METODE PELAKSANAAN PENGERJAAN BANGUNAN HEADPOND PADA BENDUNGAN PEMBANGKIT LISTRIK TENAGA MINIHIDRO Rivaldo Pianissimo; Yayat Hendrayana
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 10 (2026)
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The Mini Hydro Power Plant (PLTM) is a renewable energy source that utilizes the potential of water flow to generate electrical energy in an environmentally friendly manner. One of the important components in the PLTM system is the headpond, which functions as a calming pond to stabilize the discharge and pressure of the water flow before it is channeled to the penstock to the turbine. This internship report aims to determine the method of implementing the headpond construction work on the Talaga Mini Hydro Power Plant (PLTM) Project, Majalengka Regency, as well as identifying equipment, materials, and obstacles encountered during construction. The method used in compiling this report is a descriptive method with primary data collection through field observations, interviews, and documentation during the implementation of the internship, as well as secondary data in the form of working drawings, technical specifications, and project documents. The analysis is carried out by describing the stages of work implementation based on actual conditions in the field. The results of the internship show that the method of implementing the headpond work is carried out systematically, starting from preparation work, measurement, excavation, fabrication and installation of reinforcement, installation of formwork, to concrete casting using ready-mix concrete of K-225 quality. The main equipment used includes a total station, waterpass, excavator, bar cutter, bar bending, concrete mixer truck, vibrator, and other supporting equipment. The main materials used consist of BjTS 420 reinforcing steel, ready-mix concrete, multiplex wood, steel wire, and cement. During the implementation of the work there were several obstacles, including high rainfall, flooding due to river overflows, as well as landslides and landslides that caused work delays. Based on the observation results, it can be concluded that the headpond work implementation method on the Talaga PLTM Project has been carried out according to the planned construction stages with the application of work methods, use of equipment, and materials that meet standards. The existence of the headpond plays an important role in maintaining the stability of water flow thereby supporting the efficiency and reliability of PLTM operations.