Eko Hariyanto
Universitas Pembangunan Panca Budi, Indonesia

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

An intelligent information system with optimization-based decision support for workforce scheduling under uncertain labor availability Eko Hariyanto; Muhammad Iqbal; Kana Saputra Saragih; Nuranisah Nuranisah
Jurnal Ilmu Komputer dan Sistem Informasi |JIKSI| Vol. 7 No. 2 (2026): Jurnal Ilmu Komputer dan Sistem Informasi (JIKSI) [in Progress]
Publisher : Institute of Information Technology and Social Science (IITSS)

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61346/jiksi.v7i2.390

Abstract

Earlier research on the same coffee-maintenance case emphasized computational efficiency, while imprecise daily labor availability remained outside its formulation. This study develops a model-driven decision-support framework integrating triangular fuzzy labor availability, lower-bound alpha-cut capacity construction, and convex mixed-integer quadratic programming (MIQP). The model combines recurring maintenance, terrain-dependent labor requirements, daily motorcycle allocation, and quadratic delay penalties. The case uses plantation data from the Coffee Farmers Association in Aceh Tengah Regency, Aceh, Indonesia, and workforce estimates elicited through management interviews. Computational evaluation using Gurobi 10 comprised 99 runs across 11 scales of 50–538 blocks and nine combinations of uncertainty-spread and cut-level settings. The overall mean relative MIP gap was approximately 1.41% under a prescribed tolerance of 1.5%. Mean operational cost was approximately IDR 1.864 billion, with limited variation across capacity configurations under fixed workload and cost assumptions. After averaging over the sampled cut levels, mean total delay was 37.04% higher at the largest spread setting than at the smallest. After averaging over the sampled spread settings, it was 34.49% lower at the highest cut level than at the lowest. These descriptive contrasts concern parameter combinations that jointly determine effective workforce capacity. The results support scenario comparison within the adopted model; they do not establish field performance or minimum-delay schedules.