Safety Risk Management in Dam Construction Projects: Literature Review Aulia, Dinal; marifah, lusi; Yurrazak, Ikbal; Purba, Humiras Hardi
Journal of Industrial and Engineering System Vol. 2 No. 1 (2021): Juni 2021
Publisher : Program Studi Teknik Industri, Fakultas Teknik, Universitas Bhayangkara Jakarta Raya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31599/jies.v2i1.636

Abstract

Safety risk assessment in dams is a traditional and modern approach to the engineering process of dams on safety systems so as to produce a design history that has a good overall record and integrity. With this approach for both old and new dams, this safety risk assessment aims to determine whether the risk the hazard can be tolerated or not, if it cannot be tolerated then there must be a solution for action to reduce the risk of danger so that the safety of the dam can be obtained. The existing risk assessment can be used as the basis for the construction of the dam to its maintenance, in this study discussed risk assessment safety on dams located in several countries such as in Asia, Europe and America. The methods implemented include the preparation of safety risks, risk analysis, risk evaluation and safety risk management. Based on research results The main risk factor that causes safety responsibilities is the Contractor's responsibility, namely the Non-technical project factor (40.54%), the 2nd rank is the Undecided Responsibility due to internal technical factors (35.13%), the 3rd rank is the technical project factor namely Contractor's Responsibility (10.8%), Rank 4 is external technical factor and external non-technical factor, the last risk factor is internal non-technical factor (2.7%) namely Joint Responsibility. Keywords : Risk safety management, risk assessment, risk analysis, risk evaluation, dam project
CRITICAL SUCCESS FACTORS FOR MODULAR CONSTRUCTION ON HIGH-RISE RESIDENTIAL BUILDINGS BASED RISK MANAGEABILITY TO INCREASE PROJECT TIME PERFORMANCE Aulia, Dinal; Haryanto, Vian Marantha; Waseso, Agung Barokah; Prayitno, Endarmadi Aji; Sampetoding, Mira Marindaa T
INDONESIAN JOURNAL OF URBAN AND ENVIRONMENTAL TECHNOLOGY VOLUME 6, NUMBER 2, OCTOBER 2023
Publisher : Universitas Trisakti

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25105/urbanenvirotech.v6i2.13826

Abstract

International Construction Costs published in Comparison 2020 continued to increase as an impact of the Covid-19 pandemic, The modular system is considered able to answer the problems of increasing costs. Although modular construction has been widely applied to low-rise buildings, application in high-rise buildings remains limited, less than 1% worldwide. The need for residential high-rise building applying modular construction in Indonesia becomes important. The interdependence between parties in modular projects is greater than in conventional methods. Unavailability of design guidelines hinders the construction industry in implementing modular technology. The purpose of this study is to analyze the critical success factors for modular construction of residential high-rise buildings applying risk-based management to improve project time performance. Forty-one Indicators were drawn from literature reviews and specialist interviews to conduct a sustainability evaluation. The survey was submitted to case project developers, designers, supervisors, and contractors in Indonesia, thereafter statistically analyzed using SPSS and risk management analysis with three stages: risk sources, risk drivers and risk causes. Critical success factors for drawing approvals have a considerable influence on modular construction among 15 other factors, followed by supply chain and design standardization. It is necessary to mitigate these risks to improve project time performance.