Khanif, Abdul
Unknown Affiliation

Published : 4 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 4 Documents
Search

HUBUNGAN PENGUASAAN STRUKTUR KALIMAT DAN MINAT MENULIS DENGAN KEMAMPUAN MENULIS EKSPOSISI PADA SISWA KELAS VIII SMPN 14 BANDAR LAMPUNG Khanif, Abdul
Lentera: Jurnal Ilmiah Kependidikan Vol 14 No 1 (2021): Lentera
Publisher : LPPM STKIP PGRI Bandar Lampung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.52217/lentera.v14i1.940

Abstract

This study aims to describe the correlation between sentence structure mastery and writing interest with the exposition writing ability in class VIII SMPN 14 Bandar Lampung in the 2020/2021 academic year. This research is due to the fact in the field that the ability to write exposition, mastery of sentence structure and interest in writing needs to be developed. The method used in this research is a questionnaire and a test. Testing the research hypothesis using the correlation coefficient test, product moment and multiple correlation. Previously, the analysis requirements test was carried out, namely the normality and linearity test of the data. The results showed that: (1) There is a positive and significant correlation between mastery of sentence structure and the ability to write exposition as indicated by the correlation coefficient of 0.312 and the coefficient of determination is (r2) = 0.596 or 59.60%. (2) There is a positive and significant correlation between writing interest and the ability to write exposition as indicated by the correlation coefficient of 0.312 and the coefficient of determination (r2) = 0.508. or by 50.80%. (3) There is a significant correlation between mastery of sentence structure and writing interest with the ability to write exposition as indicated by the correlation coefficient of 4.153 and the coefficient of determination is (r2) = 0.656. or 65.60%.
ANALISIS PREDIKSI DURASI PADA PEKERJAAN STRUKTUR GEDUNG BERTINGKAT MENGGUNAKAN METODE MONTE CARLO Saputro, Cahyo Dita; Khanif, Abdul
Jurnal Karkasa Vol 10 No 1 (2024): Jurnal Karkasa - Juli 2024
Publisher : LPPM Politeknik Saint Paul Sorong

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32531/jkar.v10i1.788

Abstract

Keberhasilan sebuah proyek dapat dilihat dari ketepatan waktu dalam menyelesaikannya. Pada umumnya proyek memiliki keterbatasan waktu dan sumber daya, hampir semua proyek konstruksi dipengaruhi oleh risiko dan ketidakpastian. Penelitian ini bertujuan untuk mengetahui bagaimana penerapan metode Monte Carlo untuk menentukan durasi pekerjaan struktur pada gedung bertingkat. Metode Monte Carlo adalah teknik komputasi yang digunakan untuk memodelkan ketidakpastian dalam sistem atau proses dengan melakukan simulasi sejumlah besar skenario atau percobaan acak. Berdasarkan hasil simulasi Monte Carlo pada penelitian ini, diperoleh prediksi durasi pekerjaan struktur gedung bertingkat untuk proyek selanjutnya. Dengan mempertimbangkan metode dan peralatan-peralatan yang digunakan serta luasan bangunan yang hampir sama atau mendekati, maka hasil prediksi dapat dijadikan acuan dalam menentukan durasi pekerjaan struktur gedung bertingkat pada proyek selanjutnya. Total durasi yang dibutuhkan untuk menyelesaikan pekerjaan struktur gedung bertingkat dengan luasan ± 5.000 m2 yaitu 84,30 minggu. Kemudian hasil perbandingan antara durasi rencana, durasi aktual dan durasi hasil prediksi, diperoleh rerata selisih yang kecil dan mendekati 1%.
HUBUNGAN PENGUASAAN STRUKTUR KALIMAT DAN MINAT MENULIS DENGAN KEMAMPUAN MENULIS EKSPOSISI PADA SISWA KELAS VIII SMPN 14 BANDAR LAMPUNG Khanif, Abdul
Lentera: Jurnal Ilmiah Kependidikan Vol. 14 No. 1 (2021): Lentera
Publisher : STKIP PGRI Bandar Lampung

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

This study aims to describe the correlation between sentence structure mastery and writing interest with the exposition writing ability in class VIII SMPN 14 Bandar Lampung in the 2020/2021 academic year. This research is due to the fact in the field that the ability to write exposition, mastery of sentence structure and interest in writing needs to be developed. The method used in this research is a questionnaire and a test. Testing the research hypothesis using the correlation coefficient test, product moment and multiple correlation. Previously, the analysis requirements test was carried out, namely the normality and linearity test of the data. The results showed that: (1) There is a positive and significant correlation between mastery of sentence structure and the ability to write exposition; (2) There is a positive and significant correlation between writing interest and the ability to write exposition; and (3) There is a significant correlation between mastery of sentence structure and writing interest with the ability to write exposition.
ANALISIS PREDIKSI DURASI PADA PEKERJAAN STRUKTUR GEDUNG BERTINGKAT MENGGUNAKAN METODE MONTE CARLO Saputro, Cahyo Dita; Khanif, Abdul
Jurnal Karkasa Vol 10 No 1 (2024): Jurnal Karkasa - Juli 2024
Publisher : LPPM Politeknik Saint Paul Sorong

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32531/jkar.v10i1.788

Abstract

Keberhasilan sebuah proyek dapat dilihat dari ketepatan waktu dalam menyelesaikannya. Pada umumnya proyek memiliki keterbatasan waktu dan sumber daya, hampir semua proyek konstruksi dipengaruhi oleh risiko dan ketidakpastian. Penelitian ini bertujuan untuk mengetahui bagaimana penerapan metode Monte Carlo untuk menentukan durasi pekerjaan struktur pada gedung bertingkat. Metode Monte Carlo adalah teknik komputasi yang digunakan untuk memodelkan ketidakpastian dalam sistem atau proses dengan melakukan simulasi sejumlah besar skenario atau percobaan acak. Berdasarkan hasil simulasi Monte Carlo pada penelitian ini, diperoleh prediksi durasi pekerjaan struktur gedung bertingkat untuk proyek selanjutnya. Dengan mempertimbangkan metode dan peralatan-peralatan yang digunakan serta luasan bangunan yang hampir sama atau mendekati, maka hasil prediksi dapat dijadikan acuan dalam menentukan durasi pekerjaan struktur gedung bertingkat pada proyek selanjutnya. Total durasi yang dibutuhkan untuk menyelesaikan pekerjaan struktur gedung bertingkat dengan luasan ± 5.000 m2 yaitu 84,30 minggu. Kemudian hasil perbandingan antara durasi rencana, durasi aktual dan durasi hasil prediksi, diperoleh rerata selisih yang kecil dan mendekati 1%.