Claim Missing Document
Check
Articles

Found 2 Documents
Search

Analisis Perubahan Luas Void Bekas Tambang Batubara Menggunakan Metode NDWI Di PT. Tebo Prima Kabupaten Tebo Oktavia, Marisa; Rahmawati, Devit; desmawita, Desmawita; Marliantoni, Marliantoni; Muslim, Muslim
Innovative: Journal Of Social Science Research Vol. 5 No. 1 (2025): Innovative: Journal Of Social Science Research
Publisher : Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/innovative.v5i1.17689

Abstract

P.T Tebo Prima is a company engaged in coal mining which is located in the village of Sungai Bengkal Village. The mining method used is open pit mining using this method will cause an impact in the form of former mining holes which are commonly called voids. The aims of this research are to; Analyzing Existing Void Water Bodies Using the NDWI Method, and Analyzing Changes in Boundary Areas of Water Bodies. This study uses remote sensing-based data in the form of aerial photo data and Landsat 8 OLI/TIRS imagery. The method used in this study is the NDWI (Normalized Difference Water Index) method to compare the level of wetness in satellite images. This research uses Google Earth Pro, Global Mapper, and Surfer software. Based on the results of image data processing on the Global Mapper software, the area of ex-coal mining voids in May 2019 was 1.77 Ha, June was 1.33 Ha, July was 2.25 Ha, October was 2 ,77 Ha. Factors that  affect  changes  in the area of  water bodies  in the  voids are; Changes  in soil sedimentation in water bodies due to erosion by water There is water intrusion that enters through small rivers around the void, high rainfall in how many months so that it increases the water discharge in the void.   Keywords: Void; Change in Existing Void Area; NDWI
Penjadwalan Produksi Batubara Berdasarkan Net Present Value (NPV) Optimal Desmawita, Desmawita; Aprianto, Asrul; Rahmawati, Devit; Marliantoni, Marliantoni; Oktavia, Marisa
Innovative: Journal Of Social Science Research Vol. 5 No. 4 (2025): Innovative: Journal Of Social Science Research
Publisher : Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/innovative.v5i4.19697

Abstract

PT Tebo Prima akan melakukan penambangannya di sebelah barat, tepatnya di blok D1 site rantau api dengan target produksi 240.000 ton/bulan. Adanya ketidak tercapaian produksi pada bulan sebelumya sehingga perlunya suatu perhitungan yang logis dalam upaya memenuhi pencapaian target produki dengan tujuan mendapatkan keuntungan optimal. Skenario penambangan dirancang sebanyak 3 (tiga) yaitu skenario A, B, dan C dengan masing-masing skenario memiliki 3 (tiga) Sequence, rancangan Sequence berdasarkan target produksi pertahun sebesar 2.880.000 ton. Perhitungan cash flow dihitung pada masing-masing skenario, dimana masing-masing cash flow skenario penambangan A, B dan C sebesar $ 39.319.458,07. Sehingga diperoleh perhitungan NPV skenario penambangan A sebesar $ 24. 291.678,44, NPV skenario penambangan B sebesar $24.553.849,99 dan NPV skenario penambangan C sebesar $ 24.684.109,49. Berdasarkan hasil perhitungan yang dilakukan, nilai NPV optimal berada pada skenario penambangan C dengan nilai NPV sebesar $24.684.109,49 nilai NPV skenario penambangan C positif (+) hal ini menunjukan proyek layak secara ekonomis.