Analisis Kompetensi Kerja Tukang Plester di Kota Palu Asnudin, A.; Ridwan, M.A.
REKONSTRUKSI TADULAKO: Civil Engineering Journal on Research and Development Vol. 2, Issue 2 (September 2021)
Publisher : Civil Engineering Department, Tadulako University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22487/renstra.v2i2.335

Abstract

One effort to empower the implementation of construction projects in order to maintain the quality of the final work is the application of competency standards for workers who hold a strategic position in determining the quality of the final building, in this case plaster workers. The aims of this research was to know the application of plasterer competency standards based on the Indonesian National Work Competency Standards (SKKNI) on building projects in Palu City. This research was conducted on plasterers of buildings in the city of Palu. The research method used was literature study, the primary data collection was done by distributing the questionnaires. The selected respondents were plasterers. Data were processed by using descriptive statistical methods and using the Relative Rank Index (RRI). The results showed that the application of plasterers' work competency standards based on SKKNI was around 80% to 90% which had been well implemented, namely, carrying out Preparation of Plastering Work, Carrying Out Plaster Mixing Mixes, Carrying Plaster Work. In addition, around 20% to 30% have not been well implemented, namely, the use of PPE and WSE, Making Job Reports.
Analisis Penjadwalan Waktu Pekerjaan Pada Proyek Jalan Kawasan Ekonomi Khusus (KEK) Pantoloan Menggunakan Linear Scheduling Method (LSM) Asnudin, A.; Ramlan, R.; Ganiya, P.A.
REKONSTRUKSI TADULAKO: Civil Engineering Journal on Research and Development Vol. 6 Issue 1 (March 2025)
Publisher : Tadulako University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22487/renstra.v6i1.683

Abstract

A construction project is a temporary activity with a specific end goal. One of the crucial things in the construction process is work scheduling, this is because it can affect the duration and cost of the project. In the context of scheduling, methods such as Block Charts, S-Curves, Network Diagrams, and Balance Line Diagrams/Linear Scheduling Method (LSM) has been around for a long time, but in its application the scheduling method should be adjusted to the characteristics of the project to avoid losses in development. The LSM method is considered appropriate for work that is repetitive in nature. This research aims at analyzing time scheduling for road projects in the Pantoloan Special Economic Area (SEA), Central Sulawesi, using Linear Scheduling Method (LSM). The purpose of this research is to determine the comparison of scheduling and budget plans between the LSM and project methods existing. Data collection consisting of primary data and secondary data was obtained by direct observation in the field and interviews with related parties. Then a scheduling analysis is carried out with assistance software. From the research results on the scheduling of the Pantoloan KEK Road Section Handling Project in Palu City using the LSM method, the completion time was 47 days. Meanwhile, in the initial planning, a completion time of 60 days was required, so there was a difference of 13 days. The project budget plan using the LSM method obtained IDR 2.321.225.151,01. Meanwhile, the initial project budget plan is Rp. 2,365,900,000.00 so there is a cost difference of Rp. 44.674.849.- By looking at the comparison of time effectiveness, scheduling using the LSM method is more effective and efficient.