Claim Missing Document
Check
Articles

Found 1 Documents
Search

IMPROVING MEAN TIME BETWEEN FAILURE OF HYDRAULIC EXCAVATOR KOMATSU PC4000-6 BY USING DMAIC Deni Eko Mukti; Gembong Baskoro
ILTEK : Jurnal Teknologi Vol. 21 No. 02 (2026): ILTEK : Jurnal Teknologi
Publisher : Fakultas Teknik Universitas Islam Makassar

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47398/9zrpdv71

Abstract

The maintenance process of heavy equipment, particularly the Hydraulic Excavator Komatsu PC4000-6, is highly complex as it is influenced by machine quality, work methods, materials, and operator skills. PT United Tractors Tbk faced a challenge in its Full Maintenance Contract with PT XYZ, as the Mean Time Between Failure (MTBF) failed to reach the target of 100 hours and only achieved 80 hours (80%). This research applied the DMAIC approach, FMEA (Risk Priority Number), Pareto analysis, 5W2H, and Why-Why analysis to identify root causes and formulate improvement strategies. The results showed that the proposed strategy successfully increased MTBF from 80 hours to 100 hours, fulfilling the contractual target. This improvement not only supports the productivity of hydraulic excavators in mining operations but also enables PT United Tractors Tbk to maintain service quality in its Full Maintenance Contractbusiness.