Claim Missing Document
Check
Articles

Found 1 Documents
Search

Analisis Kecepatan Aliran dan Waktu Konsentrasi pada Evaluasi Kapasitas Saluran Drainase U-Ditch di Ruas Jalan Petir–Serang (Sempu–Boru) M. Ichwanul; Telly Rosdiyani; Ibnu ghatan Nawawi; Ma'ulfi Kharis Abadi
Journal of Sustainable Civil Engineering (JOSCE) Vol. 8 No. 02 (2026): JOSCE: Journal of Sustainable Civil Engineering
Publisher : LPPM

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47080/josce.v8i02.5025

Abstract

This study evaluates the hydrological characteristics and hydraulic conveyance capacity of the existing U-Ditch drainage system along the Petir–Serang Road (Sempu–Boru section), Serang, Banten. The analysis focuses on design rainfall estimation, peak runoff discharge, and the adequacy of the existing drainage channel. Daily maximum rainfall data from 2016 to 2025 were analyzed using probability distribution methods, with the Gumbel distribution selected based on statistical parameter assessment. Peak runoff discharge was subsequently estimated using the Rational Method, while the channel conveyance capacity was calculated using Manning’s equation. The results indicate that the estimated design rainfall reaches 426.880 mm for a 10-year return period and 720.316 mm for a 100-year return period. The corresponding peak discharges for the 10-year return period are 1.645 m³/s on the right side and 1.725 m³/s on the left side of the road, increasing to 2.775 m³/s and 2.911 m³/s, respectively, for the 100-year return period. The existing U-Ditch channel, with a base width of 0.80 m and a total height of 1.00 m, has an estimated theoretical conveyance capacity of 1.990 m³/s, with a calculated flow velocity of 3.11 m/s. The comparison shows that the channel capacity theoretically accommodates the estimated 10-year design discharge on both sides. However, the estimated discharges for the 25-year return period and higher exceed the channel capacity. These findings indicate that the existing drainage system has limited capacity under more extreme rainfall scenarios. Periodic maintenance and further hydraulic assessment are therefore necessary to support reliable drainage performance and inform potential channel capacity improvements.