Claim Missing Document
Check
Articles

Found 2 Documents
Search

Feasibility Study of Public Health Center X Tambunan, Willy; Pawitra, Theresia Amelia; Siagian, Riko Yehezkiel
Jurnal Sistem Teknik Industri Vol. 23 No. 2 (2021): JSTI Volume 23 Number 2 July 2021
Publisher : TALENTA Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32734/jsti.v23i2.6391

Abstract

Public Health Center X is the first level health facility service provider in subdistrict X. Established in 1975, UPT Puskesmas X has never conducted a feasibility study which has been regulated since 2014. Based on these problems, this study aims to conduct a feasibility study on a new building. Aspects contained in Permenkes No. 75 of 2014 namely aspects of location, buildings, facilities and infrastructure, health equipment, personnel, and organization. There is a health center design stage which is made in accordance with the criteria of the Minister of Health No. 75 of 2014. Based on the results of research conducted on the new building of Public Health Center X, it is known that the location aspect meets 87.5% of the location criteria, the building aspect meets 100% of the building suitability, the facilities and infrastructure aspect meets 100% of the eligibility criteria, the equipment aspect only meets 34% of the equipment that must be owned, the manpower aspect fulfills 73% of the total workforce owned, and the organizational aspect meets 100% of the conformity of the organizational structure, so that overall Public Health Center X has a feasibility percentage of 82.4%. Public Health Center X needs to evaluate and improve. Improvements were made to the location aspect, namely, parking facilities by increasing the capacity of the parking lot. Then do the procurement and purchase of medical equipment because there are still 66% of equipment that is lacking, as well as adding health workers to the positions of public health workers, environmental health workers, and workers.
Perencanaan Persediaan Darah pada UDD PMI Kabupaten Berau Menggunakan Metode Continuous Review System (CRS) Aulia, Armeynita Nur; Tambunan, Willy; Asdi, Ridzky Zul
Factory Jurnal Industri, Manajemen dan Rekayasa Sistem Industri Vol. 4 No. 3 (2026): Edisi April
Publisher : Ilmu Bersama Center

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56211/factory.v4i3.1649

Abstract

Pengendalian persediaan darah yang tidak optimal dapat menyebabkan ketidakseimbangan antara permintaan dan ketersediaan stok. Penelitian ini bertujuan untuk menentukan kebijakan persediaan optimal Packed Red Cell (PRC) di Unit Donor Darah (UDD) PMI Kabupaten Berau dengan mempertimbangkan pola permintaan dan efisiensi biaya. Metode yang digunakan adalah peramalan time series yang kemudian diolah menggunakan Continuous Review System (CRS) untuk menentukan jumlah pemesanan optimal, titik pemesanan kembali, dan persediaan pengaman. Hasil penelitian menunjukkan bahwa pola permintaan PRC cenderung stabil hingga berfluktuasi ringan. Model peramalan terbaik untuk golongan darah A menggunakan Weighted Moving Average (length = 10) dengan MAD 0,75, MSE 0,73, dan MAPE 2,0%. Golongan darah B menggunakan Moving Average (length = 11) dengan MAD 4,36, MSE 19,04, dan MAPE 10,1%. Golongan darah AB menggunakan Weighted Moving Average (length = 11) dengan MAD 3,21, MSE 10,32, dan MAPE 15,3%. Golongan darah O menggunakan Weighted Moving Average (length = 10) dengan MAD 3,52, MSE 14,91, dan MAPE 5,8%. Penerapan metode CRS menunjukkan bahwa tidak diperlukan safety stock pada seluruh golongan darah dengan tingkat pelayanan di atas 99%. Selain itu, metode ini mampu menurunkan biaya persediaan sebesar 44% pada golongan darah A dan B, 42% pada golongan darah AB, serta 45% pada golongan darah O. Dengan demikian metode CRS dianggap efektif dalam meningkatkan efisiensi biaya sekaligus menjaga ketersediaan persediaan darah PRC di UDD PMI Kabupaten Berau.