METODE PELAKSANAAN PEKERJAAN PONDASI PADA PROYEK PEMBANGUNAN KERTAJATI UMROH PARK MENGGUNAKAN PONDASI TIANG PANCANG DAN PILE CAP Reci Tiana Reta; Arief Rijaluddin
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 10 (2026)
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The Kertajati Umroh Park Development Project is one of the strategic infrastructure developments in Majalengka Regency that supports religious tourism and educational activities. The Masjidil Haram building within the project utilizes a deep foundation system consisting of driven piles and pile caps due to the site's soil conditions. This study aims to describe the implementation method of driven pile and pile cap construction, identify the equipment and materials used, and evaluate technical constraints encountered during construction. The research employed a descriptive method through direct field observation, interviews with project personnel, documentation, and literature review. The results indicate that the foundation system used precast reinforced concrete square piles measuring 25 × 25 cm with lengths of 3 m and 6 m, installed using a diesel hammer. The pile cap construction involved excavation, pile head trimming, lean concrete placement, reinforcement installation, formwork, concrete casting, and curing. Several technical challenges were encountered, including waterlogged soil conditions, weather effects, and differences between planned and actual pile depths caused by variations in subsurface soil conditions. Overall, the implementation method complied with technical procedures and successfully supported the structural requirements of the project.