Lailatul Syifa Tanjung
Industrial Engineering Study Program, Faculty of Engineering, Universitas Pahlawan Tuanku Tambusai

Published : 3 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 3 Documents
Search

Analysis of Waste Transportation Needs for Service Optimization in Bangkinang City District Bisma Alfian Mardani; Hanantatur Adeswastoto; Lailatul Syifa Tanjung
Journal of Engineering Science and Technology Management (JES-TM) Vol. 5 No. 2 (2025): September-March 2025
Publisher : Journal of Engineering Science and Technology Management

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jestm.v5i2.332

Abstract

Waste transportation is a waste sub-system that aims to bring waste from the location of the transfer of the waste source directly to the Final Disposal Site (TPA). The purpose of this study is to find out the transportation system and waste collection patterns, analyze the transportation needs of waste transportation, and analyze the transportation needs of waste transportation in 2025. The methods used to analyze the transportation needs of waste transportation are the Hauled Container System (HCS) and Stationary Container System (SCS) methods. The data used are regional topographic data, the number of waste transportation equipment, the travel time of waste transportation, and the number of residents in Bangkinang Kota District. The need for garbage carts/pedicabs in 2023 is 61 units and garbage transport vehicles needed for a waste volume of 4.105 tons/day from the Temporary Disposal Site (TPS) to the Final Disposal Site (TPA) consisting of 10 units of tipper trucks measuring 6m³ for 1 trip/day and 1 unit of armroll truck measuring 6m³ with 10 container tubs for 1 trip/day. The need for garbage carts/pedicabs in 2025 is 65 units and garbage transport vehicles in 2025 with a predicted waste volume of 4.105 tons/day is 10 units of tipper trucks measuring 6m³ for 1 ration/day and 1 unit of armroll truck measuring 6m³ for 1 ration/day with 10 container tubs.
Analysis of Causative Factors of Delayed Project Completion (Case Study of Norfa Husada Mother and Child Hospital) Gerry Thoriq; Beny Setiawan; Lailatul Syifa Tanjung
Journal of Engineering Science and Technology Management (JES-TM) Vol. 6 No. 1 (2026): March-May 2026
Publisher : Journal of Engineering Science and Technology Management

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jestm.v6i1.352

Abstract

Construction project delay is a condition where the execution of work does not proceed according to the agreed schedule. The construction project of Norfa Husada Mother and Child Hospital experienced delays impacting costs and operational time. This study aims to identify the factors causing delays, determine the most dominant factors, and formulate preventive measures. The method used was a questionnaire distribution to 30 respondents directly involved in the project, including contractors, consultants, and project owners. Data were analyzed using descriptive statistics (Mean Rank) with SPSS software. The results show that the Planning Factor is the most dominant cause, specifically due to design changes (redesign) and changes in the scope of work, with a mean value of 1.97. The second dominant factor is the Execution Factor, particularly regarding poor work sequence planning, with a mean value of 1.90. Based on these results, the main strategies to prevent delays include maturing the design planning before construction begins, strengthening coordination between the owner and contractor regarding scope changes, and establishing a more structured method of execution (SOP) in the field.
Solid Waste Management System Analysis (Case Study Bangkinang City Subdistrict) Wilki Andrian; Hanantatur Adeswastoto; Lailatul Syifa Tanjung
Journal of Engineering Science and Technology Management (JES-TM) Vol. 6 No. 1 (2026): March-May 2026
Publisher : Journal of Engineering Science and Technology Management

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jestm.v6i1.356

Abstract

Waste management is a crucial issue in sustainable development, particularly in areas with high population growth and economic activity. This study aims to evaluate the waste management system in Bangkinang Kota District, Kampar Regency, which faces various challenges, including inadequate infrastructure, low public awareness, and a suboptimal management system. The research method used is a Mixed Method approach, combining quantitative and qualitative data collection techniques simultaneously in one study. The results indicate that the waste management system in Bangkinang Kota is still not effectively integrated, particularly in operational techniques, community participation, and institutional aspects. The lack of storage facilities, unscheduled transportation, and the habit of littering are the main challenges. Recommendations from this study include improving waste infrastructure, providing ongoing community education, and strengthening regulations and coordination between relevant parties to create a sustainable and community-based waste management system.