Aplikasi EVM untuk Analisis Biaya, Jadwal, dan Deviasi Struktur Lantai 5 Rumah Sakit di Kota Padangsidimpuan Fathinah Muthiah Sari; Naomiyanty Marpaung; Riky Ananda; Ramadhan Saputra Simanjuntak; Edo Barlian; A. Daniel Anderson Munthe
JURNAL TECNOSCIENZA Vol. 11 No. 1 (2026): JURNAL TECNOSCIENZA
Publisher : JURNAL TECNOSCIENZA

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.51158/t6t4ga15

Abstract

 This study is aimed at analyzing the magnitude of financial deviation and time delays during the construction phase of the 5th-floor structural components of the Aufa Royhan Hospital development Project in Padangsidimpuan City. The project efficiency level is quantitatively assessed using the Earned Value Management (EVM) method. Based on the variance index evaluation results, rescheduling strategies and project deviation recovery are carried out through duration optimization using the Project Evaluation and Review Technique (PERT) approach. The evaluation results at week 71 indicate that the project performance is in an suboptimal condition, with physical progress reaching 52.62% compared to the planned target of 61.07%. The Schedule Performance Index (SPI) value of 0.862 indicates schedule delays, while the Cost Performance Index (CPI) value of 0.99 reflects a cost overrun with a financial deviation of -IDR 294,583,925.62. The To Complete Performance Index (TCPI) analysis yields a value of 1.011, indicating that a significant increase in productivity is required to achieve the budget target. Through the PERT approach, the main cause of deviation is identified as the high uncertainty in the duration of critical beam work activities, with the highest variance value of 4.3. The rescheduling scenario shows an inverse relationship between schedule acceleration and project cost, where efforts to shorten project duration to recover delays may significantly increase the total project cost. 
INOVASI GUDACELL (GRATING U-DITCH AND AQUACELL) SEBAGAI SISTEM DRAINASE TERINTEGRASI UNTUK MENDUKUNG PENGENDALIAN GENANGAN DI JALAN SULUH, KELURAHAN SIDOREJO HILIR, KECAMATAN MEDAN TEMBUNG, KOTA MEDAN Miranda Simbolon; Afriyani Siburian; Riky Ananda; Ribka Sebaut Matondang; Sri Wahyuni Amelia Simamora; Bella Yuspita Tambunan; Jeremia E.M. Simorangkir; Kemala Jeumpa; A. Daniel Anderson Munthe
Didaktik : Jurnal Ilmiah PGSD STKIP Subang Vol. 12 No. 4 (2026): Volume 12 No. 4, Desember 2026 Release
Publisher : STKIP Subang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36989/didaktik.v12i4.19647

Abstract

Urban inundation is often associated with limited drainage capacity, waste accumulation, sedimentation, and reduced infiltration areas. Field observations reported in the source document identified these issues along Jalan Suluh, Sidorejo Hilir, Medan Tembung, Medan, where inundation during heavy rainfall was reported to reach approximately 30–40 cm. This article describes GUDACELL (Grating U-Ditch AquaCell), a proposed local drainage-support system that integrates a waste-screening grating, a U-Ditch conveyance channel, and an AquaCell temporary storage unit. The study uses a descriptive design-development approach based on field observation, literature review, concept adaptation, and product planning. The proposed operating sequence is “screen, convey, store, and infiltrate”: the grating intercepts certain solid waste, the U-Ditch directs runoff, and the AquaCell temporarily stores water before infiltration or controlled discharge. The literature reviewed in the source document supports sustainable drainage approaches that combine conveyance, temporary storage, and infiltration rather than relying solely on conventional channels. However, the available material does not provide controlled prototype-test results or measured reductions in flood depth. Therefore, GUDACELL should be regarded as a proposed supporting innovation whose hydraulic capacity, infiltration performance, structural durability, and maintenance requirements need to be verified through further testing and site-specific design.