Claim Missing Document
Check
Articles

Found 5 Documents
Search

Penerapan Metode AHP dalam Proses Pemilihan Alat Angkut Berat pada Konstruksi Terowongan Layang Bawah Laut Purnomo, Dwi Agus
Majalah Ilmiah Pengkajian Industri Vol 8, No 2 (2014): MAJALAH ILMIAH PENGKAJIAN INDUSTRI
Publisher : BPPT

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (2590.943 KB) | DOI: 10.29122/mipi.v8i2.3651

Abstract

Metode Analytic Hierarchy Process (AHP) dikembangkan oleh Thomas L. Saaty pada tahun 1970an. Metode ini adalah merupakan sistem pembuat keputusan dengan menggunakan model matematis. Pemanfaatan dari metode AHP ini akan dapat membantu dalam menentukan prioritas dari beberapa kriteria dengan melakukan analisa perbandingan berpasangan dari masing-masing kriteria. Dalam sistem pengelolaan kinerja yang dimaksud dengan kriteria tersebut, yang selanjutnya disebut Kinerja Pengelolaan Indikator (KPI). Penerapan metode AHPdalam proses pemilihan alat angkut berat diaplikasikan pada proyek pembangunan terowongan layang bawah laut di Kepulauan Seribu dengan mengidentifikasi atribut kriteria dan alternatif untuk, menentukan besar prioritas atribut dan alternative. Proses analisis melalui pendekatan AHP dengan atribut kriteria- Level 1 dan alternatif-Level 2 terhadap tujuan-Level 0; maka dipilih jenis alat angkut berat sebagai alternatif dengan unsur kriteria tertentu.Kata kunci : AHP, Konstruksi Terowongan Layang Bawah Laut.AbstractAnalytic Hierarchy Processherein after referred as AHP is a method that has developed by Thomas L. Saaty in year 1970. This method is likely a decision making system within using mathematic model. Utilization of AHP method that can help people to decide several criteria priority by pare analysis of each criteria. In managing system of performance mentioned with these criteria that can referred as Indicator Management Performance. Application of AHP method in processing of heavy equipment selection will be applied in submerged floating tunnel construction project at Kepulauan Seribu by identify criteria attribute and alternative to decide priority vector of these attribute and alternative. Analyzing process thorough AHP nearby within attribute criteria-Level1 and alternative criteria-Level2 face to objective criteria-Level 0, therefore it can be selected the heavy equipment as the alternative with the element criteria.Key words : AHP, Submerged Floating Tunnel Construction.
ANALISIS PERHITUNGAN MODUL JEMBATAN GELAGAR I DAN GELAGAR BOX BAJA SEBAGAI FUNGSI JEMBATAN JALAN RAYA Witriyatna, Cahya; Purnomo, Dwi Agus; Waseso, Agung Barokah; Marindaa, Mira
Majalah Ilmiah Pengkajian Industri Vol 12, No 2 (2018): Majalah Ilmiah Pengkajian Industri
Publisher : BPPT

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (815.37 KB) | DOI: 10.29122/mipi.v12i2.3107

Abstract

Jembatan merupakan bagian dari prasarana transportasi yang berfungsi sebagai  penghubung jalan yang terputus oleh rintangan (sungai, danau, laut,  lembah,  prasarana transportasi lainnya)  yang melintas tidak sebidang seperti jalan, jalur rel kereta api.  Jika diklasifikasikan secara fungsinya jembatan dapat dibedakan menjadi jembatan jalan raya dan jembatan kereta api. Pada paper ini, akan diperlihatkan apakah penggunaan ukuran bentang jembatan 41.15  meter akan lebih optimum (efektif dan efisien) menggunakan gelagar I dengan tinggi 200 cm atau box girder tinggi 200 cm dan beban-beban yang digunakan pada jembatan jalan raya tersebut yang dikelompokkan menjadi tiga kelompok beban, yaitu berat sendiri gelagar/girder, beban mati tambahan, dan beban hidup. Beban mati tambahan yang dianalisis yaitu beban pelat beton, aspal, dan diafragma sedangkan untuk beban hidup dengan fungsi jalan raya adalah beban D yang terdiri dari beban terdistribusi (load distribution) dan beban Knife Edge Load (KEL) berdasarkan "Pembebanan Untuk Jembatan SNI 1725-2016.Dari hasil perhitungan antara modul jembatan gelagar I dan box girder baja ukuran bentang 41.15 m untuk jembatan jalan raya dengan tinggi gelagar 200 cm diperoleh kesimpulan bahwa untuk tinggi gelagar 200 cm pada jembatan jalan raya lebih efektif mengunakan tipe gelagar box  baja berbasis material SNI yang cukup mampu menahan beban lalu-lintas jalan raya sesuai standar.Pada studi kasus rencana perlintasan di Jl. KH.  Mansyur Pekalongan untuk memperoleh estetika yang memadai, maka modul jembatan  gelagar box  akan lebih menjanjikan dari aspek estetika dan arsitektoris dengan konfigurasi bentang yang bervariasi dari 30 m s/d 100 m dengan trase jembatan bisa lurus atau lengkung..Berdasarkan hasil penelitian tentang analisa perhitungan pembebanan untuk jembatan ukuran bentang 41.15 m yang menggunakan SNI 1725 2016 (standar baru), diketahui terjadi perbedaan beban angin dan beban gempa sebesar  ( 30-40) % terhadap RSNI T-02 2005.
COMPARISON ANALYSIS OF RAILWAY BRIDGE MODUL FOR “I” GIRDER TYPE AND “WARREN” TRUSS TYPE Purnomo, Dwi Agus; Utomo, Djoko Prijo; Waseso, Agung Barokah; Marindaa, Mira
Majalah Ilmiah Pengkajian Industri Vol 14, No 1 (2020): Majalah Ilmiah Pengkajian Industri
Publisher : BPPT

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29122/mipi.v14i1.3833

Abstract

The railway bridge in Indonesia, with a width of 1067 mm, was built in 1878, so that maintenance modules are needed to repair or to replace of construction modul at regular intervals. Implementation of maintenance and repairs refers to the Minister of Transportation Regulation No. 60 of 2012. Problems were encountered in the field at the BH182 Daop 2 railway bridge in Bandung due to lowering structural strength. Therefore, it was necessary to repair the bridge module with a new bridge design. The purpose of this study is to analyse and to calculate strength of the structure and to determine effectiveness of the use of construction materials on 2 alternative bridge construction selection with the type of ?I" girder and the type of ?Warren" Truss. Design implementation method used is to utilize Midas Civil Structure software. The loading used for railway bridges is grouped into three load groups, namely the girder's self-weight, additional dead load, and live load. Additional dead load analysed is line load including bearings, while for live load is trainset load based on loading requirements. From the results of calculations between the steel bridge ?I" girder type height of 300 cm and the type of ?Warren" Truss height of 600 cm, each span of 30 m showed that those were a function of the railway bridge. It would be more effective to use the type of ?Warren? Truss structure that is quite able to withstand train traffic loads in accordance with applicable standards.
Penerapan Metode AHP dalam Proses Pemilihan Alat Angkut Berat pada Konstruksi Terowongan Layang Bawah Laut Purnomo, Dwi Agus
Majalah Ilmiah Pengkajian Industri Vol. 8 No. 2 (2014): Majalah Ilmiah Pengkajian Industri
Publisher : Deputi TIRBR-BPPT

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (2590.943 KB) | DOI: 10.29122/mipi.v8i2.3651

Abstract

Metode Analytic Hierarchy Process (AHP) dikembangkan oleh Thomas L. Saaty pada tahun 1970an. Metode ini adalah merupakan sistem pembuat keputusan dengan menggunakan model matematis. Pemanfaatan dari metode AHP ini akan dapat membantu dalam menentukan prioritas dari beberapa kriteria dengan melakukan analisa perbandingan berpasangan dari masing-masing kriteria. Dalam sistem pengelolaan kinerja yang dimaksud dengan kriteria tersebut, yang selanjutnya disebut Kinerja Pengelolaan Indikator (KPI). Penerapan metode AHPdalam proses pemilihan alat angkut berat diaplikasikan pada proyek pembangunan terowongan layang bawah laut di Kepulauan Seribu dengan mengidentifikasi atribut kriteria dan alternatif untuk, menentukan besar prioritas atribut dan alternative. Proses analisis melalui pendekatan AHP dengan atribut kriteria- Level 1 dan alternatif-Level 2 terhadap tujuan-Level 0; maka dipilih jenis alat angkut berat sebagai alternatif dengan unsur kriteria tertentu.Kata kunci : AHP, Konstruksi Terowongan Layang Bawah Laut.AbstractAnalytic Hierarchy Processherein after referred as AHP is a method that has developed by Thomas L. Saaty in year 1970. This method is likely a decision making system within using mathematic model. Utilization of AHP method that can help people to decide several criteria priority by pare analysis of each criteria. In managing system of performance mentioned with these criteria that can referred as Indicator Management Performance. Application of AHP method in processing of heavy equipment selection will be applied in submerged floating tunnel construction project at Kepulauan Seribu by identify criteria attribute and alternative to decide priority vector of these attribute and alternative. Analyzing process thorough AHP nearby within attribute criteria-Level1 and alternative criteria-Level2 face to objective criteria-Level 0, therefore it can be selected the heavy equipment as the alternative with the element criteria.Key words : AHP, Submerged Floating Tunnel Construction.
THE COMPARATIVE STUDY OF RAILWAY BRIDGE DESIGN LOAD BETWEEN PM 60/2012 AND EN 1991: 2-2003 Barasa, Willy; Fiantika, Thiya; Purnomo, Dwi Agus; Aspar, Wimpie Agoeng Noegroho
Majalah Ilmiah Pengkajian Industri Vol. 14 No. 2 (2020): Majalah Ilmiah Pengkajian Industri
Publisher : Deputi TIRBR-BPPT

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29122/mipi.v14i2.4196

Abstract

In Referring to the government programs on the increasing speed of the Jakarta-Surabaya express train in 2017, problems arise in the field, namely the potential increase in freight transportation via the railway line where an increase in loading is required on the railway especially for the existing bridge. This Research was implemented by increasing of the loading of the standard PM 60/2012 bridge to be compared with the EN1991: 2/2003 standard. This research analyzed the increase in structural strength of the 30m span steel bridge of the BH 182 constructed in Operational Region 2 Bandung as a results of loading adjustment from PM 60/2012 to EN 1991:2/2003.This paper explained an effect caused by increasing load on railway bridges with similar span and materials on normal plane, shear plane, moment and deflection. Structural analysis and calculation was performed by means of SAP2000 software. Results of analysis showed that standard equalization of EN 1991:2/2003 caused increasing percentage of loading combination of Comb L, normal plane, shear plane, moment plane, and deflection are of 35%, 60%, 71%, and 31%, respectively. While for Comb R loading combination for normal plane, shear plane, moment plane, and deflection are of 30%, 64%, 71%, and 30%, respectively.Keywords : PM 60 of 2012; EN1991:2-2003; SAP2000; Normal Field; Shear Field; Moment Field; Deflection.