General Background: The rail transportation sector plays a vital strategic role in mass mobility, logistics distribution, and economic growth. Specific Background: Fleet rehabilitation projects, such as the KCI-Retrofit commuter train program, require stringent dimensional accuracy and high-quality standards during underframe assembly. Knowledge Gap: Despite its importance, retrofit assembly lines frequently experience operational inefficiencies and severe workflow bottlenecks due to material degradation and integration challenges between legacy structures and new components. Aims: This study aims to identify and minimize critical manufacturing wastes within the underframe propulsion installation process using a comprehensive Lean Manufacturing framework. Results: The evaluation indicates that waiting, defects, and excessive motion constitute the primary operational wastes, driven by delayed material deliveries, component mismatches, uncoordinated design revisions, and suboptimal layouts. Novelty: This research introduces an integrated improvement methodology combining Value Stream Mapping, Seven Waste analysis, Fishbone diagnostics, 5S implementation, and Kaizen continuous improvement to optimize retrofit assembly line performance. Implications: The proposed interventions successfully streamline material flow, reduce non-value-added activities, and enhance overall productivity and assembly quality within the railway retrofit sector. Key Findings Highlights Waiting, defects, and motion represent the three most critical categories of waste affecting underframe propulsion assembly operations, Inefficiencies stem primarily from delayed component arrivals, uncoordinated design modifications, and improper workplace organization, The integrated application of 5S and Kaizen methods effectively optimizes process flows and enhances structural installation quality. Keywords Lean manufacturing, Underframe propulsion, Seven waste, 5S, Kaizen