production activities that requires a standard working time to support process flow and evaluate operator performance. However, the company does not yet have a standard time used as a reference, leading to work capacity uncertainty and triggering the failure to achieve daily output targets. This study aims to determine the standard time for the rehanging process as a basis for establishing work standards. The method used is a stopwatch time study. The observed time data were then tested using data uniformity and data adequacy tests. Furthermore, the cycle time, normal time considering the performance rating factor via the Westinghouse method, and standard time by adding the allowance factor were calculated. The results indicate that the observed data met the requirements for uniformity and adequacy, making them valid for standard time calculations. The standard time obtained for the rehanging process is 6,829 seconds per cycle. The standard time measurement results can serve as a reference for the company to establish work standards, evaluate operator productivity, balance the production line, and support more effective production planning and control.