Iswanto
Prodi Teknik Mesin, Fakultas Sains dan Teknologi, Universitas Muhammadiyah Sidoarjo

Published : 2 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 2 Documents
Search

Maintenance and Handling of Dryer Machines at PT.XYZ: Perawatan dan Penanganan Mesin Dryer di PT. XYZ Andik Abdul Jalil; Iswanto
Procedia of Engineering and Life Science Vol. 10 No. 1 (2026): Proceedings of the 9th Seminar Nasional Sains 2026
Publisher : Universitas Muhammadiyah Sidoarjo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21070/pels.v10i1.1640

Abstract

General Background The paper production industry relies heavily on sequential processing stages, where the drying phase is vital for achieving desired moisture levels, material ductility, and surface quality. Specific Background Dryer operations utilize heating systems and rotating drums to evaporate moisture from newly produced materials, requiring consistent temperature and ventilation control. Knowledge Gap Despite their critical role, these systems frequently experience operational disruptions due to unaddressed minor faults, which can lead to severe mechanical failures and suboptimal production if not properly managed. Aims This study investigates the common causes of equipment degradation and formulates systematic handling procedures to minimize operational downtime. Results Utilizing qualitative observation and interview methods over a 30-day period at a manufacturing facility, the research identifies five primary causes of physical damage: overheating, component wear, corrosion, transmission belt failure, and bearing degradation. Furthermore, the study delineates seven essential handling protocols, including scheduled inspections, precise lubrication, regular cleaning, timely component replacement, heating system monitoring, accurate temperature calibration, and comprehensive operator training. Novelty This research provides a structured, site-specific fault identification and handling framework tailored directly to industrial paper manufacturing operations. Implications Executing these targeted, scheduled handling protocols secures continuous production flow, preserves high material quality, and significantly reduces the risk of mechanical breakdowns. Highlights: Qualitative observation at a manufacturing facility revealed overheating, corrosion, wear, and bearing degradation as primary operational disruptions. Implementing scheduled inspections, cleaning, lubrication, and system calibration mitigates equipment failures. Comprehensive operator training combined with routine component replacement secures continuous production flow and consistent material quality. Keywords: Paper Production, Dryer Equipment, Preventive Maintenance, Mechanical Degradation, Operational Efficiency
Analysis of Waste in the Underframe (Propulsion) System Installation Process of the KCI-Retrofit train using the Lean Manufacturing : Analisis Pemborosan dalam Proses Pemasangan Sistem Underframe (Porpulsi) Kereta Api KCI-Retrofit Menggunakan Metode Lean Manufacturing Muhammad Fajar Ramadhani; Iswanto
Procedia of Engineering and Life Science Vol. 10 No. 1 (2026): Proceedings of the 9th Seminar Nasional Sains 2026
Publisher : Universitas Muhammadiyah Sidoarjo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21070/gs7vsc05

Abstract

General Background: The rail transportation sector plays a vital strategic role in mass mobility, logistics distribution, and economic growth. Specific Background: Fleet rehabilitation projects, such as the KCI-Retrofit commuter train program, require stringent dimensional accuracy and high-quality standards during underframe assembly. Knowledge Gap: Despite its importance, retrofit assembly lines frequently experience operational inefficiencies and severe workflow bottlenecks due to material degradation and integration challenges between legacy structures and new components. Aims: This study aims to identify and minimize critical manufacturing wastes within the underframe propulsion installation process using a comprehensive Lean Manufacturing framework. Results: The evaluation indicates that waiting, defects, and excessive motion constitute the primary operational wastes, driven by delayed material deliveries, component mismatches, uncoordinated design revisions, and suboptimal layouts. Novelty: This research introduces an integrated improvement methodology combining Value Stream Mapping, Seven Waste analysis, Fishbone diagnostics, 5S implementation, and Kaizen continuous improvement to optimize retrofit assembly line performance. Implications: The proposed interventions successfully streamline material flow, reduce non-value-added activities, and enhance overall productivity and assembly quality within the railway retrofit sector. Key Findings Highlights Waiting, defects, and motion represent the three most critical categories of waste affecting underframe propulsion assembly operations, Inefficiencies stem primarily from delayed component arrivals, uncoordinated design modifications, and improper workplace organization, The integrated application of 5S and Kaizen methods effectively optimizes process flows and enhances structural installation quality. Keywords Lean manufacturing, Underframe propulsion, Seven waste, 5S, Kaizen