Perbandingan Elemen Struktur Yang Dicetak Dengan Bekisting Alumunium Dan Konvensional Dengan Metode Six Sigma Atidaputra, Zaidhan Ramadhani; Nugraha Azka, Muhammad Rakha; Hakim, Febri Fahmi; Abda, Julmadian
Jurnal Inovasi Konstruksi Vol 3, No 2 (2024): October
Publisher : Politeknik Pekerjaan Umum

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56911/jik.v3i2.126

Abstract

Bekisting konvensional untuk saat ini masih menjadi pilihan terbanyak bagi pelaksana industri konstruksi di Indonesia. Namun dengan perkembangan metode konstruksi, metode bekisting konvensional mulai digantikan dengan metode bekisting lainnya, penggunaan bekisting konvensional mulai digantikan dengan metode bekisting lain, seperti bekisting alumunium. Secara umum penelitian ini bertujuan untuk mengetahui perbandingan antara bekisting alumunium dan bekisting konvensional dari segi mutu beton yang dihasilkan. Objek pada pada penelitian ini adalah pekerjaan pemasangan bekisting lantai 10 sampai 12 pada Tower 2 dan Tower 3 di Proyek Pembangunan Rumah Susun proyek X. Hasil dari analisis terhadap mutu yang dihasilkan dari bekisting alumunium didapatkan nilai 4,6 sigma sehingga telah mencapai standarisasi kualitas industri USA, dan untuk analisis terhadap mutu yang dihasilkan dari bekisting konvesional  didapatkan nilai 3,49 sigma sehingga telah mencapai standarisasi kualitas industri Indonesia tingkat atas. Dari penelitian tersebut dapat disimpulkan bahwa bekisting alumunium lebih unggul daripada bekisting konvesional dalam menghasikan kualitas beton yang lebih kompetitif.Conventional formwork is currently still the most popular choice for construction industry implementers in Indonesia. However, with the development of construction methods, conventional formwork methods began to be replaced by other formwork methods, such as aluminum formwork. In general, this study aims to find out the comparison between aluminum formwork and conventional formwork in terms of the quality of the concrete produced. The object of this study is the installation of formwork on the 10th to 12th floors in Tower 2 and Tower 3 in the Flats Construction Project of Project X. The results of the analysis of the quality produced from aluminum formwork obtained a value of 4.6 sigma so it has reached the standardization of the quality of the USA industry. For the analysis of the quality produced from conventional formwork, a value of 3.49 sigma was obtained so that it has reached the top level of Indonesia's industrial quality standardization. From the study, it can be concluded that aluminum formwork is superior to conventional formwork in producing more competitive concrete quality. 
Analisis Perbandingan Quantity Take-Off Cubicost TAS dan TRB Terhadap Perhitungan Konvensional Pada Area Plaza Basement Lantai Basement 1 Proyek Revitalisasi Masjid Agung Batam Centre Alifa, Rindiani Nur; Izza, Muhammad Naufal; Hakim, Febri Fahmi; Abda, Julmadian
Jurnal Inovasi Konstruksi Vol 3, No 1 (2024): April
Publisher : Politeknik Pekerjaan Umum

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56911/jik.v3i1.65

Abstract

BIM merupakan salah satu inovasi yang digunakan agar pelaksanaan proyek dapat terkolaborasi serta terintegrasikan dalam satu wadah digital yang mencakup seluruh unsur di proyek yaitu pemodelan 3D bangunan, quantity take off, harga, hingga penjadwalan. BIM dalam penerapaannya pada pelaksanaan proyek untuk unsur analisis pemodelan 3D bangunan serta quantity take off dapat menggunakan Cubicost, dalam spesifiknya terdapat 2 jenis Cubicost yang dapat digunakan pada analisis ini yaitu Cubicost TAS dan Cubicost TRB. Penelitian ini bertujuan membandingkan volume hasil quantity take-off menggunakan Cubicost TAS dan TRB dengan perhitungan konvensional pada pekerjaan struktur beton dan baja tulangan pada Proyek Revitalisasi Masjid Agung Batam Centre. Hasil perhitungan perbandingan volume quantity take-off Cubicost TAS dengan perhitungan konvensional yang signifikan didapati pada pekerjaan balok tipe B2 sebesar 4,427 m3 (0,885%), B3 sebesar 0,167 m3 (0,874%), dan plat lantai sebesar 4,276 m3 (0,487%). Sementara hasil perhitungan perbandingan volume quantity take-off Cubicost TRB dengan perhitungan konvensional yang signifikan didapati pada pekerjaan plat lantai sebesar 1.482,970 kg (1,397%), balok B3 sebesar 37,975 kg (1,293%), dan B2 sebesar 1.599,799 kg (1,143%).