This Author published in this journals
All Journal APTEK
Fahrizal -
Fakultas Teknik Universitas Pasir Pengaraian

Published : 5 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 5 Documents
Search

PEMBANGKIT LISTRIK TENAGA SURYA PADA PROYEK PENGADAAN AIR BERSIH DESA BATAS Fahrizal -
Jurnal APTEK Vol. 2 No. 1 (2010): APLIKASI TEKNOLOGI
Publisher : Universitas Pasir Pengaraian

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (572.65 KB) | DOI: 10.30606/aptk.v2i1.7

Abstract

Solar power (SP) is a new technology that is environmentally friendly and have an unlimited source location especially Indonesia, which is at the equator is highly disadvantaged because there is sunshine all year round. It is therefore a very potential new technology is developed on a large - scale in Indonesia that is being suffered an energy crisis. Starting from the problem above, the authors raise and interested at all about Solar Power as a potential energy source is developed in Indonesia, the Batas Village Water Supply Project the use of technology Solar Power Generation.
PERENCANAAN APLIKASI RCM DENGAN ANALISA KUALITATIF PADA STASIUN PENGOLAHAN BIJI SAWIT Legisnal Hakim; Fahrizal -
Jurnal APTEK Vol. 3 No. 2 (2011): APLIKASI TEKNOLOGI
Publisher : Universitas Pasir Pengaraian

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (580.246 KB) | DOI: 10.30606/aptk.v3i2.46

Abstract

In this globalization, companies are have to increase productivity in order to produce maximum output. In this case, especially system productivity company. Smoothness system or production process is supported by many aspects, one of which is the aspect of reliability of existing machinery or equipment in the production system.In palm oil mills, there are two processing stations and processing of palm fruit processing palm kernel. Palm kernel oil processing systems, among others, Pressing, Nut fiber, Depricarper, Polishing drum, cyclone Nut, Nut hoper, Ripple mill, LTDS 1 & 2, Claybath. To increase the productivity of these systems need to be an appropriate activity treatment on the machine or equipment, in an effort to increase conduction reliability of the equipment in the system kernel oil processing. For it is necessary for treatment planning method RCM (Reliability Centered Maintenance) using qualitative analysis where the RCM method can determine the identification of critical equipment and components, optimum care, treatment and consequences of activity intervals failures in machinery or equipment or core processing system palm on palm oil mills company.
PENERAPAN RCM PADA SISTEM DISTRIBUSI AIR DI PDAM PASIR PUTIH PEMATANGAN BARANGAN KABUPATEN ROKAN HULU Legisnal Hakim; Fahrizal -
Jurnal APTEK Vol. 4 No. 2 (2012): APLIKASI TEKNOLOGI
Publisher : Universitas Pasir Pengaraian

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (488.665 KB) | DOI: 10.30606/aptk.v4i2.65

Abstract

Rokan Hulu regency government is very concerned with people's needs for clean water for the most budget Rokan Hulu regency government owned companies to build infrastructure through water distribution unit called the Badan Pengelolaan Air Bersih (BPAB), one unit of water distribution net is BPAB Pematang Barangan-Pasir Putih. A water distribution unit is a group function, system, sub system, and item components are complete and mutual support for the smooth operation and water distribution.In water distribution unit BPAB Pematang Barangan for water distribution system using a centrifugal pump, with sub pump system with a single puff volut brands Ebara PUMP. To reduce the downtime of time it needs to be done to improve the availability of treatment / usability (availability) in the system function. In order to serve the function of the system can then use Reliability Centered Maitenance(RCM) method to be implemented by means of qualitative analysis on the component item that can be analyzed in detail the use of Failure Mode Effect Analisys (FMEA), Logic Tree ANALISYS, and Maintenance Task.
ANALISA PENYEBAB KEGAGALAN PIPA SUPERHEATHER BOILER Fahrizal -
Jurnal APTEK Vol. 5 No. 1 (2013): APLIKASI TEKNOLOGI
Publisher : Universitas Pasir Pengaraian

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (826.195 KB) | DOI: 10.30606/aptk.v5i1.75

Abstract

This work operationts tube superheater boiler has operated by PT.Rohul Sawit Indah to determain steam and electricity power plants get failure. The failures can be make some troubles for producing at the factory. So that still need risets to the resource failure. In this cases very important to create preventif maintenance and improoving for the future. We do not hope any trouble more.In the analysis of failures need testing methode for example using Destructive and Non Destructive Testing Methods like visual, chemical composition, hardnes and metalofgrafi.From this riset should determaind same probabilities about same failure cause of quality water and envirenment to pill the boiler and modes of superheater piping, superheater is creep that operation by high temperature and high pressure with need long priode by following anealing overloads and failure.
ANALISIS AVAILIBILITYKINERJA BOILER PADA PT. ROHUL SAWIT INDAH Fahrizal -
Jurnal APTEK Vol. 6 No. 2 (2014): APLIKASI TEKNOLOGI
Publisher : Universitas Pasir Pengaraian

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (442.318 KB) | DOI: 10.30606/aptk.v6i2.104

Abstract

To support optimal results in the processing of palm fruits into palm oil (crude palm oil), the conditionsin the boiler must be properly maintained and operated properly, so that the process of production activity isnot impaired. In boiler operations often suffer disturbance, damage in minor life, namely the outbreak ofsuperheater pipes, it is very disturbing production activities.This study aimed to calculate the performance Availabilityoperated boiler in order to reduce thephysical components are not damaged during normal operation and case unplanned maintenance activities.It is very important in order to achieve a more efficient and economical operation of the plant andequipment.