Leonardo Geovanni
Institut Teknologi Sepuluh Nopember

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Valuation of The Cable Harness TPM Program on The HASS Burn-In Chamber Machine to Improve MAU Module Productivity in An Aerospace Manufacturing Company Leonardo Geovanni; Mokh. Suef
Jurnal Teknik Indonesia Vol. 5 No. 4 (2026): Jurnal Teknik Indonesia
Publisher : Publica Scientific Solution

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.58860/jti.v5i4.990

Abstract

Cable harness degradation during aerospace environmental testing can cause false failures, repeated testing, and hidden productivity losses. This study evaluated cable harness maintenance in highly accelerated stress screening (HASS) chambers and developed total productive maintenance (TPM) recommendations to improve avionics module testing productivity. A case study examined three years of operational records from five chambers, supplemented by field observations, maintenance documentation, and technician questionnaires. The analysis combined overall equipment effectiveness (OEE), adjusted using first-pass yield (FPY), with reliability indicators, Pareto analysis, fishbone diagrams, and cost of poor quality (COPQ) calculations. The actual OEE was 77.05%, compared with the internally reported value of 94%, revealing substantial productivity losses obscured by retesting practices. The first-pass yield was 91.01%. Cable failures had a mean time between failures (MTBF) of 236.81 hours and a mean time to repair (MTTR) of 9.09 hours. False failures affected 592 modules, consumed 2,368 machine hours, and generated total costs of IDR 2,356,160,000. Connector degradation, restricted workspace, and installation time pressure contributed to maintenance and setup difficulties. These findings supported recommendations that integrated autonomous inspection, planned cable replacement every eight operating days, and visual installation aids. The study concluded that reliability-informed TPM and first-pass performance measurement could support productivity improvements, although the proposed interventions require implementation and validation.