ANALISA PENENTUAN SILINDER HIDROLIK PADA KONDISI OPTIMUM PINTU PENGURAS KOLAM PASIR PLTA BATANG AGAM Riza Muharni; Dytchia Septi Kesuma; Femi Earnestly
Rang Teknik Journal Vol 4, No 2 (2021): Vol. 4 No. 2 Juni 2021
Publisher : Fakultas Teknik Universitas Muhammadiyah Sumatera Barat

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (845.824 KB) | DOI: 10.31869/rtj.v4i2.2669

Abstract

The Batang Agam Hydroelectric Power Plant is a run of river type plant that has water purification stages before being used to turn a turbine generator. One of them is a sand pool that functions to deposit sand, mud and impurities carried by river water, where the drainage condition is currently experiencing some damage so it needs to be developed in the hoisting system of the fixed valve drain using a hydraulic lifting system and this requires initial analysis in the form of fixed valve loading at optimum conditions which then becomes the basis for determining the hydraulic cylinder.The research methodology in this writing includes field observations accompanied by a literature review. With the data obtained, we then analyze the optimum load on the Batang Agam hydropower fixed valve drain to be a reference in planning hydraulic cylinders as a hoisting system for the Sand pool fixed valve drain.From this final project, it can be concluded that the optimum load of the Batang Agam fixed valve drain at an elevation of 684.5 meters above sea level of 10472.95 kg equivalent to 10 tons is a conditional situation in the rainy season, and a medium load at an elevation of 683.7 meters above sea level of 9039.04 kg equivalent to 9 tons, Based on the calculation of hydraulic cylinder power at the optimum load obtained Ø cylindrical tube 360 mm, medium load obtained Ø cylindrical tube 320 mm.