Claim Missing Document
Check
Articles

Found 1 Documents
Search

Relayout dengan Menggunakan BLOCPLAN Tool Analysis Anugerah, Budi; Nasution, Andri
Jurnal Sistem Teknik Industri Vol. 22 No. 1 (2020): JSTI Volume 22 Number 1 January 2020
Publisher : TALENTA Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32734/jsti.v22i1.2885

Abstract

PT. Industri Nabati Lestari or PT. INL is a subsidiary of PTPN 3 and PTPN 4 which is engaged in CPO processing. But from each production cycle, every raw material needed by PT. INL is not only supplied by PTPN itself, but many suppliers take part in the supply of raw materials. The problem faced by the company now is the inefficient flow of material in the current company layout from loading raw materials to the final product shipping process. Therefore the first thing is to observe the flow material problems, one of which is rearrangement or relayout using the ARC-BLOCPLAN method