Assembly Line Balancing Using Digital Twin Simulation for Reducing Cycle-Time Imbalance in Human-Centric Manufacturing Nensi Lapotulo; Irma Darmawati; Sitti Rachmawati Yahya; Makmur Harun
Journal of Industrial Engineering and Management Vol 2, No 1 (2024)
Publisher : Malikussaleh University, Aceh, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.52088/jaiem.v2i1.45

Abstract

Cycle-time variation can constrain the practical performance of human-centric assembly lines when individual workstations operate above or below the planning target. This study examines a digital-twin simulation workflow for assembly-line balancing using a time study of 24 task elements, pre-balance workstation records from eight stations, 20 algorithm scenarios, and 60 post-balance validation observations. The task elements total 769.3 s, and the pre-balance reference takt is 90.0 s. The mean observed station cycles range from 88.0 s at ST05 to 98.5 s at ST07, with ST03 also above the takt reference at 97.6 s. Across the simulation records, mean line efficiencies are 70.08% for manual balancing, 75.88% for ranked positional weight, 81.77% for COMSOAL, 86.33% for the genetic algorithm, and 92.25% for digital-twin simulation. The 60 validation observations have mean line efficiency of 94.06%, smoothness index of 4.42, daily output of 365.42 units, takt compliance of 97.57%, and work-in-process accumulation of 16.3 units. These findings are descriptive summaries of the supplied operating records, not causal estimates. The proposed workflow combines measured task data, scenario comparison, human review, and validation feedback to support transparent balancing decisions
Servitization of Industrial Machinery Suppliers: Pay-Per-Use Contracts and Customer Value in Indonesian Manufacturing Nurlaela Kumala Dewi; Makmur Harun; Johni S Pasaribu; Esterlina Esterlina
Journal of Industrial Engineering and Management Vol 4, No 1 (2026)
Publisher : Malikussaleh University, Aceh, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.52088/jaiem.v4i1.53

Abstract

Machinery suppliers increasingly offer machine hours instead of machine ownership, charging customers per running hour with a monthly minimum. The value of these pay-per-use contracts for Indonesian manufacturers depends on operating hours, minimum-payment constraints, and supplier-driven downtime reductions. This study compares ownership and pay-per-use costs over 36 months for 20 customers: 10 using industrial air compressors and 10 operating packaging lines. Monthly running hours are simulated and calibrated against published parameters where available. The results show that ownership is cheaper for all compressor users, generating savings of IDR 35.9–73.8 million per customer, whereas pay-per-use is cheaper for all packaging-line users, saving IDR 121.7–195.1 million. These differences are primarily explained by operating hours rather than machine type. Compressors operate between 4,676 and 5,223 hours, exceeding the 4,263-hour cost-equivalence threshold, while packaging lines operate between 2,759 and 3,485 hours, below their equivalent threshold of 4,643 hours. However, compressor ownership becomes less attractive when capital incurs an annual cost of 3.6–7.7%. The monthly minimum binds in 85 of 360 packaging-line months, yet the most affected customer still achieves substantial savings. Additional uptime generates estimated benefits of IDR 32.3–47.0 million per customer but does not change the preferred contracting option. These findings indicate that pay-per-use contracts can provide substantial economic advantages for packaging-line users with relatively low utilization. Nevertheless, suppliers can sustain higher contractual rates only when their maintenance capabilities reduce downtime sufficiently to outperform customer-managed ownership. The study highlights operating intensity, capital costs, minimum-payment provisions, and maintenance performance as critical determinants of machinery procurement decisions in Indonesian manufacturing