Claim Missing Document
Check
Articles

Found 4 Documents
Search

ANALISIS METODE PELAKSANAAN PEKERJAAN DAN DEBIT BANJIR RENCANA DINDING BENDUNG PROYEK PLTM TALAGA Renaldi Agustian; Yayat Hendrayana
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 10 (2026)
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

This Practical Work Report discusses the construction method of the weir’s right wing wall and the analysis of planned flood discharge at the Talaga Mini-Hydro Power Plant (PLTM) project with a capacity of 2x1 MW in Majalengka Regency, utilizing the Cilutung River flow. The objective is to understand the technical implementation of the weir wall construction and to calculate the safe flood wall height based on the planned flood discharge. Data collection methods included field observations, interviews, and secondary data analysis. The construction implementation stages covered preparation, earth excavation, and reinforced concrete structure works, including rebar fabrication, formwork installation, concreting using K-225 concrete, and curing. For hydrological analysis, flood discharge calculations were performed using various empirical methods, with the HSS Snyder method selected as the most suitable for the watershed area of 124.09 km². The analysis results indicate that the planned flood discharge for a 100-year return period (Q100) is 370 m³/s. Based on this calculation, the recommended weir flood wall height is set at elevation +490.50 masl, or 4.34 meters from the weir crest, to ensure operational safety against flood risks.
METODE PELAKSANAAN PEMASANGAN PCI GIRDER PADA JEMBATAN COLLECTOR ROW-15 KOTA BARU PARAHYANGAN Manu Imarwan; Yayat Hendrayana
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 10 (2026)
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

This paper discusses the implementation of Prestressed Concrete I-Girder (PCI Girder) installation on the Collector ROW-15 Bridge project in Kota Baru Parahyangan, West Bandung Regency. The bridge was developed to support connectivity within the growing residential area, with PCI Girder selected as the superstructure due to its high strength, consistent precast quality, and efficient installation process. This study aims to describe the installation stages, identify technical and non-technical factors influencing the work, and evaluate the effectiveness of the applied method in terms of quality, time, and safety. The research employed a field study combined with a literature review through direct observation, documentation, and interviews with the site engineer and contractor personnel. The installation process included truss launcher assembly, girder lifting using a mobile crane, manual launching across the truss launcher, and final placement on the bearing pad at the abutment. The findings indicate that the PCI Girder was installed according to the planned alignment and elevation without significant deviation. The main challenges consisted of adverse weather conditions and vegetation around the construction site, both of which were successfully managed without affecting the project schedule. Overall, the applied installation method proved effective in ensuring construction quality, schedule performance, and work safety, making it suitable for bridge projects with similar characteristics
METODE PELAKSANAAN PENGERJAAN BANGUNAN HEADPOND PADA BENDUNGAN PEMBANGKIT LISTRIK TENAGA MINIHIDRO Rivaldo Pianissimo; Yayat Hendrayana
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 10 (2026)
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The Mini Hydro Power Plant (PLTM) is a renewable energy source that utilizes the potential of water flow to generate electrical energy in an environmentally friendly manner. One of the important components in the PLTM system is the headpond, which functions as a calming pond to stabilize the discharge and pressure of the water flow before it is channeled to the penstock to the turbine. This internship report aims to determine the method of implementing the headpond construction work on the Talaga Mini Hydro Power Plant (PLTM) Project, Majalengka Regency, as well as identifying equipment, materials, and obstacles encountered during construction. The method used in compiling this report is a descriptive method with primary data collection through field observations, interviews, and documentation during the implementation of the internship, as well as secondary data in the form of working drawings, technical specifications, and project documents. The analysis is carried out by describing the stages of work implementation based on actual conditions in the field. The results of the internship show that the method of implementing the headpond work is carried out systematically, starting from preparation work, measurement, excavation, fabrication and installation of reinforcement, installation of formwork, to concrete casting using ready-mix concrete of K-225 quality. The main equipment used includes a total station, waterpass, excavator, bar cutter, bar bending, concrete mixer truck, vibrator, and other supporting equipment. The main materials used consist of BjTS 420 reinforcing steel, ready-mix concrete, multiplex wood, steel wire, and cement. During the implementation of the work there were several obstacles, including high rainfall, flooding due to river overflows, as well as landslides and landslides that caused work delays. Based on the observation results, it can be concluded that the headpond work implementation method on the Talaga PLTM Project has been carried out according to the planned construction stages with the application of work methods, use of equipment, and materials that meet standards. The existence of the headpond plays an important role in maintaining the stability of water flow thereby supporting the efficiency and reliability of PLTM operations.
PELAKSANAAN PEKERJAAN PENGECORAN BOX GIRDER SEGMENTAL PADA METODE BALANCE CANTILEVER MENGGUNAKAN FORMWORK TRAVELLER (STUDI KASUS: JEMBATAN JUNGCTION SEDYATMO TOL KATARAJA DIVISI INFRASTRUKTUR 1, SEKSI 1) M. Nanda Fajar Arij Rachman; Yayat Hendrayana
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 10 (2026)
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Practical Work is an academic activity designed to provide students with experience in applying theoretical knowledge to actual construction practices. This Practical Work was conducted at the Kataraja Toll Road Project, Infrastructure Division 1, Section 1, focusing on the implementation of segmental box girder casting at the Sedyatmo Junction Bridge. The construction employed the balance cantilever method supported by a formwork traveller, which enables segmental casting to be carried out progressively and symmetrically without using scaffolding beneath the bridge span. The objectives of this Practical Work were to understand the implementation stages of segmental box girder casting, the application of the balance cantilever method, and the use of the formwork traveller as the primary construction equipment. Data were collected through direct field observations, interviews, technical discussions with project personnel, documentation, and literature studies. The observed construction stages included traveller setting, reinforcement installation, tendon duct and anchorage installation, formwork installation, pre-casting inspection, cast-in-situ concrete placement, curing, tendon stressing, and traveller launching to the subsequent segment. The results indicate that the balance cantilever method using a formwork traveller supports systematic construction activities, maintains structural balance during casting, and contributes to geometric accuracy and construction quality.