Valuation of The Cable Harness TPM Program on The HASS Burn-In Chamber Machine to Improve MAU Module Productivity in An Aerospace Manufacturing Company Leonardo Geovanni; Mokh. Suef
Jurnal Teknik Indonesia Vol. 5 No. 4 (2026): Jurnal Teknik Indonesia
Publisher : Publica Scientific Solution

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.58860/jti.v5i4.990

Abstract

Cable harness degradation during aerospace environmental testing can cause false failures, repeated testing, and hidden productivity losses. This study evaluated cable harness maintenance in highly accelerated stress screening (HASS) chambers and developed total productive maintenance (TPM) recommendations to improve avionics module testing productivity. A case study examined three years of operational records from five chambers, supplemented by field observations, maintenance documentation, and technician questionnaires. The analysis combined overall equipment effectiveness (OEE), adjusted using first-pass yield (FPY), with reliability indicators, Pareto analysis, fishbone diagrams, and cost of poor quality (COPQ) calculations. The actual OEE was 77.05%, compared with the internally reported value of 94%, revealing substantial productivity losses obscured by retesting practices. The first-pass yield was 91.01%. Cable failures had a mean time between failures (MTBF) of 236.81 hours and a mean time to repair (MTTR) of 9.09 hours. False failures affected 592 modules, consumed 2,368 machine hours, and generated total costs of IDR 2,356,160,000. Connector degradation, restricted workspace, and installation time pressure contributed to maintenance and setup difficulties. These findings supported recommendations that integrated autonomous inspection, planned cable replacement every eight operating days, and visual installation aids. The study concluded that reliability-informed TPM and first-pass performance measurement could support productivity improvements, although the proposed interventions require implementation and validation.
Perancangan Ulang (Redesign) Sistem Pengendalian Persediaan dan Notifikasi di Instalasi Farmasi Rumah Sakit Krakatau Medika Hilda Yunita Indriani; Mokh. Suef
Jurnal Impresi Indonesia Vol. 5 No. 8 (2026): Jurnal Impresi Indonesia
Publisher : Riviera Publishing

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.58344/jii.v5i8.8009

Abstract

Kekosongan stok obat di Instalasi Farmasi Rumah Sakit Krakatau Medika (RSKM) terjadi berulang dan berdampak langsung pada pasien: selama Januari–April 2025 tercatat 56 transaksi Emergency Purchase Order (EPO) dengan biaya 15–30% lebih mahal dari jalur reguler, serta 478 kejadian copy resep, yang bersumber bukan dari keterbatasan anggaran melainkan dari tidak adanya mekanisme yang mampu mendeteksi stok kritis sebelum benar-benar habis. Penelitian ini mendesain kembali proses pengendalian persediaan obat RSKM dari kondisi eksisting (as-is) menuju rancangan proses yang diusulkan (to-be), dengan memetakan alur pengadaan menggunakan SIPOC dan Value Stream Mapping (VSM), mengidentifikasi prioritas kegagalan proses melalui Failure Mode and Effects Analysis (FMEA), dan menghitung parameter pengendalian persediaan (ABC, Safety Stock, Reorder Point, dan Economic Order Quantity) berdasarkan lead time aktual per item — bukan asumsi seragam 14 hari yang selama ini digunakan. Hasil analisis mengidentifikasi dua titik kegagalan kritis: stok kritis yang tidak terdeteksi tepat waktu (RPN = 576) dan rencana kebutuhan obat (RKO) yang tidak mencerminkan konsumsi aktual (RPN = 392); koreksi lead time aktual (bervariasi 1–43 hari) menurunkan rata-rata Reorder Point sebesar 48–75% di tiga gudang. Berdasarkan temuan tersebut, dirancang proses to-be berupa sistem notifikasi tiga level  yakni Yellow Alert saat stok menyentuh 30% stok maksimum, Orange Alert saat mencapai Reorder Point disertai rekomendasi kuantitas pemesanan EOQ, dan Red Alert saat stok turun di bawah Safety Stock dengan eskalasi otomatis ke manajemen yakni dilengkapi approval matrix lima tingkat yang selaras dengan struktur otorisasi keuangan RSKM dan SOP fail-safe 14 langkah.