METODE PELAKSANAAN PEKERJAAN STRUKTUR BAJA PADA ELEMEN BALOK DAN KOLOM SERTA PENGENDALIAN MUTU PADA PROYEK PEMBANGUNAN GEDUNG PUSKESMAS GUNUNGSARI CIREBON Rini Nurhasanah; Arief Rijaluddin
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 10 (2026)
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The construction of the Gunungsari Public Health Center (Puskesmas) in Cirebon City represents the local government's effort to improve the quality and accessibility of public healthcare services through the development of safe and reliable facilities. The building utilizes a steel structural system for its columns and beams, requiring appropriate construction methods and quality control to ensure structural strength, stability, and safety. This study aimed to investigate the implementation methods and quality control procedures for steel structure works on column and beam elements during fabrication and field installation. Data were collected through direct field observations, reviews of technical documents, including shop drawings and technical specifications, and interviews with project contractors and supervisors. The collected data were analyzed descriptively to explain the construction process and quality control system. The results indicate that the steel structure work was carried out systematically, covering preparation, fabrication, anti-corrosion coating, material transportation, erection using a mobile crane, installation of high-strength bolted and welded connections, inspection, and finishing. The structural material used was BJ 37 steel, supported by SNI certification and mill certificates. Overall, the construction methods and quality control procedures were implemented according to the project plan, contributing to the reliability, quality, and safety of the completed building structure.
METODE PELAKSANAAN PEKERJAAN PONDASI PADA PROYEK PEMBANGUNAN KERTAJATI UMROH PARK MENGGUNAKAN PONDASI TIANG PANCANG DAN PILE CAP Reci Tiana Reta; Arief Rijaluddin
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 10 (2026)
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The Kertajati Umroh Park Development Project is one of the strategic infrastructure developments in Majalengka Regency that supports religious tourism and educational activities. The Masjidil Haram building within the project utilizes a deep foundation system consisting of driven piles and pile caps due to the site's soil conditions. This study aims to describe the implementation method of driven pile and pile cap construction, identify the equipment and materials used, and evaluate technical constraints encountered during construction. The research employed a descriptive method through direct field observation, interviews with project personnel, documentation, and literature review. The results indicate that the foundation system used precast reinforced concrete square piles measuring 25 × 25 cm with lengths of 3 m and 6 m, installed using a diesel hammer. The pile cap construction involved excavation, pile head trimming, lean concrete placement, reinforcement installation, formwork, concrete casting, and curing. Several technical challenges were encountered, including waterlogged soil conditions, weather effects, and differences between planned and actual pile depths caused by variations in subsurface soil conditions. Overall, the implementation method complied with technical procedures and successfully supported the structural requirements of the project.
METODE PELAKSANAAN PEKERJAAN SISTEM AIR KOTOR DAN IPAL (STUDI KASUS : PROYEK PEMBANGUNAN GEDUNG PUSKESMAS GUNUNGSARI, CIREBON) Ghaida Tsauraya Nur Fatimah; Arief Rijaluddin
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 10 (2026)
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The installation of wastewater and Wastewater Treatment Plant (WTP) systems is essential in the construction of healthcare facilities because it ensures the safe collection, treatment, and disposal of liquid waste while preventing environmental pollution and protecting public health. This study aims to describe the implementation method of the wastewater and WTP systems, explain the stages of wastewater flow, and identify the maintenance procedures applied in the Gunungsari Community Health Center Building project. The practical work was conducted at the project located on Jl. Tentara Pelajar No. 75, Pekiringan Village, Kesambi District, Cirebon City. The building consists of three floors with a total height of approximately 12 meters and a floor area of 1,378.8 m². The implementation method includes project preparation, measurement and excavation, pipeline layout marking, installation of AW-type PVC pipes, system inspection and testing, and finishing work. The wastewater disposal system consists of drainage pipelines, inspection chambers, control tanks, septic tanks, WTP units, final discharge, and routine maintenance. The installation follows SNI 03-7065-2005 plumbing standards, including the use of 4-inch pipes with slopes of 2–3% for black water and 3-inch pipes with slopes of 1–2% for wastewater, ensuring efficient flow, reliable treatment, and sustainable sanitation performance.
ANALISA MANAJEMEN PENGAWASAN DAN PENGENDALIAN PEKERJAAN STRUKTUR BAWAH PADA PROYEK PEMBANGUNAN KERTAJATI UMROH PARK Adhitya Akta Permana; Arief Rijaluddin
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 10 (2026)
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Construction supervision and control are essential to ensuring project quality and schedule performance. This study aims to analyze the implementation of supervision and quality control in the substructure works of the Kios Bazar Building at the Kertajati Umroh Park Project and evaluate schedule performance using Earned Value Analysis (EVA). A mixed-methods approach was employed through field observations, project documentation, interviews, and analysis based on SNI 2847:2019, project specifications, and shop drawings. Schedule performance was assessed using Planned Value (PV), Earned Value (EV), Schedule Variance (SV), and Schedule Performance Index (SPI). The results indicate several supervision gaps, including the absence of a Supervision Consultant, Site Engineer, Quality Control (QC) personnel, and Safety Officer. Quality control deficiencies included the absence of slump tests, trial mixes, and a Bar Bending Schedule (BBS), reinforcement bars stored directly on the ground, and potential cold joints due to three-day site-mixed concrete casting. EVA analysis showed the lowest SPI value of 0.53 in Week 24, mainly caused by manual excavation, delayed labor mobilization, and late reinforcement delivery. Project acceleration increased the SPI to 1.00 in Week 33, indicating completion according to the final project schedule.