Claim Missing Document
Check
Articles

Found 7 Documents
Search

Study of the Characteristics of Cellular Lightweight Concrete (CLC) Bricks Using (Palm Kernel Shell) Ash as a Comment Additive Septri Naldi; Beny Setiawan; Resy Kumala Sari
Journal of Engineering Science and Technology Management (JES-TM) Vol. 6 No. 1 (2026): March-May 2026
Publisher : Journal of Engineering Science and Technology Management

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jestm.v6i1.338

Abstract

Riau Province is one of Indonesia’s largest palm oil–producing regions, generating substantial biomass waste such as palm kernel shells. One potential use of this waste is Palm Kernel Shell Ash (PKS-Ash), which contains silica (SiO₂) and alumina (Al₂O₃) that are beneficial for cementitious reactions. This study aims to evaluate the effect of PKS-Ash as a cement additive on the properties of Cellular Lightweight Concrete (CLC) bricks, particularly unit weight, water absorption, and compressive strength. A laboratory-scale experimental method was applied. The test specimens were produced using cement, sand, water, a foaming agent, and PKS-Ash with variations of 0%, 4%, 6%, and 8% by weight of cement. All specimens were tested at curing ages of 7, 14, 21, and 28 days in accordance with SNI 8640-2018. The results at 28 days showed that the addition of PKS-Ash significantly influenced the characteristics of the CLC bricks. Compressive strength increased with higher PKS-Ash content, reaching a maximum value of 1.775 MPa at the 8% variation, compared to 0.975 MPa for the control mixture. The unit weight of the specimens ranged from 1,304.29 kg/m³ to 1,716.44 kg/m³. Water absorption values varied, with the lowest absorption observed in the 0% mixture and the highest in the 4% mixture. The study concludes that PKS-Ash has strong potential as a sustainable additive to improve the compressive strength of CLC lightweight bricks while promoting effective utilization of palm oil industry waste.
Analysis of Causative Factors of Delayed Project Completion (Case Study of Norfa Husada Mother and Child Hospital) Gerry Thoriq; Beny Setiawan; Lailatul Syifa Tanjung
Journal of Engineering Science and Technology Management (JES-TM) Vol. 6 No. 1 (2026): March-May 2026
Publisher : Journal of Engineering Science and Technology Management

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jestm.v6i1.352

Abstract

Construction project delay is a condition where the execution of work does not proceed according to the agreed schedule. The construction project of Norfa Husada Mother and Child Hospital experienced delays impacting costs and operational time. This study aims to identify the factors causing delays, determine the most dominant factors, and formulate preventive measures. The method used was a questionnaire distribution to 30 respondents directly involved in the project, including contractors, consultants, and project owners. Data were analyzed using descriptive statistics (Mean Rank) with SPSS software. The results show that the Planning Factor is the most dominant cause, specifically due to design changes (redesign) and changes in the scope of work, with a mean value of 1.97. The second dominant factor is the Execution Factor, particularly regarding poor work sequence planning, with a mean value of 1.90. Based on these results, the main strategies to prevent delays include maturing the design planning before construction begins, strengthening coordination between the owner and contractor regarding scope changes, and establishing a more structured method of execution (SOP) in the field.
Characteristics Study of Parking Land of Kuok Public Health Center Hasbi Hasadiqi; Beny Setiawan; Emon Azriadi
Journal of Engineering Science and Technology Management (JES-TM) Vol. 6 No. 1 (2026): March-May 2026
Publisher : Journal of Engineering Science and Technology Management

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jestm.v6i1.354

Abstract

This study aims to determine the characteristics and parking space requirements at the Puskesmas Kuok, located in Kuok District, Kampar Regency. Puskesmas Kuok serves as the main healthcare facility in the area and has experienced a steady increase in visitors each year, making the need for adequate parking facilities increasingly important. The research method used was a field survey, with primary data collected through direct observation of the number of vehicles entering and exiting, parking duration, and vehicle types. Secondary data were obtained from the health center, including information on the number of employees, visitors, and the layout of the parking area. The analysis results showed that the highest parking volume occurred on Monday, with 80 motorcycles and 15 cars. The average parking duration was 2.15 hours for motorcycles and 5.12 hours for cars. The highest parking index reached 90% for motorcycles and 93% for cars, indicating that the parking capacity was frequently exceeded, especially during peak hours. This condition caused disorganized parking and reduced visitor comfort. Based on the research findings, it is recommended that the health center reorganize the parking area by providing marked Standard Parking Spaces and consider expanding the parking area to improve efficiency and user convenience.
Structural Safety Analysis of Pahlawan University Apartment Building Pastabiqul Khoiri; Beny Setiawan; R. Joko Musridho
Journal of Engineering Science and Technology Management (JES-TM) Vol. 6 No. 1 (2026): March-May 2026
Publisher : Journal of Engineering Science and Technology Management

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jestm.v6i1.358

Abstract

The Rusunawa Putri Building at Universitas Pahlawan serves as a student residence operating 24 hours a day, providing essential accommodation facilities. Current physical conditions show several damages, including wall cracks, water seepage, damaged doors, and ceiling deterioration. This study aims to identify the factors influencing building reliability and to assess the reliability level of the Rusunawa Putri Building. A descriptive quantitative and qualitative method was applied, involving field observations, interviews, and questionnaires distributed to 28 residents. The assessment refers to the Ministry of Public Works Regulation No.29/PRT/M/2006, which includes five aspects: architecture, structure, utilities and fire protection, accessibility, and building and environmental layout. The findings show reliability values of 75% for architecture, 78% for structure, 82% for utilities and fire protection, 76% for accessibility, and 76% for building and environmental layout. Overall, the building achieved a reliability score of 82%, which falls into the less reliable category (75–<95%). This study recommends periodic maintenance and the provision of essential components such as hydrants, sprinklers, evacuation facilities, and disability-accessible amenities to improve building safety and reliability
Design and Development of a Web-Based Financial Management Information System for a Wedding Organizer (Case Study: Novita Wedding Bangkinang) Khairunnisa; Safni Marwa; Beny setiawan; Nur Akma Azua binti Rosnan
Journal of Engineering Science and Technology Management (JES-TM) Vol. 6 No. 3 (2026): September-November 2026
Publisher : Journal of Engineering Science and Technology Management

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jestm.v6i3.483

Abstract

Novita Wedding Bangkinang is a wedding organizer business that provides various wedding services, including wedding packages and event management. Its financial management process, including recording customer data, income, expenses, and financial reports, is still conducted manually using notebooks. This condition causes several problems, such as recording errors, data duplication, difficulty in searching transaction information, and delays in preparing financial reports. This research aims to design and develop a web-based financial management information system for Novita Wedding Bangkinang. The system was developed using the FAST (Framework for the Application of System Thinking) method and implemented using Laravel 10 with MySQL as the database. The system provides features for managing customer data, wedding packages, income, expenses, division assignments, cash balances, and financial reports in an integrated system. System testing was conducted using functional testing, non-functional testing, and User Acceptance Testing (UAT). The test results show that the system functions according to the identified requirements and is accepted by the users. The developed system can support more structured, computerized, and efficient financial management processes at Novita Wedding Bangkinang.
Evaluation of Drainage Systems Based on River Basins (Case Study: The Intersection of Jalan Jenderal Sudirman and Jalan D.I. Panjaitan) Tasya; Beny Setiawan; Agus Alisa Putra
Journal of Engineering Science and Technology Management (JES-TM) Vol. 6 No. 3 (2026): September-November 2026
Publisher : Journal of Engineering Science and Technology Management

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jestm.v6i3.485

Abstract

This study evaluates the drainage system at the intersection of D.I. Panjaitan Street and Jendral Sudirman Street in Bangkinang Kota District, Kampar Regency, Riau Province. The area frequently experiences waterlogging and flooding during periods of high rainfall intensity, which are suspected to be caused by sedimentation, channel blockages, and land-use changes that increase surface runoff. A quantitative descriptive method was employed through field surveys, drainage channel measurements, community interviews, and hydrological and hydraulic analyses. The data used consisted of 10 years of rainfall records from the Silam Rainfall Station and existing drainage channel data. Rainfall frequency analysis was carried out using the Normal, Gumbel, and Log Pearson Type III distributions, while the design discharge was calculated using the Rational Method. The capacity of the existing drainage channels was analyzed using Manning’s equation. The results indicate that the existing drainage system experiences several problems, including sediment accumulation, waste blockages, and structural deterioration in certain channel sections, which hinder water flow. The analysis shows that the total existing channel capacity is 66.68 m³/s, while the total design discharge is 47.77 m³/s, indicating that the drainage system is generally capable of conveying the runoff. However, one of the eight analyzed channels does not meet the required design discharge capacity and therefore requires improvement. This study provides recommendations for channel normalization, routine cleaning, and periodic maintenance to enhance drainage performance and reduce the risk of flooding in the study area.
Evaluation of The Drainage System at The University of Pahlawan Tuanku Tambusai Based on An Analysis of The Rainfall Catchment Area Amelia Yusnita; Beny Setiawan; Aris Fiatno
Journal of Engineering Science and Technology Management (JES-TM) Vol. 6 No. 3 (2026): September-November 2026
Publisher : Journal of Engineering Science and Technology Management

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jestm.v6i3.486

Abstract

Infrastructure development at the Universitas Pahlawan campus has led to land-use changes that potentially increase surface runoff and affect the performance of the drainage network. This study aims to analyze catchment area characteristics, calculate design runoff discharge, and evaluate the capacity of the existing drainage network by comparing design runoff discharge with channel capacity. A quantitative descriptive method was employed, utilizing hydrological and hydraulic analysis approaches. Data sources included 10 years of rainfall data from the Silam Station, topographic data and field observations, Rainfall analysis was conducted using probability distributions; runoff discharge was calculated using the Rational Method, and channel capacity was analyzed using Manning's Equation. The results indicate that the Universitas Pahlawan campus area is divided into four catchment zones (A1, A2, A3, and A4) with a total area of 4,27 hectares. Frequency analysis identified the Log Pearson III distribution as the best fit, yielding a design rainfall of 150.31 mm for a 10 year return period. Of the 12 channels evaluated, all channels were individually capable of accommodating the design runoff discharge; however, overtopping was identified in Channel 10, as this channel is located at the confluence of four flows from Zones A1 to A4 that converge at the same outlet point, causing the discharge from the four upstream channels to concentrate simultaneously and exceed the channel's holding capacity. This study provides information on the performance of the campus drainage system and serves as a basis for considering capacity improvements and regular channel maintenance.