Claim Missing Document
Check
Articles

Found 2 Documents
Search

ANALISIS PENGENDALIAN PERSEDIAAN BAHAN BAKU TAHU DALAM PERENCANAAN PRODUKSI DENGAN MENGGUNAKAN METODE ECONOMIC ORDER QUANTITY (EOQ) DI CV. DIN-YU Nurcahyadi, Alif; Sukma, Franka Hendra; Syahabuddin, Agus
Teknologi : Jurnal Ilmiah dan Teknologi Vol. 6 No. 2 (2023): Teknologi : Jurnal Ilmiah dan Teknologi
Publisher : Universitas Pamulang

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

CV. Din-Yu merupakan perusahaan yang bergerak dibidang produksi pangan khususnya memproduksi tahu dengan menggunakan bahan baku kacang kedelai. Pada proses produksinya, perusahaan belum membuat suatu analisa pada proses persediaan bahan baku. Analisa yang dilakukan masih menggunakan sistem kira-kira dalam melakukan pembelian kembali pada bahan baku dengan melihat pada data produksi terakhir. Dalam penelitian ini, dilakukan dengan menentukan jumlah optimal dalam setiap melakukan pemesanan serta mengetahui total biaya yang harus dikeluarkan dalam pengadaan persediaan. Metode yang digunakan dalam penelitian ini adalah Economic Order Quantity (EOQ) dengan tiga metode peramalan. Didapatkan model trend analysis yang mempunyai nilai error terendah dengan Mean Absolute Deviation (MAD) 294,96. Dari hasil penelitiannya jumlah pemesanan yang optimal menggunakan metode Economic Order Quantity (EOQ) adalah sebesar 12.861 kg untuk setiap kali pesan dan total persediaan dengan menggunakan metode Economic Order Quantity (EOQ) pada tahun 2022 adalah sebesar Rp 1.527.051,54 dengan penghematannya sebesar 65,22%.
Improvement Risk Level Pada Proyek Gas Insulated Substation Sawangan Menggunakan Metode Hazard Identification Risk Assessment and Risk Control (HIRARC) Syahabuddin, Agus; Sudiman, Sudiman
Jurnal Optimalisasi Vol 10, No 2 (2024): Oktober
Publisher : Universitas Teuku Umar

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35308/jopt.v10i2.10113

Abstract

The implementation of construction projects always has the potential for danger or risk that can cause considerable losses regarding costs, materials, and time. Every workplace always has the risk of work accidents that can disrupt work activities in a project. The factors that cause work accidents are the lack of understanding of good Occupational Safety and Health (K3) and also the lack of implementation of the Occupational Health and Safety Management System (SMK3) in the project. The work on the Sawangan Gas Insulated Substation project is one of the projects with a fairly high level of risk in the construction world. This study aims to identify K3 risks, assess risks, and determine their control in order to reduce the level of risk. The method used in risk assessment in this study is Hazard Identification Risk Assessment and Risk Control (HIRARC). The stages used are identifying hazards, assessing risks and determining the controls used to compile K3 goals and targets to be achieved. Based on the results of this study, the Risk Rating can be reduced from 575 Risk Rating to 401 Risk Rating. After the risk control process was carried out, there was an increase, namely: High risk decreased by 65.6% from 32 to 11, Moderate risk decreased by 9.5% from 21 to 19, and for Low risk it increased from 0 to 23. The highest risks were found in commissioning and test function work, installation brickwall and roofing for control building, and tower foundation excavation.