Pelaksanaan Pekerjaan Soldier Pile sebagai Dinding Penahan Tanah pada Proyek Pembangunan Gedung Perdagangan di Kawasan Alam Sutera Riska Nur Intan; Kuni Saadati; Raka Surya Pradana
Journal Information Technology Engineering and Science (JITES) Vol 6 No 1 (2026): JITES
Publisher : Universitas Tangerang Raya

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Earth-retaining work is an important part of multi-storey building construction with a basement becauseit keeps the excavation stableagainst lateral earth pressure. This article describes the soldier pile work used as an earth-retaining wall in the Commercial Building Construction Project in the Alam Sutera area, covering the workstages, materials and equipment, field records, and theproblems found together with their treatment. A descriptive method was applied through field observation, documentation, review of shop drawings and Daily Piling Records, and a literature studyduring theinternship from12 Juneto 12 September2026. Theproject comprises 215 soldier pile points: 199 points of 800 mm diameter and 16 points of 1000 mm diameter, constructed by the wet boring method with casing and concrete placement by tremie pipe. The site is a cut-and-fill area with silty clay fill and perched water at a depth of 4–10 m. The problems observed were sediment at the bottom of the borehole, borehole wall collapse, and overpour and potential concrete segregation caused by trapped water. At the two reviewed points, SP68 (Ø800 mm) and SP133 (Ø1000 mm), the actual concrete volume exceeded the theoretical volume by 7.67% and 5.6%, respectively. The observations show that soldier pile work on fill soil depends strongly on casing installation, borehole bottom cleaning, control of tremie concrete placement, and disciplined Daily Piling Record keeping.