Sigit Prakoso
Universitas Pertahanan Republik Indonesia

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Dari Kerentanan ke Kemandirian Energi Alutsista: Analisis Kelayakan Waste-to-Energy dan Fragmentasi Kebijakan Energi Pertahanan Indonesia Sigit Prakoso; Novky Asmoro; Subur Wahono
PendIPA Journal of Science Education Vol 10 No 4 (2026): October - December
Publisher : UNIB Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33369/pendipa.10.4.1357-1364

Abstract

Indonesia's defense energy security is exposed to disruptions in liquid-fuel supply chains, while regulatory instruments for national energy management have not fully translated into operational priorities for essential civilian services and military missions. This study examines the institutional and regulatory gaps and assesses the preliminary technical feasibility of two Waste-to-Energy (WtE) pathways relevant to maritime defense: biodiesel blends potentially derived from used cooking oil (UCO) and pyrolysis-based recovery from oily sludge. A qualitative document analysis was conducted using Indonesian energy and defense regulations and peer-reviewed research on energy security, marine diesel fuels, and oily-sludge treatment. The findings indicate that Government Regulation No. 40/2025 and the existing National Energy General Plan (RUEN) provide a planning framework, but more explicit cross-sector procedures are needed for crisis fuel allocation and the integration of alternative fuels. International marine-engine experiments suggest that UCO-based B50 can be technically considered, although fuel consumption, material compatibility, and engine-specific tests remain critical. Pyrolysis offers oil-recovery potential but cannot be equated with ready-to-use naval fuel because product quality, hazardous residues, and safety require verification. The study proposes phased testing, auditable feedstock mapping, and coordinated regulations. Its conclusions are preliminary and do not constitute operational certification or project-level techno-economic feasibility.