Bermano, Ageak Raporte
Unknown Affiliation

Published : 2 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 2 Documents
Search

Designing Risk Qualitative Assessment on Fiber Optic Instalation Project in Indonesia Purba, Feviana Betsi; Andrawina, Luciana; Astuti, Murni Dwi; Pratami, Devi; Fadlillah, Fachri; Haryono, Imam; Bermano, Ageak Raporte
International Journal of Innovation in Enterprise System Vol. 2 No. 2 (2018): International Journal of Innovation in Enterprise System
Publisher : School of Industrial and System Engineering, Telkom University

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

A project always has risks that can lead to project failure. In the project, a risk analysis is required to provide an evaluation for the project to proceed as planned. In the event of inadequate planning and ineffective control, it will result in irregularities identified as a risk to the project. This study aims to analyze the qualitative risk on Fiber Optic Installaion project in Sukabumi, West Java, Indonesia. In addition, risk assessment is undertaken on project implementation. Assessment of risk using the impact and probability to measure the impact of risk occurrence. The impacts are more detailed by classified by time impact, cost impact, quality impact, safety and security impact, proximity. The result is there are 36 risk that may occur and mostly risks are associaated by quality and safety&security impact. Keywords— risk assessment, qualitative analysis, Project, fiber optic.
QUALITY METRIC DESIGN USING INTERNAL CONTROL METHOD TO CONTROL THE QUALITY OF FIBER OPTIC INSTALLATION PROJECT Abdurrahman, Ahmad Fauzan; Delvika, Rizka Hasna; Haryono, Imam; Pratami, Devi; Bermano, Ageak Raporte
International Journal of Innovation in Enterprise System Vol. 3 No. 1 (2019): International Journal of Innovation in Enterprise System
Publisher : School of Industrial and System Engineering, Telkom University

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

To provide internet network, one of public Telecommunication provider in Indonesia conduct several project related to fiber optic cable installation such as the STO Modernization Feeder project. In every project implementation, the company is concerned with quality in order to remain competitive with competitors. Deliverable which meets the project quality will produce the product in accordance with the requirements. STO Garut Feeder Modernization Project was experiencing delays which is caused by the non-conformity project deliverable to project specification during monitoring & controlling phase. At project planning, the quality metric was not designed, which can be used as a guideline for vendor in carrying out the project task and to assist the process of quality control. Quality metric design is carried out using internal control methods that can identify possible errors in each project activity and critical success criteria that define a successful activity that will be performed. Result shows that only 67.1% statement (critical success criteria) form critical activity is implemented. This result can answer why the project delay because the activity on critical path is mostly re-worked due to non-conformity issues. Keywords—Quality, quality metric, internal control, control quality, telecommunication project