Mohammad Nabil Makarim
Program Studi Teknik Industri, Fakultas Sains Dan Teknologi, Universitas Muhammadiyah Sidoarjo

Published : 3 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 3 Documents
Search

Scheduling Machine Maintenance at the Krembung Sugar Factory Using the Reliability Centered Maintenance Method: Penjadwalan Perawatan Mesin Pada Stasiun Dipabrik Gula Krembung Dengan Menggunakan Metode Reliability Centered Maintenance Mohammad Nabil Makarim; Tedjo Sukmono
Procedia of Engineering and Life Science Vol. 10 No. 1 (2026): Proceedings of the 9th Seminar Nasional Sains 2026
Publisher : Universitas Muhammadiyah Sidoarjo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21070/pels.v10i1.3104

Abstract

General Background Manufacturing continuity relies entirely on the structural integrity and operational readiness of critical machinery. Specific Background Sugar factories utilizing continuous operational models frequently face sudden mechanical breakdowns, resulting in severe production downtime and excessive emergency repair expenditures. Knowledge Gap Although unexpected mechanical failures severely disrupt production, many factories still lack a quantitatively determined, scheduled maintenance framework based on exact reliability metrics and historical failure intervals. Aims This study determines an optimal maintenance schedule for sugar processing machinery utilizing the Reliability-Centered Maintenance methodology. Results Analysis of 11 failure occurrences yielded a Mean Time to Repair of 0.5364 hours and a Mean Time Between Failure of 29.299 hours. The machinery's operational reliability dropped to 44.08 percent within a 24-hour cycle, despite maintaining a high availability rate of 98.20 percent. Stasiun Pemurnian and Stasiun Gilingan recorded the highest failure frequencies, primarily driven by bearing wear, continuous overloading, severe overheating, and oil contamination. Novelty This research directly translates specific component failure metrics and 24-hour cycle reliability limits into a highly structured, data-driven preventative maintenance timeline for sugar processing operations. Implications Executing a mandated preventative maintenance protocol every two days ensures components are serviced before reaching critical failure limits, substantially minimizing unplanned downtime and securing operational efficiency. Highlights: Unplanned mechanical breakdowns significantly disrupt continuous sugar processing operations, requiring structured maintenance interventions based on exact reliability metrics. Machinery analysis revealed a 29.299-hour Mean Time Between Failure and a 44.08 percent operational reliability limit during a standard 24-hour cycle. Mandating a strict preventative maintenance schedule every two days mitigates unexpected downtime and successfully addresses critical overheating and bearing failures. Keywords: Reliability Centered Maintenance, Mean Time Between Failure, Preventive Scheduling, Equipment Reliability, Operational Availability
Pikachu Modular Chair Factory Layout: Layout Pabrik Kursi Modular Pikachu Muhammad Rangga Eka Mukti; Mohammad Nabil Makarim; David Aditya Pratama; Satriya Surya Nugraha; Muhammad Angga Yudhistira; Atikha Sidhi Cahyana
Procedia of Engineering and Life Science Vol. 10 No. 1 (2026): Proceedings of the 9th Seminar Nasional Sains 2026
Publisher : Universitas Muhammadiyah Sidoarjo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21070/d35ckr44

Abstract

General Background: Facility layout optimization represents a foundational engineering strategy for manufacturing organizations seeking to streamline internal workflows and reduce operational bottlenecks. Specific Background: Manufacturing facilities frequently experience excessive material transfer distances and suboptimal departmental proximities that increase production costs. Knowledge Gap: Traditional initial factory floor designs often lack systematic integrations linking ergonomic workstation requirements with automated algorithmic layout generation tools. Aims: This study designs an efficient production facility layout for the manufacturing of a Pikachu-themed modular chair by considering ergonomic aspects, material flow, and activity relationships. Results: Utilizing the Multi Product Process Chart (MPPC), Activity Relationship Chart (ARC), From To Chart, and Blocplan method, the proposed layout successfully improves material flow, enhances interdepartmental relationships, and reduces material handling distance and costs. Novelty: This research establishes an applied design-based methodology integrating ergonomic anthropometric principles with MPPC, ARC, ARD, and Blocplan algorithms specifically for themed modular wooden furniture workshops. Implications: Implementing the optimized facility layout enables industrial managers to establish structured production workflows, improve material handling efficiency, and elevate overall manufacturing productivity. Key Findings Highlights Multi Product Process Chart analyses identify specific machine requirements, including 24 jigsaw units and 15 smoothing grinders, across the modular chair production workstations. From To Chart evaluations determine an initial total material transfer volume of 2,064 units with cumulative handling expenses reaching Rp3,257,660. Blocplan algorithmic generation identifies optimal layout configurations that position raw material warehouses close to measurement, cutting, and assembly areas. Keywords Facility Layout Design, Modular Chair, Material Handling, Blocplan, Ergonomics
Pikachu Modular Chair Factory Layout: Layout Pabrik Kursi Modular Pikachu Muhammad Rangga Eka Mukti; Mohammad Nabil Makarim; David Aditya Pratama; Satriya Surya Nugraha; Muhammad Angga Yudhistira; Athika Shidi Cahyana
Procedia of Engineering and Life Science Vol. 10 No. 1 (2026): Proceedings of the 9th Seminar Nasional Sains 2026
Publisher : Universitas Muhammadiyah Sidoarjo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21070/rzynvb30

Abstract

General Background The optimal layout design of a production facility remains crucial to ensuring smooth manufacturing operations and maintaining operational efficiency. Specific Background In the practical design of facilities for manufacturing a Pikachu-themed modular chair, integrating ergonomics, smooth material flow, and interdepartmental activity interactions is essential. Knowledge Gap Although traditional layout planning addresses material transport, comprehensive integration combining multi-product process charts, activity relationship analysis, from-to charts, and computerized heuristic algorithms like Blocplan requires systematic evaluation. Aims This study aims to design and optimize the production facility layout for manufacturing a modular chair by utilizing the Multi-Product Process Chart (MPPC), Activity Relationship Chart (ARC), Activity Relationship Diagram (ARD), From-To Chart (FTC), and Blocplan algorithm. Results The results indicate that the proposed layout significantly improves material flow, optimizes interdepartmental relationships, and minimizes material handling distances and costs by strategically positioning raw material warehouses near measurement, cutting, and assembly areas. Novelty A structured framework is established by synthesizing MPPC, ARC, FTC, and Blocplan computer-aided heuristics specifically for modular furniture manufacturing layouts. Implications Implementing this optimized layout effectively supports manufacturing efficiency, operational productivity, and workflow continuity in industrial facility design. Key Findings Highlights Integrating multi-product process mapping with activity relationship charts successfully reorganizes modular furniture production workflows. Computer-aided Blocplan optimization identifies superior layout alternatives that drastically reduce material handling costs and distances. Placing raw material warehouses adjacent to measurement and assembly departments eliminates unnecessary transportation bottlenecks. Keywords Facility layout design, Modular chair, Material handling, Blocplan, Ergonomics